About Building Construction Safety Supervision Measures

Time:[2014-12-31]  Hits:5463

About Building Construction Safety Supervision Measures

Promote the progress of science skills to enhance the skills of building construction, continuous improvement in the quality of the project also found a lot of new questions. Work place safety supervision of construction process is ubiquitous question, making accidents continue to occur. Combined with the actual situation, we must continue to strengthen safety supervision measures, in order to actively improve the quality of the project, to ensure the construction operation is completed within the stipulated time, and create greater economic benefits for the construction units. In order to maintain the safety of construction projects in the construction process must strengthen supervision of work safety in construction.
1, the load-bearing frame aspect of supervision template
1.1 review the construction program for review of the construction program, we must do all aspects of the view, the primary material specification contains templates and support systems, joint method, internal structure, horizontal bar, etc., which are reviewed one by one according to the needs of the construction drawings.
Pole at the bottom of the upper support structure required to achieve the support load requirements; template pole construction to withstand the load, should remain two or more columns, add a column at the bottom of the needs of wood pallets, do not allow the use of brick and brittle materials bedding; with regard to maintaining the firm as a whole column, add device support pillar in the process and the level of demand scissors; after setting pole height 2m beyond the level of support the needs of two; the level of a full house template should be reinforced to support the pole set on four sides and center of every pole bracket Add a longitudinal cross-pole four-scissors; pole after every increase of 1.5m ~ 2m need to add a level of support; accurate accounting of the column spacing, the use of quasi-48 steel pipe from the need to control time within 1m?.
1.2 View formwork of steel, fasteners construction process, the choice of steel tubular support system must be based on the specific circumstances, some cases are not allowed to use such a structure, such as: formwork height greater than when 8m, span greater than 18m, total construction loads greater than 10kN / m2, concentrated line loads exceed 15kN / m, which must be adopted to stop fastening steel support system, you can choose the steel columns, steel brackets and other system instead. In the erection of the template used in load-bearing steel frame, fasteners shipped to the construction site in the future, should the material sample to see, when there is abnormal test should be timely rectification reinforcement.
1.3 Quality control erection erection quality directly affects the entire building construction science, construction should be timely and perfect before and after erection work. Quality control is usually adopted when the erection methods include: erection professional level view of the operator; see the erection can meet the engineering design requirements; View pole, sweeping bar, horizontal bar, scissors and other specific parts of the erection and the number and specification is not consistent, if found to need further review in accordance with the different drawings.
2, scaffolding safety supervision
When the erection of scaffolding erection aspects of demand combined with 2.1 specification developed by the construction program, a good erection after design work must be handed over to the unit responsible person in charge of marking signed and submitted to the responsible person in charge of the project to see the acceptance, when determining program eligibility to invest in the future specific operation. Scaffolding support system should be solid and reliable, if encountered some large areas of support bent, the special needs of developing construction design, construction specifications and reference erection operations. Erection early demand for specific materials stern view erection, erection of structural stability concerns, review the primary focus of the force components for steel, fasteners, etc., in order to ensure that the future structure of the carrying capacity of the construction and load size. Subject to safety skills sector construction units listed reinspection after erection work is completed before use.
Put into use after 2.2 use of scaffolding, the master node to stop longitudinal, transverse horizontal bar, sweeping bar, even the removal of the wall components, and good fastness to view their connection, be sure to set and connecting rods, and even wall pieces, support , openings and other internal structures truss construction specifications can be achieved. In addition, demand for water adhere to the foundation, many aspects of loose base, pole and other questions dangling. Good security measures and avoid overload occurs when using scaffolding. Settlement and vertical deviation degree beyond 24m height scaffolding pole should viewer is not within specifications.
2.3 After construction demolition aspect needs to be timely removal of scaffolding, demolition process should be conducted in a certain order, usually from top to bottom and gradually dismantled. Meanwhile, even the wall pieces, also needs to follow a common dismantle scaffolding, it can avoid the other after the removal of the scaffolding loose. Members were removed after throwing altitude stop demolition process should be set by the person monitoring the security warning area.
3, construction safety supervision machinery
3.1 crane crane prime viewing areas when it comes to building included: stopper, insurance device, torque limiter device attached to the wall with the track roadbed, track pliers and other contents of the folder structure. When viewing a demand to ensure that the crane torque limiter, since the integrity of the different travel limit switch devices used in weight limiters configured settings are not in a normal state, and to maintain the integrity of these components, with no free entry operation. When using a crane, the demand for environmental supervisors seek command operations and strengthen different aspects of view, to ensure that the crane can achieve operational requirements demand.
3.2 material hoist materials hoist prime viewing areas are: aircraft-manufacturing, the frame body stable, many aspects of rope, equipment inspection, aircraft and the like. Enhance the rope to stop the connection, tip and reel with strong demand for the roll should refer to the order; the lowest position when the job reaches the basket, keeping the rope reel up more than 3 laps; add hoist dock safety equipment needs, port dock floor railing and other related equipment; rack and rack attached to the wall of the body, such as construction, demand combined with rigid parts connected, and maintain the stability of structures, connect it to stop on the scaffold; strict accounting of wind cable hoist rope length , the material must use steel wire; when the hoist height of less than 20m, wind cable rope required beyond a group; hoist height when in 21m ~ 30m, required to go beyond the two groups; the hoist use process, should ensure that the material in evenly distributed within the basket, stand up long expected to make use of anti-rolling process method to avoid overloading.
4. Conclusion
In summary says, strengthen safety supervision in construction is not lack of jobs, which each link supervisors needs to be controlled, so you can ensure the smooth conduct of the construction process, the elimination of all kinds of accidents and adverse effects of the accident the probability is reduced to a reasonable level to ensure smooth implementation of the project.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 青州市泰航机械设备有限公司 | 衢州网站建设_网络公司_做网站_网站制作_网页设计-优骆网络 | 深圳车牌识别系统厂家_人脸识别厂家_通道闸厂家_车位引导系统_智慧社区管理系统_深圳市利普诺科技有限公司官网 | 淘客联盟平台_网络电话系统-河南英邦软件科技有限公司官网 | 兰州沙盘模型公司_兰州模型公司_兰州沙盘模型厂家_地形沙盘制作_兰州沙盘模型制作公司 | 弯箍机_钢筋弯箍机_全自动钢筋弯箍机_数控弯箍机-建科智能装备制造(天津)股份有限公司 | 四川方法数码科技有限公司 | 容积式换热器,半容积式换热器-绍兴市压力容器有限公司 | 免费建站_自助建站_网站建设_企业建站_中小企业建网站_免费网站模板-牵牛建站 | 造雪机|人工造雪机|造雪机价格|造雪机厂家-河南晋安机械科技有限公司 | 苏州空气压缩机-无油涡旋空压机-真空泵价格-变频空压机-苏州赫利亚斯气体技术有限公司 | 紫外线光疗仪|白癜风光疗仪|牛皮癣治疗仪|308纳米led|SIGMA|上海希格玛高技术有限公司 | 绿树海棠苗木网-苗木基地-苗木求购-苗木价格-苗圃苗木专业平台 | 美林基业集团官网——美林基业,一生挚诚| 云南昆明微信公众号小程序开发公司|抖音|网站建设APP制作-鸿翥网络 | 洛阳牡丹瓷工艺品生产厂家-特色旅游纪念品礼品定制网! | 洒水车厂家、消防车、污水处理车厂家-程力专用汽车股份有限公司 洒水车|冷藏车|LED广告车|油罐车|道路救援车|垃圾车|程力专用汽车股份有限公司销售九分公司 | 太原万通汽车学校[官网]-太原好的汽修培训学校,学新能源汽车技术,学汽修,学汽车检测与维修技术 | 生物可降解膜_全降解薄膜_可降解包装膜材料厂家-凯峰降解膜 | 取样冷却器-射水抽气器-锅炉炉水取样冷却器-连灵动 | 液压油缸生产厂家-常州辰佰液压机械有限公司 | 智能化会议系统|多媒体会议系统|无纸化会议系统|会议音箱|高清视频会议终端|智能化会议室|会议系统|视频会议系统-深圳市航视达科技有限公司 | 压力蒸汽灭菌器_脉动真空灭菌器_环氧乙烷灭菌器_等离子灭菌器_广州市科洋 | 混凝土布料机,隧道布料机,衬砌台车布料装置 - 河北聚力智能装备有限公司 | 重庆消杀公司-重庆斗哥环保科技-灭鼠公司-重庆灭蟑螂-除四害-灭老鼠-灭虫-重庆灭白蚁公司 | 上海森信实验仪器有限公司| 热水工程|空气能热水工程|超低温采暖工程|太阳能热水工程|空气源热泵厂家|炬邦热能设备有限公司 热熔钻孔机【优质厂家】_多年热熔钻设备研发制造经验 | 深圳展厅设计_产业园区展馆设计_展馆设计公司_健康产业展馆设计_展厅设计哪家好_华竣国际 | 找刑事辩护律师_找深圳刑事律师多少钱★王平聚【清华博士/刑法教授】 | 欧美日韩人妻精品一区二区三区_欧美成人精品欧美一级乱黄_亚洲欧美日韩高清一区二区三区_国产一级做a爰片久久毛片_日韩一级视频在线观看播放_精品一区二区三区免费毛片爱_完整观看高清秒播国内外精品资源 | 郑州四棉纺织有限公司-现代化纺织企业 | 涂料分散剂_水墨分散剂-厚洹化学水性色浆助剂厂家 | 河北博隆环保科技有限公司-甲醛检测_甲醛治理_光触媒 | 南通市科脉电子科技有限公司| 清洁公司| 保洁公司| 东莞清洁| 东莞保洁|壹壹清洁 | 微机保护装置_发电机保护_变压器保护_逆功率保护_防孤岛保护装置_光伏发电_杭州继保电气集团有限公司 | 皮带输送机(输送机械)-带式输送机-皮带输送机生产厂家-河南坤威机械 | 铝合金百叶窗_西安百叶窗厂家-西安市未央区通达建材物资部 | 武晋工程_江苏武晋工程咨询有限公司 | 清扫器-聚氨酯清扫器-合金清扫器-四连杆自动纠偏-机械纠偏-锥辊纠偏-衡水涌泉机械科技有限公司 | 盘扣租赁|盘扣架租赁|盘扣脚手架|盘扣脚手架租赁|盘扣式脚手架|盘扣式脚手架租赁-北京亚欧盟盘扣租赁有限公司 |