Discussion: construction quality fireproof paint

Time:[2014-12-10]  Hits:5388

Discussion: construction quality fireproof paint

Construction Notes (a) fireproof paint

1, the substrate surface cleaning fireproof paint should serve as a rigorous inspection process. Remove dust, iron, rust, grease, and other substances hinder adhesion and good anti-rust treatment of the substrate. Fireproof coatings and surface coating layer should be a corresponding support, not rust primer steel.

2, fireproof paint spray paint to master consistency, mouth spray distance and grab components and injection pressure when the air compressor. MAIN OUTCOME construction, construction parameters described splashed thing more unreasonable and should be adjusted. Content is not too much paint thinner, otherwise it will reduce the viscosity of the normal construction paint, paint can not be attached to the steel surface.

   3, fireproof spray protection by trained and professionally qualified construction team construction corresponding construction quality. Strict construction program based on engineering and other features and product selection. Physical and chemical properties of the coating in accordance with engineering works required before the required proportion for sampling. Intumescent fire retardant coating for construction should be selected in different parts of the test foaming properties.

4, after the completion of the project can not only measure the thickness of the coating should also be visually detected by coating color coating and crack and leak case, with 0.75 ~ 1kg hammer to tap the coating detected intensity, etc., with 1m ruler detection coating flatness. Coating should be smooth, no significant depression, firmly bonded, no powder, loose and floating pulp, mastoid has been removed, seamless coating, from powder, obvious cracks.

5, in the coating application process, you must forward again after drying and curing the coating base, again after re-construction. Protection coatings, construction passes and the protective layer thickness should be determined in accordance with the requirements of the construction design, each pass coating thickness should be moderate, not too thick or roll evenly, so as not to affect the quality of the coating. Conducted in strict accordance with the coating process, in order to avoid rush period and to building a security risk.

6, the coating thickness should meet the design value, it should be made thicker parts processing node. Spraying site requirements, component surface treatment, filling seams, paint preparation, spraying passes, such as quality control and inspection, shall comply with existing national "fireproof coatings technical specifications" (CECS24) the required standards. The coating thickness should side edge construction inspection (measured by thickness). If the crack width coating widespread and large, research and analysis process should be correct, paint mixing ratio is reasonable.

(B) construction quality fireproof coatings main problem

Fire-resistant coating is formed by coating application engineering staff at the surface of steel components, to complete the whole process of fireproof coatings. Construction is fireproof paint fireproof paint secondary production process, if improper construction can also affect the quality of fireproof coatings project. Construction of the main problems,

1, ignoring the substrate surface cleaning, fire retardant coatings affect performance.

2, the construction team does not have the appropriate construction quality, technical strength is not weak.

3, before construction is no scientific construction plan, the construction process can not be strictly in accordance with the technical standards of construction quality inspection.

4, the completion and acceptance of fire-resistant coating is only rely on visual inspection and coating thickness testing, lack of strict acceptance criteria and testing methods.

5, the pursuit of appearance and finish, polished coating or fire retardant paint coating outside brushing ordinary decorative coatings, resulting in the technical performance of the coating is not guaranteed.

(C) acceptance fireproof coatings

1, fireproof coatings inspection report should provide the following:

(1) the amount of purchase orders fireproof paint;

(2) fire retardant paint coating side edge construction inspection records;

(3) inspection and acceptance test items hidden project records;

(4) the completion of the report after the completion of the single and self-test report;

(5) the construction site inspection records and quality control during the construction of major issues deal with submissions;

The fire resistance test report (6) fire retardant coating national testing agencies and physical and chemical properties of the test report, fire department issued a production license supervision and production of the factory product certification.

2, fireproof coatings project must go through mediation before acceptance testing professional organizations

Fireproof coatings should also be included in the "building fire testing procedures", "building fire acceptance criteria" such as technical standards, all painted interior, front outer fireproof coatings construction completion and acceptance testing organizations must have an intermediary steel structure fire retardant coating detection qualified report.

Fireproof paint testing and acceptance is based mainly: GB14907-2002 "fireproof paint general technical conditions", GB50205-2002 "steel construction quality and acceptance", CECS24 "fireproof coatings application of technical specifications." Fireproof paint the fire resistance measurement method should determine the type of environment and under fire, such as by: petrochemical enterprises use fireproof coatings, its fire resistance test temperature curve should be measured hydrocarbon fire, it is more realistic .

Construction strengthen surveillance, observation and attention to the appearance of quality coating thickness checks and other construction quality inspection and found the problem immediately rectification; checks must pass rigorous testing after completion. In addition, research and technology development fireproof coatings are also expected to improve fire safety in a variety of physical and chemical properties and to seek a breakthrough performance, while supporting research fireproof coatings and coating durability of construction equipment, improve the level of construction technology, a clear coating updating and maintenance methods and cycles. So as to better improve the overall fire resistance fireproof coatings. After brushing fire retardant coating on steel, greatly improving the fire resistance of steel, but in fireproof coatings applications, there are improper coating selection, poor construction management, final acceptance, testing is not standardized, and many other issues seriously affect the quality fireproof coatings. Must pay attention to a reasonable selection of pre-construction products, determine the correct construction program.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 青青在线精品2022国产 | 欧美福利社 | 成人国产精品免费视频 | 欧美最新一区二区三区四区 | 色婷婷久久综合中文久久蜜桃 | 亚洲高清国产一线久久 | 4hu最新地域网名2023 | 俺去啦婷婷 | 亚洲国产精品成人综合色在线婷婷 | 成a人片亚洲日本久久 | 一级毛片免费的 | 欧美亚洲国产日韩综合在线播放 | 亚洲日本欧美 | 四虎影院免费在线 | 成人国产一区二区三区精品 | 欧美成a人免费观看久久 | free性开放欧美群做a | 欧美特一级片 | 日本免费专区 | 午夜视频在线免费 | 2019精品手机国产品在线 | 久久精品亚洲视频 | 中文三 级 黄 色 片 | 久久免费黄色 | 日日摸夜夜摸人人嗷嗷叫 | 欧美精品九九99久久在观看 | 啊好爽轻点| 日韩一区二区中文字幕 | 青草福利视频 | 在线h观看| 欧美一二三区在线 | 9久久这里只有精品国产 | 9总探花新品牛仔背带裤视频 | 天天看天天射天天视频 | xvideos全球最大的免费中文 | 天天爽天天狼久久久综合 | 岛国一区二区三区 | 久热这里有精品 | 99re在线播放 | 性感制服| 久久精品男人的天堂 |