The most commonly used terms in the history of the whole building (and quickly Favorites bar)

Time:[2014-12-6]  Hits:5542

The most commonly used terms in the history of the whole building (and quickly Favorites bar)
First, building common noun
1. What is the volume rate?
A: The floor area ratio is the ratio of total floor area of the total land area. Generally expressed in decimals.
2. What is the building density?
A: The building density is the ratio of the area of the total land area of the total area of the base. Generally expressed as a percentage.
3. What is the rate of green (green rate)?
A: The green rate is the ratio of the total area of green projects and a total land area. Generally expressed as a percentage.
4. What is the sunshine spacing?
A: sunshine spacing is between the front and rear of two buildings, as determined in accordance with the requirements of sunshine hours away. Calculation of sunshine spacing, generally south direction solstice noon that day the windowsill above the housing bottom wall, can be based on the height of the sun shine.
5. What is the difference between the buildings and structures?
A: Where for people in which the production, living or housing or place other activities are called buildings such as apartments, factories, schools and so on; and people are not one of them produced or living building, then called the structures, such as chimneys, towers, bridges and so on.
6. What is building the "three timber"?
A: The building "three material" refers to steel, cement, wood.
7, construction and installation costs by which three parts?
A: The construction and installation costs by labor costs, material costs, machinery costs of three parts.
8. What is the unified modular system? What is the basic module, expand modulus, parting number?
A: (1) the so-called unified modular system is a set of basic rules in order to standardize the design and develop, so the size of the various divisions between different buildings harmonization, so that it has the versatility and interchangeability to speed up the design speed, improve construction efficiency and reduce cost.
(2) The basic modulus is the modulus of the selected basic dimensions coordination unit, represented by M, M = 100mm.
(3) expand the modulus is a modulus of export, its value as a multiple of the basic modulus. A total of six kinds of expanded modulus, respectively, 3M (300mm) 6M (600mm) 12M (1200mm) 15M (1500mm) 30M (3000mm) 60M (6000mm). Building a larger size, such as width and depth, span, column spacing, etc., should be a multiple of a modulus expand.
(4) sub-modulus is derived another modulus, its value for the sub-multiple of the basic modulus. Parting total number three, namely 1 / 10M (10mm) 1 / 5M (20mm) 1 / 2M (50mm). Building a smaller size, such as cracks, thickness of the wall, structure nodes, etc., should be a sub-multiple of the modulus.
9. What is the symbol size, structure size, actual size?
A: (1) is used to mark the size dimension between buildings positioning axes (width and depth) of the distance size, as well as products building materials, components, construction-related equipment location boundaries between. Sign dimensions shall conform to the modular system.
(2) the size of a building construction products, building components and parts of the design dimensions. Configured size of less than or greater than flag size. In general, the size of the structure plus the size of the gap reserved for the necessary support or minus sign dimension equal size.
(3) The actual size of the building products, construction components and parts have real size. The actual size of the difference between the size and structure should be allowed for the construction of a tolerance value.
10, what is the positioning axis?
A: Positioning axis is used to determine the location and size of the line mark the main building structure or component.
11. What is the horizontal, vertical? What is the transverse axis, the longitudinal axis?
Answer: (a) transverse direction refers to the width of the building.
(2) the longitudinal direction, the longitudinal direction of the building means.
(3) disposed along the axis of the width direction is called the transverse axis of the building. Its numbering method using Arabic numerals written from left to right in the axis of the circle.
Axis (4) along the length direction of the building called the longitudinal axis. Its numbering from top to bottom using uppercase letters written in the axis of the circle (where the letters I, O, Z do not).
12. What is the house of the bay, into the deep?
A: The wide bay a house in the distance, and between the two transverse axis; depth refers to the depth of a house in the distance, and two longitudinal axis.
13. What is the story? What is the ceiling height?
A: The story refers to the height of the building between the layers, and the supremacy of the floor or on the ground floor or the ground floor height; headroom in height refers to the height of the room, and floor to ceiling under the skin
14. What is the total height of the building?
A: The total height of the building refers to the top of the outdoor terrace of the total height of the eaves.
15, what is the elevation? What is the absolute elevation, relative elevation?
A: The height of a part (1) of the building and to determine the reference point of water, known as the parts of the elevation.
(2) the absolute elevation known as altitude, mean sea level of the Yellow Sea near Qingdao as absolute zero elevation, the elevation of the country are as a benchmark.
(3) the relative elevation of the first floor is the main room of the building's interior surface is zero (+0.00), represents the first floor height from the ground somewhere.
16. What is the construction area, the use of space, the utilization rate? What is the transportation area, structure area?
A: (1) the construction of a building area of length, width, size of product outsourcing and multiplied the number of layers. It made use of the area, traffic area and structural composition area.
(2) use of an area refers to the main use of the room and auxiliary use the net area of the room (minus the net area of the axial dimension of the net proceeds thick and the size of the product).
(3) room rate, also known as usage, refers to the use of the area as a percentage of the construction area.
(4) The area is defined as the net area traffic corridors, stairwells, elevators and other transportation links between facilities.
(5) refers to the structure of the wall area, the area occupied by the column.
17, what is the red line?
A: The red line refers to the planning department granted to the construction unit of area, usually circled in red on the drawing, the force of law.
18, how to divide the building rating?
A: The rating is based on building endurance rating (useful life) and fire resistance rating (refractory life) were divided.
(1) Press the durability classification is divided into four levels: more than a durable life of 100 years; two, durable life of 50 to 100 years; three, durable life of 25 to 50 years; four, durable life of 15 years the following.
(2) according to fire resistance classification is divided into four levels: from one to four, to gradually reduce the fire resistance of the building.
19. What is the brick structure?
A: The vertical load-bearing member house using brick or brick columns, horizontal load-bearing elements of reinforced concrete floor, roof panels, brick structure called such a structure.
20. What is the framework?
A: The framework defined by the skeleton composed of pillars, longitudinal beams, horizontal beams, slabs, etc. as a load-bearing structure, the wall is the envelope.
21. What is the shear wall?
A: refers to the level of shear resistance within the framework of additional shear walls. Due to high-rise buildings to resist horizontal shear is mainly caused by an earthquake, it is also known as seismic shear walls.
22. What is the frame shear wall structure?
A: The frame shear wall structure refers to the vertical load shared by the frame and shear wall; horizontal loads from the frame to withstand 20% to 30%, 70% to shear bear 80% of the structure. Shear length per square meter of 50mm standard design.
23. What is the full shear wall structure?
A: The whole interior shear wall structure is the use of a building (or the interior and exterior) as a load-bearing skeleton to withstand the vertical load and horizontal load building structure.
24. What is the tube structure?
A: tubular structures by frame - shear wall structure from the full shear wall structure with a comprehensive evolution and development. Tube structure is dense column frame shear wall or centralized internal and external to the housing to form a closed cylinder space. It features a large shear focused and get free partition space, used for office buildings.
25. What is steel?
A: Steel is the main load-bearing structural components of a building made of steel. With light weight, high strength, good ductility, fast construction, shock resistance and good. Steel used for high-rise buildings, the higher the cost.
26, compared with brick and concrete structure, frame structure what advantages and disadvantages?
Answer:
Advantages: (1) Light weight: weight brick structure of 1500 kg / m; frame structure such as the use of light board (aerated concrete wall, metal frame walls, etc.) of the weight of 400 kg to 600 kg / m , only 1/3 of the brick structure.
(2) The rooms are flexible: the load-bearing structure of the frame structure for the framework itself, siding only separated from the envelope and effect, and therefore more flexible arrangement.
(3) increasing the effective area: frame structure thinner wall than the brick and concrete structure, the relative increase in the housing area.
Disadvantages: (1) steel brick structure than about 30% higher, compared with the brick structure, the high cost.
(2) part of the column cross-sectional size is too large, protruding wall, beautiful affected.
27. What is the difference between the foundation and the foundation?
A: (1) the foundation is the basis of the following soil, its role is to bear the entire load of the foundation came.
(2) is based on building buried in the ground below the load-bearing components, is an important part of the building, its role is to bear the entire load of the building passed down, and these, together with the weight of the load transmitted to the soil below.
28. What is the basis of depth? What is the deep foundations, shallow foundations?
A: (1) foundation depth is measured from the floor to the outdoor design basis underside of the vertical distance.
(2) the depth is greater than or equal to 5 meters deep foundation called basis; depth between 0.5 meters to 5 meters foundation called shallow foundation. Foundation depth shallower than 0.5 m not.
29. What are the three basic structures can be classified in different ways?
A: (1) by the use of the material sub: can be divided into brick foundation, rubble foundation, concrete foundation, reinforced concrete foundation and so on.
(2) divided by tectonic forms: can be divided into independent foundation, strip foundation, well grid foundation, slab foundation, raft foundation, box foundation, pile foundation and so on.
(3) by the use of the mechanical characteristics of the material points: can be divided into rigid base and flexible foundation.
30. What is the vapor barrier?
A: In order to prevent moisture underground and surface water rises along the walls of the wall erosion, with waterproof material separates the lower part of the wall and the upper wall, the blocking layer is a vapor barrier. The general location of the vapor barrier under the first floor interior floor (+0.00) 60mm ~ 70mm Department, and elevation -0.06m ~ -0.07m place.
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 直膨式空调机组_风冷恒温恒湿_转轮式热回收_屋顶式空调机组_德州瑞尼森环保科技有限公司 | 假肢价格-大腿假肢小腿假肢假手指-河南舒捷假肢厂家 | 吉林人才网_吉林招聘网_求职找工作平台 | 中国C919飞机橡胶接头供应商-上海淞江减震器集团有限公司官方网站 | 指挥调度|调度系统|应急指挥调度|应急指挥|可视化调度|多媒体指挥调度|融合通信|综合调度|应急指挥系统|IP调度系统-北京瑞光极远数码科技有限公司 | 无轴螺旋输送机_双无轴螺旋输送机_垃圾,污泥无轴螺旋输送机-新乡市大汉振动机械有限公司 | 徐州户外广告,标识标牌,展陈空间,精神堡垒-徐州雅努思文化发展有限公司 | 滑动轴承_无油自润滑轴承_复合干式_含油铜套_石墨铜套-嘉善盛元自润滑轴承厂 | 水硬度在线分析仪-氟离子|悬浮固体浓度分析仪-ldo分析仪-上海植茂 | 河北伟业波纹管-百顺牌波纹补偿器(波纹管,膨胀节,伸缩节)、非金属补偿器 | 智能访客系统 - 来访登记系统_微信预约系统_人员出入管理系统_访客机_人脸识别系统门禁闸机 | 吉林人才网_吉林招聘网_求职找工作平台| 新闻营销媒体发稿-新闻发布-文芳阁网络媒体发稿公司 | 太原仪诚实验室设备有限公司 | 青田人才网_青田招聘网_求职找工作平台 | 郑州冷却塔_河南冷却塔-河南金创制冷设备有限公司 | 青州东威机械有限公司,洗沙机,脱水筛、细沙回收机,淘金设备,洗石机,砂石分离机,筛沙机,采沙船,清淤船,破碎制砂机,海沙淡化设备 | 真空机器人维修_晶圆机械手保养_半导体机械臂维修_面板机器人保养_AMHS改造-广州市广科智能技术有限公司 | 随车吊/洒水车/低平板运输车-程力专用汽车股份有限公司 | 华网,华网资讯,华网头条,华人网络家园 | 喷涂机器人|自动喷涂生产线|自动喷涂设备|自动化生产线-深圳市荣德机器人科技有限公司 | 耀美软瓷施工队-13638350103-专注于软瓷施工勾缝的贴软瓷施工队 - 软瓷,软瓷施工,软瓷勾缝,软瓷怎么施工,软瓷怎么勾缝,贴软瓷,软瓷施工队 | 温州合发模架科技有限公司 | 宁波搬家_宁波搬家公司_宁波搬厂_专业搬家搬厂-「宁波喜洋洋搬家公司」 | 山东万利精密机械制造有限公司-高速金属圆锯机,数控高速圆锯机,高速圆锯机生产厂家 | 履带式移动破碎站-移动筛分站-移动碎石机-破碎机_山东奥凯诺矿机 | 郑州华特仪器设备有限公司-dlsb低温冷却液循环泵-SHZ-DIII循环水真空泵 | 停车场收费管理系统,通道闸系统,门禁系统,东莞停车场收费管理系统,东莞通道闸系统,-东莞市骄阳交通设备有限公司 | 无负压供水设备-杭州勤铭机电有限公司| 碎料机_拌料机_吸料机_温控箱_烤料斗_模温机_东莞索亿塑料破碎机厂家 | 呼吸家官网|肺功能检测仪生产厂家|国产肺功能仪知名品牌|肺功能检测仪|肺功能测试仪|婴幼儿肺功能仪|弥散残气肺功能仪|肺功能测试系统|广州红象医疗科技有限公司|便携式肺功能仪|大肺功能仪|呼吸康复一体机|儿童肺功能仪|肺活量计|医用简易肺功能仪|呼吸康复系统|肺功能仪|弥散肺功能仪(大肺)|便携式肺功能检测仪|肺康复|呼吸肌力测定肺功能仪|肺功能测定仪|呼吸神经肌肉刺激仪|便携式肺功能 | 品润财税_广州公司注册_南沙代理记账服务_危化证出口退税外国人工作签证代办 | 深圳汽车贴膜_深圳全车车身改色贴膜|UPPF隐形车衣官网 | 橡皮艇_冲锋舟_充气钓鱼船_橡皮艇价格_海威龙橡皮艇生产厂家-首页 | 重庆教师资格网-重庆教师资格证考试网 | 微机保护装置_发电机保护_变压器保护_逆功率保护_防孤岛保护装置_光伏发电_杭州继保电气集团有限公司 | 双螺杆挤压膨化设备_挤压熟化设备_烘干设备_油炸设备及喷涂调味设备-山东铭本机械科技公司 | 深圳U盘工厂 U盘厂家 U盘生产厂家 礼品U盘定制 深圳正益通电子公司 | 南通市通州区锦标建材有限公司-排水板,塑料排水板,植草格厂家 | 铝基板_铜基板_铝基板厂家诚之益电路—汽车灯铜基板行业制商 | 矿用精确定位系统,井下4G无线通讯系统,工作面集控系统,皮带保护系统-山东新云鹏电气有限公司 |