Control of welding process elements in steel structure design engineering

Time:[2022-10-19]  Hits:2063

The steel structure planning project has extremely high strength, and better construction effect can be achieved when the plant floor is higher or the span is larger. However, many actual constructors in our country know little about the steel structure project, so they can't really grasp the welding key of the steel structure planning project, which has a certain impact on the final quality of the steel structure project. Therefore, in order to improve the construction quality of steel structure planning and construction, it is necessary to strictly control and control the welding part of the steel structure project to ensure the quality of the steel structure planning project and promote the continuous updating of the construction profession and construction skills.


1. Control of process factors


1.1 Control of pre welding preparation of steel structure planning project


Preparation before welding of steel structure planning mainly refers to groove preparation, welding equipment and cleaning of welding area.


(1) Preparation of groove: the processing of welding groove directly affects the quality of welding operation, so it should be operated strictly according to the steel structure planning process; Attention shall also be paid to the fact that the raw materials, specifications and types of the arc tab groove of the steel structure planning shall be the same as those of the base metal.


(2) Welding device: the device quality not only affects the dimensions of the steel structure planning components, but also has a certain impact on the weld formation. When welding the device, it is necessary to consider whether it is easy to weld after the device. If the device affects the normal welding of individual steel structure planning welds, it is necessary to weld this weld before installing other parts. All welding materials of the device shall match with the base metal, and the spot welding height shall not exceed 2/3 of the planned weld height of the steel structure.


(3) Cleaning of planned welding area of steel structure: oil stain, rust, dust, etc. on both sides of the joint shall be completely removed to prevent blowholes and cracks in the planned weld of steel structure.


1.2 Control of welding sequence


Selecting a reasonable welding sequence for steel structure planning can reduce the deformation degree of components and prevent the occurrence of cracks. Therefore, when selecting the welding sequence for steel structure planning, the welding seam should be in a relatively free shortening state as far as possible. The welding seam with a large shortening amount should be welded first, and then the welding seam with a small shortening amount, so as to ensure that the planned welding seam of steel structure has a large shortening freedom during welding and a small planned residual stress of steel structure occurs.


1.3 Control of welding process specification parameters


The welding process specification parameters of steel structure planning mainly include welding specification parameters, preheating temperature, post heat and hydrogen elimination treatment, post weld heat treatment, etc. The welding specification parameters are clearly specified in the process, and the steel structure planning workers should strictly follow the process. The selection of welding current and arc voltage for steel structure planning shall be emphasized. The current is too small and the arc is unstable, which is easy to cause slag inclusion, incomplete penetration and other defects; If the current is too large, undercut, air hole, welding and other defects are easy to occur, and they are added together by splashing. Long arc means high arc voltage, unstable arc burning, spatter addition, small penetration, and external air intrusion, which constitute the defects of air hole incomplete penetration.

 


The steel structure planning project is widely used in industry and public construction, and the welding process is the key process in the steel structure processing and manufacturing. Strengthening the quality control of the welding process can not only improve the quality of steel structure planning products, but also have a very important effect on the quality of the entire steel structure planning project. Based on this, this paper mainly discusses the key points of welding quality control in steel structure planning project.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 校园文化设计|文化墙建设|校园景观雕塑|校史馆设计-深圳市天合文化 | 深圳市桃子自动化科技有限公司-点胶机_灌胶机_焊锡机_螺丝机_SCARA机器人 | 首页 网络安全与数据治理(原《信息技术与网络安全》) | 砂浆生产线_干混砂浆设备_干混砂浆生产线-苏州一工机械有限公司 砂基透水砖滤水率,防滑性试验仪,砂基透水砖落球冲击,抗冲击试验机-献县中正试验仪器销售处 | 徐州户外广告,标识标牌,展陈空间,精神堡垒-徐州雅努思文化发展有限公司 | 液位变送器_智能压力变送器_3051差压变送器_单双法兰,投入式,电容式,温度变送器-淮安润中仪表科技有限公司 | 输送机|滚筒输送机|皮带输送机|滚筒|无动力滚筒|万向球生产厂家-上海霞韵输送机械设备有限公司 | 上海塑料链条生产厂家-塑料网带批发-柔性齿形链价格-上海瀚幽传动机械有限公司 | 银联POS机_银联微信支付宝刷卡POS机_外币POS机_移动POS机办理安装——谷骐科技 | 温湿度记录仪_温度监控_冷链监控云平台_USB/PDF温度记录仪-深圳市鸿睿物联科技发展有限公司 | 医用手摇病床,医用电动病床,康养手摇病床,康养电动病床-河北丁丁医疗器械有限公司 | 射频微波_微波元器件_芯片_电源模块_Raychem_立维创展 | 凿岩机|操车设备|爬车机|三环链|伞钻|伞型钻机|中心回转抓岩机|往复式给煤机|滚轮罐耳|吊桶|钩头-济宁卓力工矿设备有限公司 | 正宗舌尖上的卤味卤菜卤肉卤水熟食的做法及配方大全网 | 新洲际教育-一站式留学解决方案领航者【官网】 | 加药装置-排油烟装置-工业滤水器-连云港灵动 | 户外工程照明|洗墙灯厂家|聚翔(广东)照明科技有限公司 | 造雪机|人工造雪机|造雪机价格|造雪机厂家-河南晋安机械科技有限公司 | 山东凯达起重机械有限公司-单梁行车,龙门吊,提梁机,门式起重机,悬臂起重机 | 塑料胶水|PVC胶水|PP胶水|橡胶胶水|强力胶水|透明胶水|胶粘剂|粘合剂|UV胶-聚力胶水厂家 | 洗地机,洗地机价格,扫地机,工业吸尘器,手推式洗地机,驾驶式洗地机,北京洗地机【北京高美环保科技有限公司】 | 深圳钢成培训专业从事,五轴培训,车铣复合培训,数控车床,CNC数控编程,模具编程 ,钣金机械与模具设计,powermill,mastercam,solidworks,ug,hypermill培训 | 拉丝模|高晶异形拉丝模|联合拉拔机模具|钼丝拉丝模|金刚石纳米涂层模|焊丝拉丝模|钨钢拉丝模|聚晶拉丝模_河北恩泰利嘉金属制品有限公司 | 无锡市钧辉机械制造有限公司| 家电|想认识品茶妹子?这份攻略手把手教你 | 粘土耐火砖,低气孔耐火砖-山东耐火材料 | 苏州新闻网_苏州最权威资讯| 精密齿轮,同步带轮,蜗轮,蜗杆,减速机齿轮,行星齿轮-和兴齿轮 | 精品中文字幕在线观看,粉嫩av一区二区三区,最近中文字幕在线看免费视频,亚洲高清在线观看,日本一区二区视频手机免费看,国产黄色小视频,亚洲高清免费视频,国产精品一区二区欧美视频,亚洲人免费视频,亚洲视频在线观看免费,国产免费高清综合视频,中文字幕永久在线 | 南京空压机出租,发电机租赁,南京牧德田空压机租赁回收公司 | 排水PVC管-PVC排污管-给水PVC管-电线PVC管-米阳建材pvc管厂 | 专业提供医疗器械,医疗设备,进口国产医疗设备,医疗耗材采购,医疗设备厂家等医疗器械信息-上海聚慕医疗器械有限公司 | 仪器校准-计量检测-计量校准-中健计量检测(广东)有限公司 | 石墨热场|PECVD石墨舟|碳碳框|燃料电池双极板|半导体石墨|光纤用石墨模具|石墨电极加工|石墨制品|上海弘竣新能源材料有限公司 | 内衬不锈钢复合管,大口径内衬不锈钢复合钢管,双金属复合管,内衬不锈钢复合管厂家-江苏新澎 | 洒水车厂家、消防车、污水处理车厂家-程力专用汽车股份有限公司 洒水车|冷藏车|LED广告车|油罐车|道路救援车|垃圾车|程力专用汽车股份有限公司销售九分公司 | 水电站泵站LCU控制屏_发电机保护_变压器保护_逆功率保护_防孤岛保护装置_ 电力微机保护网 | 暖气片_铜铝复合暖气片_钢制散热器厂家-德克菲勒暖气片 | 冷却特性测试仪_ 刀柄热胀仪_加油小车价格_皮带张力仪_上海川奇机电设备有限公司 | 秦皇岛天视影像有限公司,宣传片创意拍摄制作,商业广告拍摄公司,影视影像服务商 - 秦皇岛天视影像有限公司,宣传片创意拍摄制作,商业广告拍摄公司,影视影像服务商 秦皇岛市信恒电子科技有限公司 秦皇岛市华谊彩印有限公司 | 苏州妙凯电子有限公司-供应军工电源芯片|线性恒流IC|开关电源IC|LED驱动芯片|MOS管|IPM|IGBT|MCU开发|电源模块 |