Design Plan for Steel Structure Construction Organization

Time:[2023-7-27]  Hits:2200

1、 Project Overview


Construction unit:


Project Name:


Construction unit:


Construction structure:


2、 Construction preparation


2.1 Skill Preparation

 


1. Before the official start of construction, on-site skill briefing work will be carried out in conjunction with the Planning Institute. After reviewing and positioning the guide points, a construction wire point measurement and control network will be established before the start of construction.


2. Conduct on-site verification of skill documents, familiarize yourself with the content of the documents, and based on construction investigations, promptly submit problems in the planning to the planning unit for resolution. Together, make supplementary construction drawings according to construction needs.


3. Based on the construction site investigation, planning documents, and the requirements of the owner, prepare an implementation construction organization plan, organize and guide the construction.


4. Prepare a special construction plan based on the planning documents.


5. Organize the debris, garbage, etc. within the construction site boundary.


6. Arrange a construction team to enter the site and prepare for construction.


7. Preparation of construction personnel, equipment, and materials, as well as skilled management personnel for this project, with equipment in place to meet construction requirements.


8. Do a good job of pre job training and safety education, communicate with all parties together, contact material sources, and acknowledge the transportation routes.


9. Select and implement construction teams with construction skills and experience that can ensure project quality to undertake various construction missions


2.2 Data preparation


Before leaving the factory, the steel components should be inspected by the manufacturer in accordance with the relevant specifications of the manufacturing specifications and the requirements of the planning diagram, and quality reports and actual error values should be filled out. After the steel components are delivered to the structural installation unit, the structural installation unit will conduct re inspection or spot check based on the quality report of the manufacturing plant and the classification of the components according to their properties


2. Based on the construction drawings, calculate the quantity of each main consumption data (such as welding rods, welding wires, etc.) and connecting parts (such as high-strength bolts, ordinary bolts), make order arrangements, and acknowledge the arrival time


3. After the quantity of temporary support, steel structure assembly platform, scaffolding support, safety protection, and environmental protection equipment required for each construction process is recognized, they will be arranged to enter the factory for manufacturing and installation.


2.3 Primary equipment


In steel structure construction, the main machines commonly used include: AC/DC welding machine, C02 gas shielded welding machine, Bench grinder, wire rope, rigging, Dumpy level, etc.


2.4 Operating conditions


1. The joint review of various planning plans has been completed.


Based on the structural deepening drawings, verify the stress conditions of the components during the steel structure installation, scientifically predict their possible deformation, and take corresponding reasonable technical measures to ensure the smooth operation of the steel structure installation


The review of construction plans for each special type of work has been completed.


The reinforced concrete foundation has been completed and passed the acceptance.


Temporary electricity and water supply for construction are laid in place.


6. Mobilization of labor force


7. The construction equipment and devices have passed the debugging and acceptance.


The incoming acceptance inspection of 8 components is qualified.


3、 Steel structure construction process


3.1 Process flow


Preparation of components, equipment, and personnel → Setting out and inspection of lines (axis and elevation) → Acceptance of embedded bolts and treatment of foundation surface → Component centerline and elevation line → Installation of column and beam center structure → Initial and final tightening of high-strength bolts → Welding of column to column nodes → Spot welding of beams and columns and beam joints → Scattered component (corner support) devices → Device pressed square steel → Welding and bolt connection


3.2 Operation process


1. Steel structure lifting sequence


Steel structure lifting generally requires distinguishing the lifting operation area, and steel structure lifting is carried out together in parallel order according to the distinguished area. After the lifting of a certain area is completed, measurement, calibration, and initial tightening of high-strength bolts are carried out. After several areas are installed, the overall measurement, calibration, final tightening of high-strength bolts, and welding are carried out. After welding and retesting, proceed to the lifting of the next section of the steel column. And according to the actual situation on site, carry out the lifting and partial laying operations of this laminated steel plate.


2 bolt embedment


The accuracy of the column orientation depends on the accuracy of the embedded bolt orientation. Control the elevation error of embedded bolts within+ Within 5mm, the error in positioning the axis should be controlled within ± 2mm.


3 Steel column installation process


Section 1 Steel Column Hoisting


(1) Setting of lifting points


The orientation and number of lifting points are recognized based on the specific conditions of the steel column shape, section, length, and crane function. Generally, steel columns have good elasticity and rigidity, and the lifting point adopts a single point positive lifting. The lifting point is set at the top of the column, with the column body vertical and passing through the center of gravity of the column, making it easy to lift, align, and calibrate. When multiple components are assembled into expanded units on the ground for installation, the lifting point should be accounted for and recognized.


(2) Lifting method


1. In multi-storey and high-rise steel Structural engineering, steel columns are generally lifted by a single machine, and for special or overweight components, double machines can also be used.


2. When lifting, it is necessary to keep the steel column straight and try to reverse and straighten it without dragging the root. During the lifting reversal process, attention should be paid to preventing collisions with other components that have already been lifted, and the sling should have a certain effective height. When lifting the first section of the steel column, a protective sleeve should be added to the embedded anchor bolt to avoid damaging the thread of the anchor bolt when the steel column is in place


3. The first section of the steel column is installed on the column base. Before installing the steel column, the climbing ladder and hanging basket should be hung in the predetermined position of the steel column and firmly bound. After lifting in place, the foundation bolts should be temporarily fixed and the straightness should be checked. The two sides of the steel column are equipped with temporary fixing connecting plates. After the upper section of the steel column is aligned with the center line of the lower section of the steel column top, the connecting plates are temporarily fixed with bolts.


It is necessary to wait for the anchor bolts to be fixed before loosening the sling.


(3) Steel column proofreading


Steel column proofreading requires three tasks: adjusting the elevation of the column base, adjusting the axis of the column base, and proofreading the straightness of the column body. Throughout the entire process, measurement is the primary focus.


1. Column base elevation adjustment


After placing the steel column, use the nuts or elevation adjustment blocks under the column bottom plate to control the elevation of the steel column (because some steel columns are too heavy, bolts and nuts cannot bear their weight, so a height adjustment block - steel plate adjustment elevation - needs to be added under the column bottom plate). The accuracy can be controlled within ± 1mm. The gaps reserved under the column bottom plate can be filled with high-strength, slightly expanded, and non-shortened mortar using the grouting method. When adjusting the elevation of the column base plate using nuts, the strength and stiffness of the anchor bolts should be calculated.


2. Adjustment of column bottom axis in the first section


Alignment method: Without loosening the hook of the crane, align the four points on the column base plate with the control axis of the steel column and slowly lower to the planned elevation direction.


3. Correction of Column Body Straightness in the First Section


Use cable wind rope calibration method. Use two 90 ° Theodolite to straighten. During the calibration process, continuously fine tune the nuts under the column base plate until the calibration is completed. Screw on the two nuts above the column base plate. The cable wind rope is loosened without force, and the column body is in a free state. Then recheck it with a Theodolite. If there is a slight error, repeat the above process until there is no error, and tighten the upper nuts. The nut on the anchor bolt is usually a double nut, which can be welded firmly with the screw after the nut is tightened.


Weld the nut and screw firmly.


4. Adjustment of column top elevation and control of other structural steel column elevations


There are two methods for adjusting the top elevation of columns and controlling the elevation of other structural steel columns: one is to install according to the relative elevation, and the other is to install according to the planned elevation. Generally, relative elevation devices are used. After the steel column is lifted in place, the connecting ear plates connecting the upper and lower steel columns should be fixed with large hexagonal high-strength bolts, but they should not be tightened too tightly. After being lifted by a crane, the crowbar can adjust the gap between the columns. Measure the pre calibrated elevation values of the upper and lower column tops, and after meeting the requirements, use steel wedges and spot welding to limit the drop of the steel column. Considering the welding seam and compression deformation, adjust and control the elevation error within 4mm.


5. Section 2 Steel Column Axis Adjustment


To ensure that the upper and lower columns do not show staggered joints, try to ensure that the centerline of the upper and lower columns overlaps as much as possible. The center line error of the steel column should be adjusted within a range of 3mm each time. If the error is significant, it should be adjusted 2-3 times. The positioning axis of each steel column is absolutely not allowed to use the positioning axis of the next steel column. It should be led from the ground control line to high altitude to ensure that each steel column device is correct and prevent excessive accumulation of errors.


6. Section 2 Steel Column Straightness Calibration


The key to proofreading the straightness of steel columns is to pre check the relevant dimensions of the steel columns. The straightness error at the top of the lower steel column is a comprehensive result of the bottom axis, displacement, welding deformation, sunlight effect, straightness correction, and elastic deformation of the upper steel column. Partial errors can be eliminated by reserving straightness error values. When the reserved value is greater than the accumulated error value of the next column, only the accumulated error value is reserved. Otherwise, the reserved value is reserved, and its direction is opposite to the error direction. Empirical value measurement: The general weld seam shortening value between beams and columns is less than 2mm; The shortening value of the column to column weld seam is generally 3.5mm


4. Steel beam installation process


1. Steel beam device


Steel beam devices are generally lifted using tool type lifting lugs or binding methods. Before installation, the center symbol of the steel beam should be introduced to the end of the steel beam to facilitate temporary positioning according to the positioning axis of the column bracket during lifting.


2. Calibration of steel beams


Proofreading includes elevation adjustment, vertical and horizontal axis adjustment, and straightness adjustment. It is necessary to proofread the steel structure beam after the structure forms a stiffness unit.


3. Elevation adjustment


Use a Dumpy level to stand on the beam or a specially erected platform to measure the elevation of both ends of each beam, weighted average all the data, and calculate a standard value. Calculate the elevation adjustment values of each point based on the standard values.


4. Vertical and horizontal axis calibration


Use a Theodolite to lead the axis to the column, determine the distance between the center line of each beam and the axis, pull a long rope (or use a Theodolite) on the center line of the beam top, and use a chain block to adjust the beam ends one by one. After the longitudinal and transverse axes of the steel beam meet the requirements, recheck the span of the structural beam.


5. Straightness proofreading


Straightness correction: Hang a hammer ball from the upper flange of the beam and measure the horizontal spacing between the wire rope and the upper and lower parts of the beam web. Adjust again based on the inclination of the beam (a ≠ a ') to make a=a.


6. Special rust removal equipment is used for rust removal, and shot rust removal can improve the fatigue strength and corrosion resistance of steel. The hardness of the steel surface is also improved to varying degrees, which is conducive to the adhesion of the paint film without the need for additional coating thickness. The abrasive used for rust removal must comply with quality standards and process requirements, and the relative humidity of the construction environment should not exceed 85%.


The surface of the steel after rust removal must be cleaned with tools such as a brush before proceeding to the next process. If the surface of the steel after rust removal is qualified and has returned to rust before applying primer, it needs to be re rust removed.


7. Paint


After passing the inspection of rust removal on the steel, the first layer of primer is applied on the surface. Generally, after the rust removal is completed, it is stored in the factory and can be coated within 24 hours. If stored outside the factory, the primer should be painted on duty. The paint should be applied in accordance with the planning requirements. After the first coat of primer is dry, the intermediate and top coats should be applied to ensure that the thickness of the coating meets the planning requirements. The paint should be evenly applied without sagging during the brushing process.


4、 Key points of quality acceptance


1 base and support surface


The positioning axis of the building, the positioning axis and elevation of the columns on the foundation, the specifications and orientation of the anchor bolts (anchor bolts), and the fastening of the anchor bolts (anchor bolts) should meet the planning requirements.


The fastening should meet the planning requirements.


2 Devices and proofreading


1. Steel components should comply with planning requirements and regulations. The deformation and coating detachment of steel components caused by transportation, stacking, and lifting should be corrected and repaired.


2. For nodes that require top tightening, the touch surface should not be less than 70% tight, and the maximum edge gap should not be greater than 0.8mm.


3. The surface of the steel structure should be clean, and the primary surface of the structure should be free of scars, mud, and other dirt.


When the steel component is installed on a concrete column, the error between its support center and the positioning axis should not exceed 10mm


5. Steel platforms, ladders, and railing devices in multi-layer and high-rise steel structures should comply with the current national standards of "Fixed Steel Vertical Ladders" (GB4053.1), "Fixed Steel Inclined Ladders" (GB4053.2), "Fixed Protective Rails" (GB4053.3), and "Fixed Steel Platforms" (GB4053.4).


5、 Product protection


1. High strength bolts, studs, welding rods, welding wires, etc. are stacked on shelves in the warehouse, with a maximum of four layers of stacking.


2. The stacking of steel components requires the site to be flat, sturdy, clean, dry, neatly stacked, with sleepers underneath, and to be resistant to deformation and rust.


3. It is not allowed to weld or cut completed components arbitrarily, or stack objects in the air. Welds and node plates that have been completed and inspected as qualified should be immediately sorted out and sealed as required.


When lifting the steel structure into position, it should be slowly lowered and should not collide with the already installed steel structure.


5. Carefully manage the manufactured steel columns, etc., to prevent the unreasonable placement of cushion base points from bending and deformation.


6、 Environmental and occupational health and safety control measures


1 Environmental control measures


1. When welding, steel pipes are used to set up protective railings, and colored cloth is used to surround the railings to prevent the exposure of arc light and welding smoke and dust.


2. Waste generated during and after construction should be recycled and treated.


2 Occupational Health and Safety Measures


1. It is necessary to include the safety skills and measures for operations, as well as the required equipment, in the construction organization plan of the project.


2. Corresponding responsibility systems should be established for unit project construction. Before construction, safety skill education and disclosure should be carried out step by step, and all safety skill measures should be implemented. Construction should not be carried out without implementation.


3. It is necessary to inspect the facilities and equipment used in high-altitude operations before construction, and only after acknowledging their integrity can they be put into use.


4. It is necessary for climbing and suspended operators to hold a certificate and undergo regular professional knowledge assessment and physical examination. It is necessary to wear a safety helmet, fasten a seat belt, wear anti slip shoes, and carry a tool bag when on duty.


5. The high-altitude operation area should have clear signs and be guarded by dedicated personnel. Personnel unrelated to lifting are prohibited from entering. During crane operation, no one is allowed to stand within the rotating radius of the boom.


6. When transporting lifting components, it is prohibited to stand on the components to command and place materials and tools.


7. It is necessary to bind the components firmly, and the lifting point should pass through the center of gravity of the components. When lifting, it should be stable to prevent vibration or oscillation.


8. When working at heights, safety nets need to be installed to prevent accidents caused by personnel, materials, and tools falling or flying out.


9. All objects that may fall from the construction site should be removed or fixed first. The materials used in high-altitude operations should be stacked steadily and not obstruct passage and loading and unloading.


10. When conducting high-altitude operations on rainy and snowy days, it is necessary to take reliable anti slip, cold and freezing measures. Water, ice, frost, and snow should be promptly removed. Before construction, go to the local meteorological department to understand the situation and take measures to prevent typhoons, rain, freezing, cold, and high temperatures. Before and after the snowstorm and typhoon rainstorm, the safety facilities for high-altitude operation shall be checked one by one, and the problems found shall be improved immediately.


11. During the process of structural installation, it is not allowed to operate in the same straight direction when each type of work is engaged in vertical crossing operations. The orientation of the lower level operation needs to be outside the radius of the possible falling range recognized according to the height of the upper level; When the above conditions are not met, a safety protection layer should be set up.


7、 Issues to pay attention to


The quality of pre assembled steel components should meet the planning requirements and quality specifications. The length dimensions of components such as columns, beams, and supports should include deformation values such as welding shortening allowance.


The detection of device errors should be carried out after the structure forms a spatial stiffness unit and is connected and fixed.


When installing 3 devices, it is necessary to control the construction load of the platform flooring, and the construction load must not exceed the bearing capacity of beams, deck slabs, platform flooring, etc.


Only after the installation, welding, and bolting of all components of each column are completed and accepted can the positioning axis of the previous column be measured from the ground.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产日韩欧美一区二区宅男 | 国产精品久久久久久影视 | 久久久久久国产精品免费免费男同 | 亚洲天堂第一页 | 天天躁日日躁狠狠的躁天龙影院 | 成人做爰免费网站 | 日韩在线精品成人av在线 | 狠狠色婷婷狠狠狠亚洲综合 | 国产大片aaa | 综合久久综合久久 | 任我爽精品视频在线观看 | 国产亚洲精品久久久久四川人 | 日韩亚洲在线观看 | 草草久久久无码国产专区 | 美女胸18大禁视频网站 | 国产精品青草综合久久久久99 | 日本精品视频一区二区三区四区 | 日韩有码av | 国产人妖乱国产精品人妖 | 日韩18p| 麻豆专区| 中文字幕网伦射乱中文 | 九色porny丨天天更新 | 免费黄色毛片视频 | 99久久中文字幕三级久久日本 | 日韩一区二区三区免费 | 国产精品综合一区二区三区 | 中文字幕涩涩久久乱小说 | 国产91av在线 | www777色 | 亚洲人成网站精品片在线观看 | 国产免费a视频 | 亚洲精品ww久久久久久p站 | 狠狠操综合网 | 成人免费毛片入口 | 亚洲综合三区 | 中文字幕免费在线视频 | 伊人五月天婷婷 | 中文字幕第56页 | 亚洲自拍99| 用舌头去添高潮无码视频 | 麻豆免费观看视频 | 久久九九兔免费精品6 | 日本免费在线播放 | 中国免费黄色片 | 国产午夜片无码区在线播放 | 亚洲青涩在线 | 精品人妻无码一区二区三区 | 日韩欧美国产网站 | www久久爱白液流出h | 美国做爰xxxⅹ性视频 | 女人两腿打开让男人添野外视频 | 夜噜噜| 成人午夜在线观看 | 青青伊人国产 | 伊人久久精品一区二区三区 | 亚洲精品一区二区三区不 | 日本十八少妇毛片视频 | 噜噜噜视频在线观看 | 久久七| 成人亚洲性情网站www在线观看 | 婷婷久久一区二区三区 | 国产亚洲真人做受在线观看 | 亚洲三级免费观看 | 香蕉视频黄版 | 黄a免费网络| 亚洲一区二区三区免费看 | 午夜av亚洲翘臀国产精网 | 国产精品无码dvd在线观看 | 国产精品丝袜美腿一区二区三区 | 成人免费视屏 | 欧洲一区在线 | 天堂а√8在线最新版在线 大地资源中文第三页 | 一级特黄视频 | 91精品国产综合久久香蕉麻豆 | 夜夜高潮夜夜爽精品欧美做爰 | 亚洲影院在线播放 | www五月天com| 欧美日韩成人在线视频 | 成品片a免人看免费 | 人人干干人人 | 撸撸综合色av| av在线入口 | 日韩在线 | 丝袜国产在线 | 丰满少妇裸体淫交 | 亚洲成av人片在www鸭子 | 日本亚洲欧美 | 欧美~大家屁股网站 | 成人影片在线 | 亚洲午夜久久久久久久国产 | 国产亚洲精品久久777777 | 精品av无码国产一区二区 | 久久久久国产精品免费免费搜索 | 成人性视频网站 | 91网站永久免费看 | 人妻奶水人妻系列 | 天天躁狠狠躁狠狠躁夜夜躁68 | 天天干天天干天天干 | 日本极品在线 | 国产区二区 | 人妻熟人中文字幕一区二区 | 日本老妇做爰xxx视频 | 麻豆免费观看视频 | 久久精品视频1 | 窝窝午夜理论片影院 | 在线91av| 伊人色综合久久天天 | 98精品视频 | 嘴交的视频丨vk口舌视频 | 午夜福利理论片高清在线观看 | 日韩欧美午夜 | 免费观看又色又爽又黄6699 | 欧美视频三区 | 一区二区三区精品 | 天天综合中文字幕 | 妺妺窝人体色www在线观看 | 亚洲国产专区 | 色婷婷亚洲六月婷婷中文字幕 | 成人精品一区二区三区中文字幕 | 国产美女av| 我要看18毛片 | 久久理伦 | 国产精品揄拍500视频 | 国产精品成人一区二区不卡 | 在线不卡欧美 | 18禁美女裸体无遮挡网站 | 91国内| 美女张开腿黄网站免费下载 | 午夜黄色影院 | 欧美色图首页 | 日本猛少妇色xxxxx | 公妇乱淫真实生活 | 色综合99久久久无码国产精品 | 亚洲欧美日本久久综合网站 | 欧美三级少妇高潮 | 精品欧美一区二区久久久 | 无码欧美毛片一区二区三 | 久久新视频 | 免费欧洲美女牲交视频 | 污视频在线观看免费网站 | 久久久久久成人 | 国产免费踩踏调教视频 | 麻豆精品导航 | 欧美中文视频 | 国产精品视频专区 | 国产精品一区网站 | 久久综合久久自在自线精品自 | 青青青国产免费线在 | 天堂中文av| 国产精品自在在线午夜免费 | 免费亚洲精品 | 国产精品久久久久久久泡妞 | 婷婷综合亚洲 | 天天操妹子| 麻豆影视在线播放 | 日韩欧美一区三区 | 日本无遮挡吸乳视频 | 久久视频在线播放 | 男女超爽视频免费播放 | 女人被狂躁的高潮免费视频 | 国产婷婷色一区二区三区 | 亚洲区小说区 | 欧美在线看片a免费观看 | 国产欧美日韩另类在线专区 | 亚洲爆乳无码专区www | 伊人色在线 | 一区二区三区国产 | 国产精品丝袜黑色高跟鞋v18 | 97在线观看免费观看高清 | 久久久97| 国产亚洲精品第一综合麻豆 | 鲁鲁在线 | 久久国产成人午夜av影院 | 在线看免费视频 | 久久99影院| 亚洲国产av无码综合原创国产 | 日韩免费一级 | 日一日干一干 | 欧美日韩国产激情 | 无码国产一区二区三区四区 | 中文字幕日韩欧美一区二区 | 真人做爰免费毛片视频 | 亚洲精品乱码久久久久久久久久 | 男女作爱网站 | 韩国一区二区视频 | 97久久精品国产一区二区片 | 亚洲欧美国产精品18p | 成人网站免费观看入口 | 慈禧一级淫片免费放特级 | 国产欧美精品aaaaa久久 | 国产女人18毛片水18精 | 精品久久人人妻人人做精品 | av成人免费在线 | 成人免费av影院 | 国产国拍精品亚洲 | 日本女人hd | 精品久久视频 | 伊人五月婷婷 | 噜噜噜天天躁狠狠躁夜夜精品 | 午夜精品久久久久久久99热浪潮 | 大rb狠狠地给你这y荡的视频 | 国产精品亚洲成在人线 | 麻豆成人久久精品二区三区免费 | 一本久道久久综合婷婷五月 | 快色网站| 欧洲成人午夜精品无码区久久 | 在线麻豆视频 | 久久久综合久久 | 久久天天躁夜夜躁狠狠躁2022 | 日本123区 | 日韩加勒比一本无码精品 | 中文在线a√在线 | 男女一级黄色 | 97久久天天综合色天天综合色hd | 久久国产精品无码一区二区三区 | 亚洲在线一区二区 | 欧美在线中文 | 亚洲日韩乱码久久久久久 | 免费看男女做爰爽爽视频 | 国产另类视频 | 成人免费视频网址 | 韩国色综合 | 明星大尺度激情做爰视频 | 欧美日在线观看 | 免费三片在线观看网站v888 | 午夜亚洲精品 | 精品一区二区三区免费 | 夜色成人网 | av在线www | 人妻少妇久久久久久97人妻 | 国产又大又粗又爽 | 在线观看毛片网站 | 亚洲区免费中文字幕影片|高清在线观看 | 国产美女视频国产视视频 | 国产性生交xxxxx免费 | 久久www免费人成看片美女图 | 91精品国产色综合久久 | 国产69精品久久久久久久久久 | 国产人与禽zoz0性伦免费视频 | 欧美视频在线观看免费 | 欧美丝袜脚交 | 足疗店女技师按摩毛片 | 久久一二区 | 欲色网站 | 亚洲一区二区三区视频 | 无码任你躁久久久久久 | 久久久久一 | 狠狠躁夜夜躁人人爽蜜桃 | 99精品无人区乱码1区2区3区 | 性国产xxxx乳高跟 | 国产女主播喷出白浆视频 | 亚洲第一成人av | 欧美成人做爰猛烈床戏 | 久久综合久久久久 | 爽好多水快深点欧美视频 | 亚洲v | 无人区码一码二码w358cc | 午夜性视频国产牛牛视频 | 亚洲男同视频 | 中文字幕一区二区三区日韩精品 | 日韩精品视频免费播放 | 一区二区三区回区在观看免费视频 | 成人天堂视频在线观看软件 | 亚洲无人区小视频 | 亚洲国产精品毛片 | 一起草视频在线播放 | 尹人综合网 | 99嫩草| 久色91 | 色欲精品国产一区二区三区av | 少妇又紧又色又硬又爽 | 国产麻豆一区二区三区在线观看 | 影音先锋在线看片资源 | 最色网站 | 欧美日韩在线播放 | 天天做天天爱天天综合网2021 | 成人免费xxxxx在线视频 | 91看片免费看 | 国产偷窥女洗浴在线观看 | 91中文字幕在线视频 | 在线国产视频一区 | 久久精品6 | 国产粉嫩尤物极品99综合精品 | 黄色视网站| 亚洲韩国精品无码一区二区三区 | 亚洲伊人色欲综合网 | 国产裸体丰满白嫩大尺度尤物可乐 | 久久99精品久久久久久青青日本 | 国产成人综合自拍 | 精品毛片一区二区 | 亚洲精品成a人在线观看 | 亚洲精品av中文字幕在线在线 | 国产精品爽爽v在线观看无码 | 黄色片视频免费 | 亚洲 自拍 另类小说综合图区 | 日本三级视频在线观看 | 97成人超碰 | 成人精品免费视频在线观看 | 久久两性视频 | 国产日韩欧美一区二区三区乱码 | 黑人一区二区三区四区五区 | 婷婷无套内射影院 | 男人天堂2014 | 亚洲国产欧美一区二区潘金莲 | 国产99视频精品免视看芒果 | 又黄又爽又色成人免费体验 | 意大利性荡欲xxxxxx | 天堂资源在线www中文最新偷拍 | 精品欧美一区二区三区免费观看 | 夜夜爽免费888视频 成 人 黄 色 网 页 | 9l蝌蚪porny中文自拍 | 国产黄色在线观看 | 日韩一区二区三区免费 | 色综合99久久久无码国产精品 | 日本激情吻胸吃奶呻吟视频 | 日本少妇aa特黄毛片亚洲 | 中文字幕乱码日本亚洲一区二区 | 激情五月网站 | xxxx性xx另类ⅹ亚洲hd | 国产视频精选 | 久久在线免费观看 | 国产一级特黄a高潮片 | 丁香六月色婷婷 | 国产经典av | 少妇高潮喷水久久久久久久久久 | 色一情一乱一乱一区免费网站 | 亚洲一区二区三区四区五区六区 | 一区精品在线 | 国产又黄又粗又猛又爽视频 | 精品人妻中文无码av在线 | 日本被黑人强伦姧人妻完整版 | 国产精华av午夜在线观看 | 中文字幕一区二区三区有限公司 | 最新国产中文字幕 | 天堂а√在线中文在线 | 少妇人妻偷人精品无码视频新浪 | 国产精品av久久久久久网址 | 啪啪资源 | 韩日精品在线 | 久久天天综合 | 日韩女优在线视频 | 成人免费在线观看 | 免费ā片在线观看 | 亚洲精品久久久久av无码 | 亚洲成人高清在线观看 | 亚洲一区精品人人爽人人躁 | 日本少妇xxxxx | 日韩精品卡通动漫网站 | 国产69精品久久久久毛片 | 男女裸交免费无遮挡全过程 | 色吊丝永久性观看网站免费 | 激情另类视频 | 久久不卡影院 | 波多野结衣不打码视频 | 香蕉网在线视频 | 欧美中文字幕 | 国产一区免费在线观看 | 亚洲精品久久久乳夜夜欧美 | 国产一区二区三区小说 | av黄色小说| 黄污视频在线免费观看 | 欧美精品久久久久久久自慰 | 欧美日韩综合在线 | 岛国在线免费视频 | 搐搐国产丨区2区精品av | 东北老女人av | 伊人久久婷婷 | 国产白丝精品91爽爽久 | av免费在线观看免费 | 一区二区三区免费观看视频 | 国产特级黄色录像 | 成人精品一区日本无码网站 | 人人爽人人爽人人片 | 91精品国产综合久久福利软件 | 18禁白丝喷水视频www视频 | 88xx永久免费看大片 | 一本色综合亚洲精品88 | 国产剧情精彩演绎 | 国精产品999永久天美 | 激情五月色综合国产精品 | 精品综合久久久久 | 成人人人人人欧美片做爰 | 美女毛片一区二区三区四区 | 亚洲日韩中文字幕天堂不卡 | 99久久人人爽亚洲精品美女 | 欧美大片va欧美在线播放 | h视频在线免费看 | www国产亚洲精品久久久日本 | 精品无码久久久久久久久 | 久久三级视频 | 免费的av网站 | 999久久久无码国产精品 | 亚洲一区二区免费 | 精品视频一区二区三区四区戚薇 | 国内精品自产拍在线观看 | 黄色片在线观看免费 | 大尺度做爰呻吟舌吻情头 | 91丨九色丨国产 | 国产不卡毛片 | 女教师淫辱の教室蜜av臀 | 三级毛片网站 | 国产精品农村妇女bbw | 国产又滑又嫩又白 | 女装男の子av在线播放 | 国产精品福利久久 | 日本人做爰全过程 | 神马午夜dy888 | 波多野结衣美乳人妻hd电影欧美 | 亚洲最新在线视频 | 日韩精品久久无码中文字幕 | 无码夜色一区二区三区 | 午夜精品一区二区三区在线视频 | 日韩精品一区二区三区亚洲综合 | 2017天天干天天射 | 一级片网址 | 天天碰天天 | 女邻居的大乳中文字幕 | 国产免费一区二区三区免费视频 | 午夜狠狠干 | 九色porny丨国产首页注册 | 大乳美女a级三级三级 | 思思99热久久精品在线6 | 男女草比视频 | 66m66成人摸人视频 | 国产一二三四ts人妖 | 18禁裸体女免费观看 | 按摩69xxx | 精品人妻无码区在线视频 | 99精品偷拍在线中文字幕 | 天天色综合天天 | 最新国产在线视频 | 成人片在线免费看 | 欧美孕妇xxxx做受欧美88 | 欧美粗大猛烈老熟妇 | 欧美激情在线一区二区 | 天堂在线资源网 | hs视频在线观看 | 国产日韩一区二区 | 国产91在线免费观看 | 夜夜高潮夜夜爽国产伦精品 | 寂寞少妇让水电工爽了一小说 | 久久艹网站 | 91高清免费 | 天天视频黄 | 人妻熟妇乱又伦精品视频 | 国产肥臀一区二区福利视频 | 少妇出轨精品中出一区二区 | av无码免费永久在线观看 | 亚洲影视网 | 丁香婷婷亚洲综合 | 国产精品精品视频 | 美国一级大黄一片免费中文 | 各种含道具高h调教1v1男男 | 日本不卡中文字幕 | 成人免费毛片东京热 | 噜噜久久噜噜久久鬼88 | 69视频在线播放 | youjizz麻豆| 大尺度做爰呻吟舌吻情头 | 色综合久久蜜芽国产精品 | 国产视频69| 欧美性大战久久久久久久蜜桃 | 男女日批在线观看 | av无码精品一区二区三区宅噜噜 | 调教大乳女仆喷奶水 | 我撕开了少妇的蕾丝内裤视频 | 国产a三级久久精品 | 久久久欧美精品sm网站 | 日本美女黄色一级片 | jizz免费| 免费看黄色aaaaaa 片 | 中文字幕十一区 | 国产精品高清在线 | 免费看欧美中韩毛片影院 | 激情综合色综合久久综合 | 伊人久综合 | 天天操天天摸天天干 | 中文在线免费观看 | 午夜视频观看 | 欧美xx孕妇 | 日本无遮挡吸乳视频 | 狠狠色噜噜狠狠狠狠777米奇 | 特黄一区二区 | 中文字幕一区二区三区不卡 | 日韩中文视频 | 免费特级毛片 | 嫩草影院永久入口 | 隔壁老王国产在线精品 | 久久丫精品忘忧草西安产品 | 制服丝袜另类专区制服 | 丰满人妻翻云覆雨呻吟视频 | 91精品国产色综合久久不卡98最新章节 | 黄色片视频免费观看 | 人妖ts福利视频一二三区 | 中文字幕免费高清在线观看 | 男人一边吃奶一边做爰网站 | 亚洲欧美在线精品 | 国产精品国产三级国产av主播 | 涩涩久久| 真人一毛片 | 噜噜噜视频 | 午夜天堂av | 国产av福利久久精品can | 午夜老司机福利 | 欧美性猛交bbbbb精品 | 九色porny丨首页在线 | 国产人人爱 | 国产伦精品一区二区三区视频我 | 国产毛片毛片毛片 | 中文字幕久久久久人妻 | 国产成人精品无码免费看夜聊软件 | 国内精品久久久久影院男同志 | 在线天堂新版资源www在线 | 999久久久国产精品 999久久久精品 | 免费观看成人摸66m66 | 国产成人午夜高潮毛片男男爱 | 黑人与日本少妇 | 男人天堂久久久 | 成熟女人毛片www免费版在线 | 2018天天拍拍天天爽视频 | 日本500人裸体仓房视频 | 狠狠色96视频 | 哺乳一区二区久久久免费 | 欧美福利网站 | 一级美女大片 | 91pony九色丨交换 | www.在线国产 | www久久久久久久久久 | 6080av| 国产色频| 欧美一性一乱一交一视频 | 欧美日韩一区二区三区不卡 | 中日av乱码一区二区三区乱码 | 天天插天天干天天操 | 日本无遮羞打屁股网站视频 | 精品手机在线 | 亚洲色图少妇 | 日本一二三不卡 | 浓毛老太交欧美老妇热爱乱 | 男人网站在线观看 | 精品欧美一区二区三区 | 91亚洲精华国产精华液 | 国产精品夜夜春夜夜爽久久小 | 国产在线播放91 | 国产精品免费久久久久久久久久中文 | 午夜日韩在线 | 久久久久久毛片免费播放 | 日本亚洲高清 | 一边添奶一边添p好爽视频 欧美 变态 另类 人妖 | 成 人 黄 色 视频播放165 | 国产51页| 久久久综合 | 日韩第一页在线 | 极品粉嫩国产 | 日日干夜夜艹 | 国产乱对白精彩 | 国产午夜精品一区二区理论影院 | 日韩福利视频一区 | 亚洲国产精品入口 | 国产中文一区二区 | 艳妇av | 在线中文字幕亚洲 | 亚洲人成小说 | 亚洲国产精品尤物yw在线观看 | 亚洲免费三级 | 国产精品亚洲二区在线观看 | 91亚洲乱码卡一卡二卡新区豆 | sb少妇高潮二区久久久久 | 国产粉嫩在线 | 18禁黄久久久aaa片广濑美月 | 人成在线免费视频 | 亚洲国产成人一区二区在线 | 国产日产欧产精品精乱了派 | 国产成人精品123区免费视频 | 亚洲欧美日韩激情 | 欧美黄色网络 | 日本人dh亚洲人ⅹxx | 亚洲人成网站999久久久综合 | 桃色网站在线观看 | 黄色激情视频网站 | 一级国产国产一级 | 国产三区视频 | 国产污污 | 一级a性色生活片久久毛片 一级a性色生活片久久毛片明星 | 国产精品免费福利 | 日日好av | 九七伦理97伦理手机 | 蜜桃网站入口在线进入 | 国产精品a成v人在线播放 | 99久久99久久久精品棕色圆 | 天堂久久精品 | 噼里啪啦免费观看 | 国产免费一区二区三区香蕉精 | 香蕉网在线视频 | 涩里番在线观看 | 久久男人av资源网站 | 国产精久久久久 | 亚洲综合在线一区二区三区 | 婷婷丁香六月激情综合啪 | 超碰区 | 韩国三级中文字幕hd久久精品 | 蜜桃精品在线 | 免费在线性爱视频 | 国产在线拍偷自揄拍精品 | 中文屏幕乱码av | 亚洲精品一区二区三区h | 黑人操亚洲人 | 亚洲狼人av | 欧美一a一片一级一片 | xvideos成人免费视频 | 国产精品久久人妻无码网站一区 | 精品国产青草久久久久福利 | 波多野吉衣久久 | 成人免费在线视频网站 |