Main reinforcement construction methods of steel workshop building reinforcement

Time:[2022-2-17]  Hits:2039

The reinforcement of reinforced concrete structures has been seen a lot, but do you know how to do the reinforcement of steel structures? Where are the common steel workshop building reinforcements generally used? Common steel workshop building reinforcement is mostly used in cooling towers, steel workshop buildings, steel structure interlayers and other places.

The main methods of strengthening the steel workshop building are:

Reduce the load, change the calculation graphics, increase the cross-section and connection strength of the original structural members, and prevent crack propagation. When there is mature experience, other reinforcement methods can also be used.

The identified steel structures that need to be reinforced are generally divided into local reinforcement and comprehensive reinforcement according to the scope of damage. Local reinforcement is the reinforcement of a bar or connecting node with insufficient bearing capacity.

Comprehensive reinforcement is the reinforcement of the overall structure, there are two types of reinforcement methods without changing the structure static calculation graphics and changing the structure static calculation graphics. Adding or strengthening the support system is also an effective way to strengthen the structural system. The reinforcement method of increasing the original member section is the most expensive and labor-intensive method (but it is often a feasible method); the method of changing the calculation diagram is the most effective and diverse, and its cost is also greatly reduced.

The construction methods of the reinforcement structure of the steel workshop building are as follows:

Load reinforcement, unload reinforcement, and removal of parts that should be reinforced or updated from the original structure for reinforcement. The construction method for the reinforcement of the steel workshop building should be determined by the designer and the construction unit through consultation according to the user's requirements and the actual stress state of the structure, under the premise of ensuring quality and safety.

(a)Reinforcement with load: the construction is the most convenient and economical. It is used when the stress of the component (or connection) is less than 80% of the design strength of the steel, or when the component is not significantly damaged (broken, deformed, warped, etc.). At this time, in order to make the new reinforced rod participate in the force, sometimes it is necessary to take temporary unloading measures for the reinforced rod. In addition, care should be taken not to affect the normal use of other components during reinforcement.

(b) Unloading reinforcement: It is suitable for when the structural damage is large or the stress state of the components and connections is very high, and its load needs to be temporarily relieved. For some structures that mainly bear movable loads (such as crane beams, etc.), their movable loads can be limited, which is equivalent to most of the unloading.

(c) Remove the parts that should be reinforced or updated from the original structure: when the structure is severely damaged or the bearing capacity of the original section is too small, it must be reinforced or updated on the ground. At this time, temporary support must be provided to completely unload the replaced component; at the same time, the safety of the entire structure must be guaranteed after the replaced structure is removed.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 免费国产片| 俄罗斯胖老太性bbww| 日韩av片免费播放| 美团外卖37分钟做0video| 免费公开在线视频| 最新露脸国产精品视频| 在线观看视频高清视频| 玖玖国产| 欧美高清正版在线| 欧美金发大战黑人最粗videos| 久草资源| www.免费| 一个人日本的视频免费完整版| 日本午夜伦理| k逼视频| 女人跪着吃男人j动态图| 91精品国产手机在线版| 操的好爽视频| 就要干就要草| 92精品国产自产在线观看48页| 俄罗斯老少配xxxxhd| 一级一级一片在线观看| 操操操综合| 日韩免费视频一区二区| 别揉我胸啊嗯上课呢老师视频| 日韩岛国大片| 波多野结衣中文| 538这里有精品视频4| 在线免费观看国产| 又大又硬又爽又粗又快的视频免费| ssswww日本免费网站片| 日本大学生第一次三级| 一级毛片免费视频网站| 高清乱码精品福利在线视频| 日韩成人综合网| 日韩在线免费视频| 久久99久久99精品免观看不卡| 3d动漫美女被乳羞羞动画| 久操免费在线视频| 欧美性xxxx18| 一个人看的视频在线观看hd|