www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Mixed steel installation drawings and design changes
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.huihuitaotao.cn

Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:4852

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美性猛交aaaaa免费看| 总受高h| 每日最新avhd101天天看新片| 日本人xxxxxxxxx192| 综合网天天| 久99频这里只精品23热 视频| 日本在线一区二区三区| 欧美在线观看免费一区视频| 日本xxxww| 久久精品免视着国产成人| 高清视频完整版在线观看| 调教美女校花| 伊人中文在线| 日本丰满巨乳506070| 草逼影视| 中文字幕天堂最新版在线网| 97神马影院| 男同hd| 8x8x国产| 最新男同志gayxxx男男| 成年人在线看片| 日韩欧美视频一区二区| 多波野结衣在线观看| 91精品国产闺蜜国产在线| 濑亚美莉喷奶图| 欧美在线精品一区二区在线观看| 青草视频在线播放| 日韩轮理| 99视频国产在线| 在线观看国产情趣免费视频| 99精品久久99久久久久| ass伊拉克肥女pics| 在线视频aa| 日韩欧美一区二区三区在线| 99视频只有精品| 粉色的逼| 一区二区三区不卡在线观看| 成人欧美一区二区三区视频xxx| 最新男同志gayxxx男男| 大伊香蕉精品一区视频在线| 伊人婷婷在线|