Steel works construction schedule control content

Time:[2014-11-15]  Hits:5030

(1) pre-schedule control include: steel structure engineering controls to determine the construction schedule of work content and features, control methods and specific measures to achieve the objective analysis of the progress of risk presented problems to be solved; in accordance with the contract period, the construction schedule objectives and project staging production requirements of the construction preparation work and the timing of the construction tasks to determine the interface between the various units of construction engineering, engineering jobs and full-site engineering; the use of water construction principle, segmental construction of scientific organizations to achieve three-dimensional and assembly-line plane, while the application of network planning techniques, the preparation of the implementation of the local network plan, according to a key line of work to achieve continuity and balance construction; construction works in the project schedule as the basis of the total annual projects, identified steel the image of progress and structural engineering resources required (including manpower, material resources, materials, equipment and funds, etc.) supply plan.
(2) the matter of schedule control include: the establishment of the progress of implementation of the system construction steel structure engineering controls; timely construction progress inspection, make a record, keep abreast of the progress of the implementation of dynamic; the progress of data collection and statistical collation, and with compared schedule, which found that if there is progress and the progress of the deviation predicted feasible modifications measures; readjust schedules and related plans and implementation; enhance on-site construction management and scheduling, timely prevention and treatment occur in construction technical issues, quality incidents and accidents, reduce the impact of these issues on the schedule.
(3) after the schedule control include: the timely acceptance of tissue engineering, process engineering claims, project progress data compilation, classification, cataloging and archiving and so on.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美三级一区二区三区| 91精品国产手机在线版| jux441在线三浦惠理子观看| 91精品国产免费久久久久久| 97成人资源站| 91碰在线视频| 中国熟mature乱视频| 在线观看视频高清视频| 一个人看的视频在线| 久草久草久草| 又大又粗又黄又湿又爽又刺激| 看黄无限数破解| 三体动漫在线观看完整版| 免费欧美黄色| free性开放欧美群做a| 综合久久影院| 91精品国产露脸在线观看| 91色国产在线观看| 一个人看的免费高清视频| 乖巧萝菊蕾小说| footjob在线| 草天堂| 波多野结衣女教师6bd| 欧美又粗又长又湿又黄的视频| 久草视频在线看| 久久免费资源福利资源站| 久久精品大片| 日本高清一区二区三区不卡免费| 日本高清一区二区三区水蜜桃| 1314亚洲人成网站在线观看| www.色播.com| 欧美日韩视频精品一区二区| 欧美拍拍视频| 久久九九热re6这里有精品| 一区二区三区四区国产精品| 久久精品国产精品亚洲红杏| 青青青久97在线观看香蕉| 欧美日韩亚洲天堂| 一个人在线观看完整版中文| 日本综合色| 开心色xxxx|