www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Steel and steel component assembly installation requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.huihuitaotao.cn

Steel and steel component assembly installation requirements

Time:[2014-7-12]  Hits:5755

Steel and steel components assembled device requirements:
Foshan welded H-beam steel flange plates and webs seam seam spacing should not be less than 200mm.
Flange plate splice length should be less than 2 times the plate width. Web splice width should not be less than 300mm, the length should not be less than 600mm.
Cranes and crane girder truss system in place should not be under the scratch.
When multi-section column device, the positioning of the axis of each section of the column axis manipulation should lead directly on the ground, can not lead from the axis of the lower column, to avoid the formation of excessive accumulation errors.
After the completion of the steel truss structure and overall fight should leave after completion of the roof measuring its deflection, deflection and the measured value should not exceed 1.15 times the corresponding planning values.
Remember:
Paint, painting several times, coating thickness should fit planning requirements.
When planning for the coating thickness is not required, the total thickness of the coating: Outdoor should be 150μm, interior should be 125μm, the allowable deviation for each pass coating thickness of 25μm tolerance for 5μm..
Thin coating fireproof paint coating thickness should fit the planning requirements for fire resistance. Thick coating fireproof paint coating degrees, more than 80% of the area should be consistent with the relevant planning and fire resistance requirements, and should not be less than the thickness of the thinnest planning 85%.
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 天堂最新在线资源 | 在线观看 a国v | 婷婷综合亚洲 | 最新网址在线观看 | 日韩视频中文字幕专区 | 天天做夜夜做久久做狠狠 | 午夜视频在线免费看 | 永久免费观看午夜视频在线 | 泷泽萝拉女教师被强在线 | 亚洲成a人不卡在线观看 | 亚洲精品成人a | 日韩在线手机看片免费看 | 天堂√在线官网 | 美女的扒开大腿让男生摸图片 | 欧美线人一区二区三区 | 青柠在线影院观看 | 在线综合+亚洲+欧美中文字幕 | 日韩黄色大片免费看 | 最近韩国中文字幕更新 | 天天爱天天干天天操 | 欧美人善zozσ性伦交 | 日处女小说 | 最近中文字幕无吗高清免费视频 | 婷婷中文 | 午夜视频在线观看完整高清在线 | 男人狂躁进女人下面30分钟 | 最近日本免费观看视频 | 有没有免费的视频在线观看 | 毛片一级视频 | 四虎永久在线精品视频免费观看 | 5388国产亚洲欧美在线观看 | 免费女上男下xx00xx动态图 | 欧美老肥熟 | 欧美特黄一区二区三区 | 综合天天 | 日本一区精品久久久久影院 | 色福利网| 91正在播放极品白嫩在线观看 | 亚洲免费在线视频 | 深夜成人福利 | 高清在线观看视频 |