www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Control of welding process elements in steel structure design engineering
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.huihuitaotao.cn

Control of welding process elements in steel structure design engineering

Time:[2022-10-19]  Hits:1391

The steel structure planning project has extremely high strength, and better construction effect can be achieved when the plant floor is higher or the span is larger. However, many actual constructors in our country know little about the steel structure project, so they can't really grasp the welding key of the steel structure planning project, which has a certain impact on the final quality of the steel structure project. Therefore, in order to improve the construction quality of steel structure planning and construction, it is necessary to strictly control and control the welding part of the steel structure project to ensure the quality of the steel structure planning project and promote the continuous updating of the construction profession and construction skills.


1. Control of process factors


1.1 Control of pre welding preparation of steel structure planning project


Preparation before welding of steel structure planning mainly refers to groove preparation, welding equipment and cleaning of welding area.


(1) Preparation of groove: the processing of welding groove directly affects the quality of welding operation, so it should be operated strictly according to the steel structure planning process; Attention shall also be paid to the fact that the raw materials, specifications and types of the arc tab groove of the steel structure planning shall be the same as those of the base metal.


(2) Welding device: the device quality not only affects the dimensions of the steel structure planning components, but also has a certain impact on the weld formation. When welding the device, it is necessary to consider whether it is easy to weld after the device. If the device affects the normal welding of individual steel structure planning welds, it is necessary to weld this weld before installing other parts. All welding materials of the device shall match with the base metal, and the spot welding height shall not exceed 2/3 of the planned weld height of the steel structure.


(3) Cleaning of planned welding area of steel structure: oil stain, rust, dust, etc. on both sides of the joint shall be completely removed to prevent blowholes and cracks in the planned weld of steel structure.


1.2 Control of welding sequence


Selecting a reasonable welding sequence for steel structure planning can reduce the deformation degree of components and prevent the occurrence of cracks. Therefore, when selecting the welding sequence for steel structure planning, the welding seam should be in a relatively free shortening state as far as possible. The welding seam with a large shortening amount should be welded first, and then the welding seam with a small shortening amount, so as to ensure that the planned welding seam of steel structure has a large shortening freedom during welding and a small planned residual stress of steel structure occurs.


1.3 Control of welding process specification parameters


The welding process specification parameters of steel structure planning mainly include welding specification parameters, preheating temperature, post heat and hydrogen elimination treatment, post weld heat treatment, etc. The welding specification parameters are clearly specified in the process, and the steel structure planning workers should strictly follow the process. The selection of welding current and arc voltage for steel structure planning shall be emphasized. The current is too small and the arc is unstable, which is easy to cause slag inclusion, incomplete penetration and other defects; If the current is too large, undercut, air hole, welding and other defects are easy to occur, and they are added together by splashing. Long arc means high arc voltage, unstable arc burning, spatter addition, small penetration, and external air intrusion, which constitute the defects of air hole incomplete penetration.

 


The steel structure planning project is widely used in industry and public construction, and the welding process is the key process in the steel structure processing and manufacturing. Strengthening the quality control of the welding process can not only improve the quality of steel structure planning products, but also have a very important effect on the quality of the entire steel structure planning project. Based on this, this paper mainly discusses the key points of welding quality control in steel structure planning project.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 欧美一级美片在线观看免费| 麻豆高清视频在线观看| 美女的隐私蜜桃传媒免费看| 六月婷婷中文字幕| 中国xxnx| 夜夜撸在线影院| 曰批视频免费40分钟野战| 热久久国产最新地址获取| 大地在线观看免费完整版| 一区二区日本| 在线观看中文字幕2021| 在线视频综合视频免费观看| 91精品隔壁老王在线观看| 日本高清在线观看视频www| 23部禽女乱小说| 日韩手机看片福利精品| 成人国内精品久久久久影| 啊好大好爽视频| 91草莓视频在线观看| 前所未有的深入在线观看| 多男玩一女的黄暴小说| 99精品视频在线免费观看| 青青热久免费精品视频在线观看| vodafonewifi精品| 免费鲁丝片一级在线观看| 动漫美女被调教| 免费看美女禁处爆涌视频| 久色99| 1769资源入口资源站| 9久久免费国产精品特黄| 最美情侣免费观看视频2019| 欧美日韩在线播放成人| 久久精品国内一区二区三区| 久久er国产精品免费观看2| 亚洲综合区小说区激情区噜噜| 日本一本久草| 一本岛高清v不卡免费一三区| 九九久久国产精品免费热6| 美味的妻子在线观看| 春日樱桃小说| 91se在线观看|