What are the methods for strengthening the components of steel structure factory buildings?

Time:[2022-12-7]  Hits:1796

In steel structure plants, the most common components are steel columns and steel beams, which are a large part of the support and bearing, and the composition of the structure is an important component. The first component of steel structure plant is to be able to select different data to establish and form different data. The natural functions and quality of different data also have certain differences. It can also create different types of plants, such as multi-storey steel structure plant, light steel structure plant, brick concrete structure plant, etc. Only by controlling the quality of related components can the installation quality of all structures be improved.

 


1. Unloading method of steel structure column


When it is necessary to reinforce or replace new columns under unloading, the method of "joist and column replacement" shall be adopted. When only the upper column needs to be reinforced, the roof truss can be supported by crane beam bridge to unload the column. When the lower column needs to be reinforced or the process needs to cut off the lower column, a permanent joist can be set under the crane beam to share the load of the upper column (including the load of the crane beam) on the adjacent column (it is necessary to check the adjacent column and reinforce it, but also check the foundation). When selecting this method, it should be considered that after the joist is used to replace the lower column, the joist will have a certain deflection, forcing the original roof truss to sink, which may damage the connection nodes of the components connected to the roof truss. For this purpose, temporary load can be added on the joist in advance to make the joist have a pre deflection. The order of choosing this method is to strengthen adjacent columns, weld joists and adjacent columns, and add temporary loads Weld joists and center columns, remove temporary loads, and reinforce or cut off lower columns.


2. Reinforcement method of steel structure and steel column


The section of reinforced column in the reinforcement of steel structure workshop. Generally, steel plate or section steel is used to strengthen the section of reinforced column, welding bolts or high-strength bolts are used to connect the column as a whole, and additional supports are added. Add braces to reduce column length and improve positive bearing capacity. The stability of the column is proposed under the condition that the section standard is unchanged; Change the calculation chart to reduce the external force or internal force of the column; The reinforced concrete wrapped around the steel column can obviously improve the bearing capacity of the column.


3. Reinforcement of steel structure column base


There is no reinforcement method for the thickness of the column floor in the reinforcement of the steel structure workshop: add the stiffening rib of the column base to reduce the bending moment of the bottom plate, and pour concrete between the column base steel to make the column base plate become a rigid block, so as to improve the adhesion of the column base surface and eliminate the corrosion of the paint and the column base surface.


There is no reinforcement method for column foot anchor in steel structure workshop reinforcement: add additional anchor. Select when the concrete foundation is wide.


Drill holes on the concrete foundation, insert additional anchor rods, pour epoxy mortar or sulfur mortar (the hole diameter is 20 mm for the anchor rod, and the depth is more than 30 d), and wrap the entire column base with reinforced concrete. The new reinforcement shall extend into the foundation and be welded with the original reinforcement in the foundation.


4. Checking calculation of bearing capacity of steel structure column reinforcement


The important problem of reinforcement accounting under load is whether the stress after reinforcement can be redistributed, that is, whether the original section after reinforcement can distribute the original stress to the newly reinforced member section. If it can be redistributed, the sum of new and old loads can be evenly distributed to the new and old sections, otherwise the original load will still be borne by the original section, and the new and old loads will be evenly shared by the new and old sections (i.e. the total section after reinforcement).


So far, the redistribution of stress after reinforcement has not been fully proved by experiments (at least in the elastic stage), but for static loaded structures, when a part of the section enters the plastic situation, the stress will eventually be redistributed, so the static loaded structures can be accounted for by working together with new and old sections; In the case of dynamic load structure, the plastic zone is difficult to form, without considering the redistribution of stress, the situation before and after reinforcement is calculated separately, and then the sum is calculated.


The above problems do not exist when strengthening under unloading. Under the unloading condition, the section checking calculation shall be based on the total section after reinforcement, and the reinforcement reduction coefficient shall be considered. It shall be calculated according to the current standard, that is, according to the static load checking formula of the reinforcement section effect under the load condition. The same is true for the bar frame members and beams.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 四川蜀易控科技有限公司-酒店客房控制系统-智慧酒店智能化客房控制系统生产厂家 | 新一能-配电箱、变频柜、plc控制柜、开关柜生产厂家 | 型材散热器,电子散热器,插片散热器-镇江市科创电子散热器有限公司 | 可燃气体报警器-有毒有害气体检测仪-气体检测分析系统-宁波市高品科技有限公司 | 潍坊特钢集团有限公司 | 重庆自考网-重庆自学考试| 液晶拼接屏_三星46寸/55寸/LG液晶拼接屏_深圳拼接墙厂家_电视大屏幕液晶拼接_高清工业级液晶监视器 | 卧式镗铣床,道斯镗铣机床加工中心-江苏道斯数控科技有限公司 | 武汉净化机-武汉全热新风换气机-武汉静音送风机-武汉东信新风节能设备有限公司 | 慢直播摄像头厂家,监控直播摄像机厂家,景区慢直播设备,rtmp推流直播摄像头,实时摄像头监控直播-监控慢直播厂家:专注监控慢直播系统解决方案 | 火绒杀毒软件|火绒安全企业版_西南|四川|重庆|贵州|云南|西藏|成都火绒服务中心_成都火影科技有限公司-火绒安全|成都火影科技|火绒 | 山东货架厂家,重型货架,阁楼货架,钢平台,板材货架-山东智造仓储设备有限公司 | 精密电动平移台|光学隔振平台|手动位移台|隔振平台|电动滑台-北京集科仪器 | 环球医网 | 带来健康生活...| 在线腐蚀率仪,在线污垢热阻仪,靶式光源仪-北京同德创业科技有限公司 | 无负压供水设备-杭州勤铭机电有限公司 | 雾度计-雾度仪-透光率测试仪-3nh品牌雾度仪生产厂家 | 天津佳创博为科技有限公司|AGV控制器|无人搬运车|磁导航传感器|AGV专业零配件 | 远程供电系统-电源发生器-隔离电源转换器-深圳市安博特电源设备有限公司 | 深圳市佳顺优印印刷有限公司,佳顺优印,画册印刷,海报印刷,封套印刷,手提袋印刷,包装盒印刷,彩盒印刷,无碳纸印刷,不干胶印刷,信封印刷,便笺印刷,笔记本印刷,台历印刷,挂历印刷,国际会展中心附近印刷厂,宝安印刷厂,宝安教材印刷厂 | 襄阳燃烧器厂家-低氮燃烧器价格-河北五通道燃烧器就找襄阳市胜合燃力设备有限公司一站式服务 | 莫非传媒官网-江西知名的网络营销推广服务平台南昌网络公司,专业网络公关,品牌危机处理,网站SEO优化,微信朋友圈广告,网站建设,南昌莫非文化传媒有限公司 | 山东汇河环保科技集团有限公司,水囊水袋,水罐,油囊,预压水袋,吊重水袋_山东汇河环保科技集团有限公司,水囊水袋,水罐,油囊,预压水袋,吊重水袋 | 普利卡管|普利卡管接头|普利卡接头-上海闵彬管业有限公司 | 希希助培是专业的教育信息化全场景服务商,为教育培训机构提供教务管理、招生营销、财务管理、家校互动等 | 华药药业集团|华药修医师|修医师浸膏|河南华药药业有限公司 | 昆明子弟食品有限公司 | 昆明子弟食品有限公司| 名嘉宴会【官网】_宁波冷餐_宁波茶歇_宁波酒会_宁波自助餐_宁波盛世名嘉宴会服务有限公司 | 上虞大金湖官网|数控外圆磨床|数控内圆磨床|数控无心磨床 | 上海五相仪器仪表有限公司-鼓风干燥箱-拍击式无菌均质器生产厂家 | 豪顺物流官网-南京物流公司,南京货运公司「全国专线配送」 | 门禁控制器-自动道闸-停车场系统-车位引导系统-车牌识别系统-楼宇对讲-可视门铃-门禁一卡通-河北京鹏电子科技有限公司 | 山东大龙食品有限公司| 深圳理津技术有限公司(REHLOGY)-全球工业品供应商:自动化产品|仪器仪表|设备|备品备件|工具|消耗品|非标设备|建筑工程等一站式综合服务! | 铝合金线棒生产厂家-提供第三代精益管,防静电工作台定制与批发-宁波杰艾逖仓储设备有限公司 | 转轴测试机-按键寿命测试机-连接器插拔力试验机-深圳市丹荣检测 转盘萃取塔,DMF回收塔生产厂家-无锡弘鼎华化工设备有限公司 | 塑木地板-木塑地板厂家「云南昆明楚雄曲靖玉溪塑木地板」云南云冶中信塑木新型材料有限公司 | 佳龙食品集团|高端辣条领导品牌 加药装置-排油烟装置-工业滤水器-连云港灵动 | 浙江微龙科技-微通道工艺结合设备一站式解决方案-致力于连续流技术开发与产业化应用-助力传统医药化工行业转型升级 | 专业的展会信息服务平台 - 展加 专题秀_汇聚网络热门专题_实时报道各类新闻专题资讯 |