www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Preparation for steel structure installation of prefab industrial buildings
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.huihuitaotao.cn

Preparation for steel structure installation of prefab industrial buildings

Time:[2022-3-14]  Hits:2040

With the continuous development of economy, diversified architectural structures have entered our daily life. Develop prefabricated buildings such as prefabricated concrete structure, steel structure and modern wood structure according to local conditions. Steel structure prefabricated buildings are widely used in different types of fields such as industry, commerce, agriculture and so on. The fast installation method is conducive to the rapid completion of the industry and get a good development trend.

The contents and requirements of steel structure installation preparation of prefab industrial buildings are the same as those of ordinary steel structure installation works. During the construction of steel column foundation, the positioning and protection of anchor bolts shall be done well, and the top elevation of foundation and anchor bolts shall be controlled. After foundation construction, inspection and acceptance shall be carried out according to the following contents:

(1) Whether the axis position of each row and column is correct;

(2) Whether the span of each span meets the design requirements;

(3) Whether the elevation of foundation top meets the design requirements;

(4) Whether the position and elevation of anchor bolts meet the design and specification requirements.

Before the hoisting of components, the shape and section geometric dimensions of components shall be inspected according to the relevant provisions in the <<Code for construction and acceptance of steel structure engineering>> and the deviation shall not exceed the value specified in the specification; The components shall be numbered according to the requirements of the design drawings, highlighting the installation center mark. The center mark and elevation mark in two directions shall be popped up for the steel column; Mark the position of binding point; The length of the column should be measured, and the length error should be recorded in detail. It should be written on the plane beside the center mark of the lower part of the column with oil pen, so that it can be adjusted in the two grouting layer of the top elevation of the foundation.

Components entering the construction site must have quality assurance and detailed acceptance records; It shall be stacked in the designated area according to the type, model and installation sequence of components. Enough supporting surface shall be provided for the component stratum skid to prevent the fulcrum from sinking; When components of the same model are stacked, the fulcrum of each layer of components shall be on the same straight line; The deformed components shall be corrected in time and can be installed only after passing the inspection.

Following the contents of the specification, the construction party effectively prepares for installation and provides favorable conditions for the installation of the main steel structure of the prefab industrial buildings. For the construction of steel column foundation, implement the work details and do the work well, which is more conducive to the later installation of steel structure. The normal use of prefab industrial buildings is closely related to the installation preparation. Relevant construction party shall make preparations for the installation of prefab industrial buildings.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 摘花过程处乌克兰| 欧美日韩一二三区| 乱欲美女| 漫画美女被| 99高清免费国产自产拍| 一级特黄a 大片免费| 青青青青青青久久久免费观看| 九一果冻制品厂免费| 美女被羞羞产奶动漫| 第一次处破女18分钟免费| 8x成人| 欧美国产日韩久久久| 青青青青久在线观看视频| 口工动漫在线观看| chinese同志gay露脸飞机| 日韩精品区| 日本高清中文字幕一区二区三区a| 欧美日韩中文亚洲另类春色| 最新在线精品国自拍视频| 9984四虎永久免费网站| 91挑色| 久热这里只精品99re8久| 欧美多人三级级视频播放| 91美女诱惑| 久久精品一区二区国产| jiucao视频在线观看| 99在线热视频只有精品免费| 男女xxoo做爰猛烈动态图小说| 久久久国产这里有的是精品| 成人欧美一区二区三区视频| 69堂免费视频精品| 巨黑巨粗巨硬巨大的黑吊| 男人插女人的逼视频| 欧美同性videosbe| 免费精品久久| 欧美肠交| 免费男人狂躁女人在线看免费| 麻豆观看| 在线观看亚洲免费| 久久精品国产亚洲麻豆小说| 中国黄色影片|