Importance of structural design of multi-storey prefabricated workshop building

Time:[2022-4-29]  Hits:1973

In recent years, with the development of the diversity of the world economy, the industrial production of various countries and regions has also been continuously improved, and the complexity of the process layout is a revolutionary change for the industrial workshop buildings with single production function and simple building layout in the past; At the same time, the popularization of computers and the integration and simplification of structural calculation software have solved the complex and cumbersome structural calculation problems. As a result, multi-storey and even high-rise productive industrial buildings with large span, large space and complex building layout have emerged. Under the background of such rapid development, the rational selection of building structure layout and design parameters has played an important role in structural design.

1. Characteristics of multi-storey prefabricated workshop building

1.1 plane structure layout and column grid layout

In the plane layout of multi-storey prefabricated workshop building, usually in order to meet the process requirements: the structural layout is irregular, the pole network is irregular, and the beam layout is irregular, so there is the phenomenon of opening holes on the main stressed components according to the process requirements. At the same time, the internal space of the workshop building is generally large, and the column spacing is mostly 6 ~ 12m; The same part has the design of pulling column; The column spacing will increase to more than 18m. This makes the force transmission of the structure complex, the force is not clear, and the phenomenon of stress concentration is easy to occur in the design.

1.2 vertical structure layout and floor height

The storey height of multi-storey prefabricated workshop building is large, which can reach 4 ~ 8m, and there are often staggered floors and interlayer in the vertical layout, and large holes are opened in the floor, which makes the floor unable to provide sufficient in-plane stiffness, and the effective mass of the structure is unevenly distributed along the vertical direction. Under the action of earthquake, the structure may produce "short column effect", which makes the horizontal shear force of local column section become the control factor of section design.

1.3 various types of loads

The concentrated load of industrial workshop building mainly includes the self weight of equipment, and sometimes the vibration disturbance of equipment needs to be considered, and the dynamic calculation is carried out according to the requirements of the specification. Suspension load mainly includes pipeline load and crane load, and sometimes the pipeline also produces horizontal load and bending moment. The plate surface load is mainly based on the requirements of production technology. There are different values of live load on the ground of different production buildings, but this kind of live load is generally greater than that in civil buildings.


1.4 floor and foundation form

The cast-in-situ reinforced concrete floor is generally adopted for the floor of industrial workshop building. However, due to the equipment load requirements proposed by the process, the floor may have holes or local thickness changes. The foundation form of the powerhouse mostly adopts the independent foundation under the column and the strip foundation under the column. If the bearing capacity of the foundation is low, the lime soil compaction pile, sand pile and other methods can be used to deal with it, or the cast-in-place pile can be used to act directly on the hard soil layer.

1.5 light envelope

Generally, the enclosure structure of industrial workshop building is not used as a load-bearing system, and light materials are usually used. The roof structure mostly adopts steel truss purlin system with light insulation layer. This light enclosure material is beneficial to reduce the self weight of the structure and reduce the seismic response.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 麻豆视频大全| 岛国一区| 日韩在线高清| 日韩精品一区二区三区国语自制| 成年男女男精品免费视频网站| 免费视频久久久| 99视频国产热精品视频| 动漫一级毛片| 日韩1区| 游侠索罗星球大战外传高清在线观看| 久久久久久久一精品| 免费特级黄毛片| 日韩精品一区在线| 日本人妖在线观看| 免费看欧美一级特黄a大片| 男人躁女人全过程视频| 奇米影视777欧美在线观看| 欧美综合在线播放| 欧美丝袜激情办公室在线观看| 青草香蕉视频| 一个人www在线高清观看| 亚洲综合在线视频| 免费人成网555www| 日本中文字幕在线观看| 91日本在线精品高清观看| 风间由美bd456高清在线| 免费看逼网站| 男同志gaygay免费中国| 农村野jizz外jizz农民| 997在线观看视频国产| xxx在线| 中文字幕免费在线看| 日韩在线一区高清在线| 大胸美女洗澡扒奶衣挤奶| ssss国产在线观看| 99re热在线视频| 在线综合色| 久草免费福利| 在线日本中文字幕| 高h无遮挡免费漫画3d| 99久久大香伊蕉在人线国产|