1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:4478

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久久精品国产四虎影视| 久久精品国产99国产| 麻豆tv破解网址| 免费在线日韩| 永久免费毛片在线播放| 乖女小喜的奶水| 久久伊人网视频| 91漫画成长人安装| 明里柚在线观看| 曰批全过程又爽又大又黄| 97se亚洲综合在线韩国专区福利| pregnant孕妇xxx| 97dyy在线观看手机版| 麻豆tv破解网址| 色狠狠一区二区三区香蕉蜜桃| 日韩特黄特色大片免费视频| 免费观看成人羞羞视频软件| 99成人在线| 东北小伙gayxxxxx| 牛牛碰在线视频| 日本理论片午午伦夜理片2021| ts人妖国产精品| 亲爱的客栈第一季| 欧美日韩在线视频专区免费| 免费看亚洲| tom影院最新永久入口2020| yw193.c㎝国产在线播放| 色久综合在线| www.色94色.com| 毛片24种姿势无遮无栏| 99久久这里只精品国产免费| 免费在线观看的视频| 催眠性指导1~6全樱花动漫| 中文字日产幕码一二区色哟哟| 久久免| bl双性调教| 日产精品卡二卡三卡四卡乱码视频| 一区二区不卡免费视频| 日韩亚洲欧美在线爱色| 调教大佬| 欧美色人阁|