www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Foshan Steel Design Knowledge: Vertical regularity Tall buildings which seismic design points?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.huihuitaotao.cn

Foshan Steel Design Knowledge: Vertical regularity Tall buildings which seismic design points?

Time:[2015-1-7]  Hits:4724

Foshan Steel Design Knowledge: Vertical regularity Tall buildings which seismic design points?

Vertical rules of Tall Buildings Seismic Design Essentials What?
Design elements:
Overrun 1) facade revenue caused by the layer structure should ensure that the shear capacity of not less than 80% on an adjacent floor, and structural changes in effect controlled within a reasonable range. Incorporated into the site of the vertical component and the floor should be strengthened. Facade revenue if the formation of migraine pain, the bottom of the structure changes due to greater internal forces, therefore, constructed around the bottom reinforcement member should be strengthened. Where possible, the facade should be used repeatedly stepped adduction. Structural analysis should focus on whether the mutation displacement inspection structure, structure stiffness along the height of the spread or without mutations alter the effect of whether the structure is controlled within a reasonable range.
2) One-piece construction joints and surrounding should be used to calculate the elastic plate, connected to the main body should adopt the weak link (eg: hinged), it should be possible to reduce the weight and priority should be constructed of steel. Seismic level connected with the main body and the adjacent structural members should raise the level of adoption.
3) open a large hole in the facade focus on strengthening the hole corners and edges around the hole to prevent cracking in the hole angle when a small earthquake.
4) For the cantilevered structure, the design should consider the vertical seismic action. The quality of the upper structure cantilevered structure is large, too large to change the moment of inertia, if there is quality migraine pain, it will have a serious effect change, the design should be avoided.
5) with a conversion layer structure, the upper and lower body as much as possible is arranged through a series of vertical structure, and down through the core tube should try to strengthen the lower body structure stiffness, weakened upper body structure stiffness, take measures to control the conversion layer up and down the equivalent stiffness ratio, increasing the proportion of the pillars bear the seismic shear box, improving ductility and seismic capacity of the box support layer. Can reduce the stiffness of the upper layers (such as partial use of short pier shear wall), lower than the equivalent stiffness and down conversion layer. Conversion layer, the greater the impact of higher modes, conversion layer between the upper and lower internal forces of mutation and drift more obvious, therefore, should be strictly controlled to set the height conversion layer.
6) the large multi-tower chassis, the design should consider increasing the carrying capacity of the chassis to prevent construction in the bottom of the first yield. Connecting the tower podium roof stiffness should be increased to ensure that the bottom of the skirt can bring together the upper part of the tower vibration. But the bottom will result in the strengthening of the weak layer shift that increases the displacement of the upper structure, which should be a good grasp of the bearing capacity of the strengthened measures to improve the chassis. To strengthen the weak parts of the tower were designed, the layer should be whole column stirrup high encryption, stirrups diameter increased, the level of shear reinforcement is also appropriate to strengthen.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 伊人射| 久久国产三级精品| 曰批免费视频| 99av在线播放| 日韩视频网| 久久精品国产影库免费看| 久久一区不卡中文字幕| 九九在线精品视频播放| 三级性生活片| 美女被躁嗷嗷叫免费视频| 久久99国产精品| 2021国产情侣真实露脸在线| 18到20女人一级毛片| 扒开双腿粉嫩流白浆| 日韩推理片免费观看| 老色批在线播放视频网站免费| 九九热精品在线视频| 久久99国产精品免费观看| 99热在线精品免费播放6| 孕妇性猛交xxxxxhd| 欧美黑人巨大xxoo| 男人都懂的网址在线看片| 久久网页| 538这里有精品视频4| 范冰冰一级做a爰片久久毛片| 两个人看的www在线观看| 最新老头与老头同性视频| 看免费5xxaaa毛片| 久久免费大片| 日韩精品视频免费观看| 九九视频免费看| 青青岛社区| 在线精品视频免费观看| 麻豆网在线观看免费完整版| 91精品视频网站| 8090在线观看免费观看| 欧美中文在线视频| 99久久精品男女性高爱| 福利视频欧美一区二区三区| 一级特黄性色生活片| 超能特工小说|