Control of welding process elements in steel structure design engineering

Time:[2022-10-19]  Hits:1847

The steel structure planning project has extremely high strength, and better construction effect can be achieved when the plant floor is higher or the span is larger. However, many actual constructors in our country know little about the steel structure project, so they can't really grasp the welding key of the steel structure planning project, which has a certain impact on the final quality of the steel structure project. Therefore, in order to improve the construction quality of steel structure planning and construction, it is necessary to strictly control and control the welding part of the steel structure project to ensure the quality of the steel structure planning project and promote the continuous updating of the construction profession and construction skills.


1. Control of process factors


1.1 Control of pre welding preparation of steel structure planning project


Preparation before welding of steel structure planning mainly refers to groove preparation, welding equipment and cleaning of welding area.


(1) Preparation of groove: the processing of welding groove directly affects the quality of welding operation, so it should be operated strictly according to the steel structure planning process; Attention shall also be paid to the fact that the raw materials, specifications and types of the arc tab groove of the steel structure planning shall be the same as those of the base metal.


(2) Welding device: the device quality not only affects the dimensions of the steel structure planning components, but also has a certain impact on the weld formation. When welding the device, it is necessary to consider whether it is easy to weld after the device. If the device affects the normal welding of individual steel structure planning welds, it is necessary to weld this weld before installing other parts. All welding materials of the device shall match with the base metal, and the spot welding height shall not exceed 2/3 of the planned weld height of the steel structure.


(3) Cleaning of planned welding area of steel structure: oil stain, rust, dust, etc. on both sides of the joint shall be completely removed to prevent blowholes and cracks in the planned weld of steel structure.


1.2 Control of welding sequence


Selecting a reasonable welding sequence for steel structure planning can reduce the deformation degree of components and prevent the occurrence of cracks. Therefore, when selecting the welding sequence for steel structure planning, the welding seam should be in a relatively free shortening state as far as possible. The welding seam with a large shortening amount should be welded first, and then the welding seam with a small shortening amount, so as to ensure that the planned welding seam of steel structure has a large shortening freedom during welding and a small planned residual stress of steel structure occurs.


1.3 Control of welding process specification parameters


The welding process specification parameters of steel structure planning mainly include welding specification parameters, preheating temperature, post heat and hydrogen elimination treatment, post weld heat treatment, etc. The welding specification parameters are clearly specified in the process, and the steel structure planning workers should strictly follow the process. The selection of welding current and arc voltage for steel structure planning shall be emphasized. The current is too small and the arc is unstable, which is easy to cause slag inclusion, incomplete penetration and other defects; If the current is too large, undercut, air hole, welding and other defects are easy to occur, and they are added together by splashing. Long arc means high arc voltage, unstable arc burning, spatter addition, small penetration, and external air intrusion, which constitute the defects of air hole incomplete penetration.

 


The steel structure planning project is widely used in industry and public construction, and the welding process is the key process in the steel structure processing and manufacturing. Strengthening the quality control of the welding process can not only improve the quality of steel structure planning products, but also have a very important effect on the quality of the entire steel structure planning project. Based on this, this paper mainly discusses the key points of welding quality control in steel structure planning project.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 东北老妇露脸xxx | 午夜看片网站 | 女王羞辱vk | aaa在线视频| 欧美一级高清在线观看 | 人人舔人人爱 | 青青青在线视频播放 | 免费播放全黄录像带 | 欧美日韩不卡一区 | 日韩成人中文字幕 | 2017亚洲男人天堂 | 抽搐一进一出gif免费 | 一二三四国语在线观看 | 五月天丁香婷婷综合久久 | 又粗又大又爽又紧免费视频 | 日本不卡免费新一区二区三区 | 老师您的兔子好软水好多动漫视频 | 久青草国产免费观看 | 免费观看视频在线观看 | 午夜视频网站在线观看 | 6080yy 久久 亚洲 日本 | 91制片厂制作果冻传媒星 | 久久九九热re6这里有精品 | 欧美精品午夜 | xxxx日本护士| 欧美五月婷婷 | 五月激情综合丁香色婷婷 | 亚洲国产成人久久午夜 | 男人的j插女人的p | 伦理午夜| 三级黄色在线视频 | 男男浪荡h啪肉np | 亚洲 欧美 精品 中文第三 | 91麻豆传传媒波多野衣久久看 | 天堂新版8中文在线8 | 中文字幕在线精品视频入口一区 | 天天爱天天做天天爽夜夜揉 | chinese国产人妖网站视频 | 日韩一级在线 | 中文字幕视频在线 | 青娱乐最新视频 |