Problems needing attention in the process of steel structure construction

Time:[2022-8-29]  Hits:2234

The steel structure construction project has become more and more popular in recent years, and the problems to be paid attention to in the construction process are particularly important. Generally, many safety problems can be avoided only by the following points. Next, I'll talk to you.

 

First, the size of reinforcement holes shall be reserved before and after construction


In particular, the holes on the section steel can be as small as possible, so that the steel can have good strength. In addition, the loss of profile steel shall be reduced to facilitate construction. In addition, when drilling the steel structure, the two symmetrical sides of the reinforcement shall be taken into account. It is particularly noted that the edge of the reinforcement with a diameter greater than 25mm may increase the diameter of the reinforcement by 1 ~ 2mm.


Second, the position of reinforcement holes must be reserved in advance


When drilling, the upper, lower, left and right positions shall be aligned accurately, otherwise it will be very difficult to pass through the reinforcement. If the information of the construction party responsible for the construction of section steel is inconsistent with that of the civil construction party in the practice of steel structure construction, the two parties need to communicate in time during the construction process.


Third, installation details of bottom steel column


If the embedded steel column at the bottom is light, we can use machinery for lifting, and manual position calibration can be done. This has many advantages.


First, the accuracy of the mounting position can be ensured; Second, because the component processing plant has completed the foundation fabrication of the steel column, the center of the profiled steel column and the center of the base plate must be coincident during fabrication, so the corresponding outer contour is parallel; Third, use the tower crane or other auxiliary installation machinery to lift the foundation embedded column, and then slowly lower the foundation embedded column. In this way, the four corners of the column base plate are aligned with the contour line, and the base plate of the column base is on the mat. Striking while the iron is hot will save time and labor, and can greatly improve the progress of the steel structure construction.


In addition, we can calibrate the position of the foundation embedded column with the help of two theodolites. Then fix the two theodolites on the vertical and horizontal axes of the column, and then move the position of the column to make the front center line of the column coincide with the viewpoint of the two theodolites, which can ensure the verticality of the column.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 91亚洲精品自在在线观看 | 免费a级大片 | 一级特黄aaa大片29 | 三级精品视频在线播放 | 久久大香萑太香蕉综合网 | 免费看美女禁处爆涌视频 | 亚洲国产精品免费在线观看 | 亚洲一区网站 | 色综合久久88色综合天天小说 | 玉足调教| 欧美足恋footjob脚 | 天干夜天干天干国产 | 欧美xxxx印度 | 日本在线中文 | 午夜影视在线免费观看 | 99视频精品全部在线播放 | 日韩精品亚洲一级在线观看 | 色爱区综合 | 美女把屁屁扒开让男人玩 | 亚色最新网址 | 青草青视频在线观看 | 五月婷婷之综合激情 | 琼明神女录在线 | 色吧中文网 | 91女神娇喘| 欧美小视频在线观看 | 欧美成人资源视频影音先锋 | 天天cao| 操的好爽视频 | 色欲香天天天综合网站 | 亚洲最新中文字幕 | 主人在调教室性调教女仆照片 | 亚洲第二十页 | 亚洲男人天堂影院 | 2018久久久国产精品 | 日本中文字幕在线 | 免费播放特黄特色毛片 | 福利cos大尺度液液酱 | 免费看一片 | 一级毛片在线免费播放 | 亚洲视频男人的天堂 |