www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Capacity requirements for steel structural components
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.huihuitaotao.cn

Capacity requirements for steel structural components

Time:[2023-9-7]  Hits:1869

1. Requirements for filling in the capacity of each component of the steel structure:


(1) Component: piece;


(2) Basic and connecting nodes: pieces;


(3) Roof truss and truss: truss;


(4) Steel beams and columns: pieces;


(5) Steel platform: pieces;


(6) Railing: m;


(7) Steel ladder: running (explaining the steps of stairs);


(8) Purlins: pieces; Crane beam: truss;

 


2. Minimum sampling in inspection batch:


(1) 10% capacity and ≥ 3: basic inspection, etc

 


3. Full inspection in the inspection batch:


(1) Main structure size


4. Original record: Inspect the specific parts of the components and view the results


5. Inspection basis: "Code for Construction Quality Inspection of Steel Structures" GB50205-2020


(1) 10.2.1 The positioning axis, foundation axis and elevation of the building, and the specifications and fastening of anchor bolts should meet the design requirements. Inspection quantity: 10% of the columns should be randomly checked based on their base number, and no less than 3 should be included.


(2) 10.3.4 The allowable errors for the overall verticality and overall plane bending of the main structure of a single-layer steel structure comply with the rules in Table 10.3.4. View quantity: View all the main facades. For each viewed facade, in addition to two columns of corner columns, at least one column should be selected as the interval column.

 


6. What inspection batches are required for on-site welded steel structures: (The conventional practice should be combined with the design drawings)


(1) Quality inspection records of steel structure (steel structure welding) inspection batches;


(2) Quality inspection records of steel structure (common fastener connection) inspection batches;


(3) Quality inspection records of steel structure (high-strength bolt connection) inspection batches;


(3) Quality inspection records of steel structure (parts and component processing) inspection batches;


(4) Quality inspection records of steel structure (component assembly) inspection batches;


(5) Quality inspection records of steel structure (pre assembly) inspection batches;


(6) Quality inspection records of steel structure (single layer structure) inspection batch; (If it is a multi-layer structure, use multi-layer and high-rise structures for installation.)


(7) Quality inspection records of steel structures (pressed metal plates) inspection batches;


(8) Quality inspection records of inspection batches for steel structures (anti-corrosion coating);


(9) Quality inspection records of steel structure (fire resistant coating) inspection batches;

 


7. The on-site installation engineering of factory welding requires documentation; (The conventional practice should be combined with the design drawings)


(1) Quality inspection records of steel structure (single layer structure) inspection batch; (If it is a multi-layer structure, use multi-layer and high-rise structures for installation.)


(2) Quality inspection records of steel structures (pressed metal plates) inspection batches;


(3) Quality inspection records of inspection batches for steel structures (anti-corrosion coating);


(4) Quality inspection records of steel structure (fire resistant coating) inspection batches;

 


9. The content and examples of shadow inspection required for steel structure engineering:


(1) Example of filling in shadow inspection for steel structure bolt connection:


① Product certificate and inspection report for high-strength bolts used in steel structures.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 热水工程|空气能热水工程|超低温采暖工程|太阳能热水工程|空气源热泵厂家|炬邦热能设备有限公司 热熔钻孔机【优质厂家】_多年热熔钻设备研发制造经验 | 指挥调度|调度系统|应急指挥调度|应急指挥|可视化调度|多媒体指挥调度|融合通信|综合调度|应急指挥系统|IP调度系统-北京瑞光极远数码科技有限公司 | 景德镇芳然装饰有限公司 | 泥浆振动筛|卧式泥浆搅拌器|泥浆离心机|泥浆处理固控设备_沧州宏宇石油机械有限公司 | 河南反渗透设备,河南纯净水设备,河南软化水设备,郑州EDI超纯水设备,郑州水处理设备厂家_河南江宇环保科技有限公司 | 久久91精品久久91综合_国产亚洲自拍一区_国产精品第1页_亚洲高清视频一区_91成人午夜在线精品_亚洲国产精品网站在线播放_亚洲国产成人久久综合区_国产精品亚洲专区在线观看_免费视频精品一区二区三区 | 前海卡的物联智能技术(深圳)有限公司 | 欧派板材官网 | 全屋定制板材 专业供应商| 陕西筱润智能科技有限公司 干部人事智能档案柜 智能密集架 智能档案柜 部队选层文件智能柜 智能枪弹柜 财务智能档案柜 边防武警智能密集架 医院智能档案柜 部队选层文件智能柜智能枪弹柜 学校医院文件柜 企事业单位公检法智能文件柜 生产厂家-筱润智能科技有限公司 RFID射频智能密集架 全自动智能选层档案柜 智能密保柜 枪柜部队营房营具床桌椅办公家具 办公用品档案盒设备货架 全自动智能选层柜生产厂家-筱润智能科技有限公司 | 郑州腾飞建设工程集团有限公司 | 智能照明模块,智能动力控制器,巨川电气-智能电气领航 | 景德镇薪如陶瓷有限公司| 收银系统_收银机_pos收款机_门店管理系统-客如云 | 苏州涂附磨具厂家-陶瓷磨具-树脂磨具批发-苏州磨料磨具-苏州远东砂轮有限公司 | 庭院大门,铝艺大门厂家,别墅庭院大门「免费设计」汉兰达庭院门厂家 | 深圳-广州-惠州-东莞-重型货架-悬臂-轻中型货架-深圳市诺普泰仓储设备有限公司 | 上海熙隆光电科技有限公司-半导体激光器,一字线激光器,光纤耦合激光器,拉曼激光器 | 盐城市宏展环保材料有限公司-官网-滤袋,过滤袋,液体过滤袋,袋式过滤器,无纺布过滤袋,废液过滤袋 盐城市城镇化建设投资集团有限公司[盐城国资企业、盐城国资集团、盐城文化旅游、盐城基础设施、盐城土地开发、盐城粮食收储] | 硬脂酸钡_硬脂酸镁_硬脂酸镉_硬脂酸铝_硬脂酸锌-石家庄中石恒达矿产品有限公司 | 深圳专卖店设计,餐饮空间设计,酒店空间策划设计【左右高端人文空间设计公司】 | 注册公司计|代理记账|临港招商_上海临港商盟官网 | 铁氟龙膜/板/棒-铁氟龙网带/胶带/胶布-[东莞华氟]专注铁氟龙及特氟龙制品生产 | 物联网环控器-智能养殖监控系统-智能化养殖控制器-养殖环境控制器-朗锐恒科技 | 前途汇医药科技(北京)有限公司| 微型电磁阀_隔膜泵_活塞泵_微型水泵_微型真空泵_微型气泵【东莞市宗旨电子科技有限公司】 | 南京三维动画制作公司,企业视频制作,视频拍摄,FLASH动画设计,宣传片拍摄,广告片制作 | 滤布_PP滤芯_过滤芯_线绕滤芯_碳纤维滤芯 - 东莞市三比过滤器材有限公司 | 智能电地暖_电地暖安装_电地暖价格-西安秦星暖通工程有限公司 | 双合金_注塑机_螺杆|炮筒|料管|料筒-广东海驰德塑胶机械有限公司 | 煤炭烘干机|煤泥烘干机|矿泥烘干机|酒糟烘干机|果渣烘干机-东鼎干燥官方网站 | 南京三维动画制作公司,企业视频制作,视频拍摄,FLASH动画设计,宣传片拍摄,广告片制作 | 涡流探伤仪-超声波探伤仪-上海仓信电子科技有限公司 | 郑州月嫂|月嫂培训|月嫂服务|郑州布卢家政服务有限公司 | 饲料设备_饲料加工设备_饲料成套加工设备专业提供商-河南杰昌机械设备有限公司 | 造雪机|人工造雪机|造雪机价格|造雪机厂家-河南晋安机械科技有限公司 | 驾驶洗地机|手推洗地车|天津洗地机|扫地车|仓库工厂扫地机|工业吸尘器|扫雪机|耐洁思 | 少妇厨房与子伦_污污内射久久一区二区欧美日韩_四房婷婷 | 汽车轴承|圆锥滚子轴承|轴承生产厂家|赛襄轴承 | 育婴师_催乳师证_月嫂证怎么考_育婴师证报考需要什么条件-家政培训网 | 引流砂_铁钩料_吹氧管_涂层吹氧管_耐火涂层吹氧管-山东恒诚 | 土石_泥石分离机_无轴滚筒筛_振动筛 - 巩义市鑫利重工机械制造有限公司 |