www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Three Questions and Three Answers to Prefabricated Steel Structures
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.huihuitaotao.cn

Three Questions and Three Answers to Prefabricated Steel Structures

Time:[2023-8-9]  Hits:1474

1、 What are the structural systems for the construction of prefabricated steel structures? How high can we do it? How much steel is used?


The construction of prefabricated steel structures has a rich range of structural systems to meet different construction requirements, including structures, structural supports, structural shear walls, etc.


In terms of materials, various forms such as pure steel structure systems and steel tube concrete composite structure systems can be selected. The height of prefabricated steel structure construction can reach all the construction heights available in the current construction field.


Almost all super high-rise buildings use steel structural systems (or partially use steel structural components). Generally speaking, according to the increase in construction height, a system with strong lateral force resistance needs to be selected.


For residential buildings, multi story structures below 6 floors often use pure structural structures, with a steel consumption of approximately 70-80kg/square meter;


High rise structures with 6-18 floors often use structural support structures, with a steel consumption of approximately 80-90kg/square meter;


In addition to structural support, structural shear walls and other systems can also be used for high-rise buildings with 18-30 floors, with a steel consumption of approximately 90-110kg/square meter.


2、 What are the wall panels used in the construction of prefabricated steel structures? How to solve the problem of deformation coordination? Are there any cracks in the wall panel? Is there a problem with poor sound insulation?


The construction of prefabricated steel structures is mainly based on steel structures, which can match various wall panel components according to construction needs, such as lightweight strip concrete PC panels and glass aluminum panel walls.


At present, steel structures often use lightweight strip ALC boards as filling walls for external or internal walls. The combination of this type of plate and steel structure is widely used in construction in Japan. The application in domestic engineering is also increasing, such as the China Zun project. This type of wall panel material, like autoclaved aerated blocks, belongs to the same category as concrete products.


The internal reinforcement of the wall panel has high strength; Lightweight material, relatively low density, easy to transport and install; The internal porous structure has good insulation and sound insulation effect.


According to the standard atlas, the ALC strip has various node connection methods such as hook head bolts, sliding S-plates, and built-in anchors, which can meet the structural deformation requirements with interlayer displacement angles ranging from 1/50 to 1/200.


According to research, the problem of cracks in wall panels is mainly caused by the drying shrinkage of materials. Cracking in the coating layer of wall decoration can be avoided by controlling the moisture content of the wall panel and adding anti crack tape during the decoration process.


The sound insulation effect of ALC wall panels is very good. It is recommended to use 200mm thick wall panels for household walls, with a sound insulation of up to 47-48dB. 100mm thick wall panels can be used for room walls, with a sound insulation of up to 42-43dB.


The insulation and exterior decoration of prefabricated steel structures can use traditional thin plastering systems, dry hanging curtain wall systems, or insulation and decoration integrated panel systems.


The waterproofing of thin plastering and curtain wall systems is consistent with traditional practices. The waterproofing of insulation and decoration integrated panels is achieved by combining various measures such as sealing materials and waterproof strip construction to prevent external wall leakage.


3、 What are the floor slabs used for the construction of prefabricated steel structures?


The construction of prefabricated steel structures should use profiled steel plates, steel bar trusses, or composite floors with detachable steel bar trusses.


In the case of public building rooms with suspended ceilings, it is recommended to choose a composite floor slab consisting of profiled steel plates and steel truss floor support plates. The galvanized surface of the floor support plate can be covered by the indoor ceiling.


In the absence of suspended ceilings in residential construction rooms, it is recommended to use detachable steel truss floor support composite slabs. After pouring concrete, the bottom formwork is removed, and the finished surface is very good, allowing for direct putty and coating construction.


We do not advocate the use of precast concrete composite panels, which are heavy in weight and seriously occupy on-site lifting equipment. The device efficiency is low, and the lower part requires a large amount of support, accompanied by additional processes such as installation and dismantling of support and safety hazards.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 威海电子电镀,山东五金电镀,威海镀镍,山东镀铜镍铬-威海鑫镱金属制品厂 | 潍坊志扬机械有限公司_扫地机-抓蔗机-履带运输机-自上料搅拌车 | 橡胶管_高压橡胶管_高压胶管_铠装高压胶管-河北远大新特橡塑有限公司 | 扫路车_洗扫车_清扫车_道路清扫车_天锦洗扫车-程力专用汽车股份有限公司 | 上海祝融起重机械有限公司-德国耶鲁手拉葫芦|耶鲁手拉葫芦|耶鲁手扳葫芦|耶鲁电动葫芦经销代理 | 液力耦合器,摩擦型液力耦合器生产厂家-河南省华升矿机有限公司 | 主题公园设计|主题公园规划|水上乐园设计|龙翔设计|龙翔景观|龙翔文旅|深圳市龙翔设计景观工程有限公司 | 专业制造泥浆泵阀箱、锻造零件、曲轴、台阶轴等各种机械部件 - 四川中宇重工科技有限公司 | 移印机厂家_丝印机器设备_全自动丝网印刷机-东莞展迅机械科技 | 原子灰厂家—长兴宝迪环保科技有限公司【官网】 | 上进电缆(嘉兴)股份有限公司官网 - 光伏电缆|防火电缆|电力电缆|铝合金电缆专业生产厂家 | 芯片_IC_半导体品牌一级代理商-深圳市合通泰电子有限公司 | 钕铁硼-强力磁铁-永磁铁「聚盛磁铁」10年定制加工生产厂家 | 化妆粉扑厂家【秀兰】一线品牌资格供应商_海绵粉扑批发_气垫粉扑价格_广州秀兰生物科技有限公司 化工招聘网 化工人才网|化工英才网-化工企业招聘首选网站 | 型煤锅炉进煤机|型煤链条炉排 |重型板链除渣机 |丹东刮板输送机|丹东脱硫除尘器-铧洋机械 | 耐油橡胶接头,耐酸碱橡胶接头,耐高温橡胶接头|淞江集团 | 江苏吉宏特专用汽车制造有限公司_联合吸污车-下水道管道清洗疏通车-综合养护吸排车 | 喷涂机器人|自动喷涂生产线|自动喷涂设备|自动化生产线-深圳市荣德机器人科技有限公司 | 限矩型液力偶合器_调速型液力偶合器_摩擦型耦合器生产厂家-河南省华升矿机有限公司 | 双效-多效-三效-废水-污水蒸发器_离心喷雾-污泥干燥机_蒸发浓缩器【天辰环保 】 | 张家港起重搬运吊装,工厂设备搬运服务-张家港易源起重搬运有限公司 | 学校直饮水机-反渗透纯水设备-家用净水器厂家-广州颖圣能源设备 学校洗碗机-郑州洗碗机厂家-商用洗碗机-郑州旭申环保科技有限公司 | 医疗器械,理化实验室设备,微生物,培养基,一站式采购 - 杭州润泽仪器商城 | 景德镇古窑民俗博览区-国家AAAAA级旅游景区_全国旅游标准化示范景区_国家文化产业示范基地_国家级非物质文化遗产生产性保护示范基地--官方网站 | 郑州润滑油展-第16届中国润滑油、脂及汽车养护展览会-2025年5月27-28日-郑州国际会展中心 | 山东鲁控电力设备有限公司_高低压电器设备_变压器 | 山东华德耐特工业设备有限公司-仓储货架-钢托盘-物流车-周转箱-工位器具 | 消防改造安装,消防维修检测,消防工程安装,气体灭火施工安装,火灾烟感探测器清洗 | 暖气片-工程暖气片厂家【专注工程暖气片30年】-北铸暖气片 | 欧式箱变_美式箱变_预制舱壳体-合肥龙马电气设备有限公司 | 浙江民数科技有限公司| 扬州华工电气有限公司|环氧树脂管|金刚石绝缘板|U型绝缘槽|电解槽绝缘材料 | 园林绿化平台|园林绿化网|苗木网|苗圃网||苗木报价网|园林招标网|园林苗木网|园林工程网|景观设计网|园林机械网|绿化苗木网| | 转轴测试机-按键寿命测试机-连接器插拔力试验机-深圳市丹荣检测 转盘萃取塔,DMF回收塔生产厂家-无锡弘鼎华化工设备有限公司 | 型煤锅炉进煤机|型煤链条炉排 |重型板链除渣机 |丹东刮板输送机|丹东脱硫除尘器-铧洋机械 | 郑州空气能热水器,郑州空气能热水器经销商,郑州空气能热水器维修,郑州空气能热水器安装 | 泥浆振动筛|卧式泥浆搅拌器|泥浆离心机|泥浆处理固控设备_沧州宏宇石油机械有限公司 | 深圳LED显示屏厂家_室内户外LED显示屏_彩屏电子有限公司 | 蓝禹太阳能蓄电池 风能储能胶体铅酸电池-扬州东泰电源有限公司 | 中科先农农业(河北)智能设备有限责任公司 | 上海熙隆光电科技有限公司-半导体激光器,一字线激光器,光纤耦合激光器,拉曼激光器 |