www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Guangzhou Steel says:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.huihuitaotao.cn

Guangzhou Steel says:

Time:[2015-7-4]  Hits:4182

Guangzhou Steel says: "The construction quality inspection norms steel works' quality requirements and inspection provisions

(1) Guangzhou Steel Steel: The steel is one of the following conditions should be carried out sampling re-examination, re-examination of its results should be in line with national commodity specifications and design requirements: imported steel; steel mixed batch; thickness equal to or greater than 40mm, and slab design performance requirements.
Inspection reports of high strength large hexagon head bolts convergence deputy and vice torsional shear strength bolts factory should join with me respectively with the tightening torque coefficient and axial force (pre-tension) to: (2) convergence with the fastening member specification.
(3) Guangzhou Steel Engineering steel welding: carbon steel should be cooled to ambient temperature in the cold, low-alloy structural steel welding should end after 24h, conduct inspection of welds.
(4) Guangzhou Steel Fasteners convergence projects: Normal bolt when the bolt as a permanent link, when the design requirements or II statement of their mass, should be a minimum tensile load of the bolt physical reinspection. A convergence of high strength bolts, bolts should be separately produced and device unit for anti-slip friction coefficient test and retest the surface. 2 high-strength hexagon head bolts screwed convergence deputy final end 1h after the final screwing torque check should be carried out within 48h. 3 deputy final convergence of high strength bolts screwed threaded bolts exposed should be 2 to 3 buttons, which allow 10% of threaded bolts to reveal a button or 4 button.
(5) steel member assembly works: Cranes and crane truss girder should Deflection.
(6) The single steel apparatus engineering: all vertical single steel main structure of promised deviation should be consistent H / 1000, and not greater than 25.0; all the twists and turns of the promised plane deviation should be consistent L / 1500, and not greater than 25.0. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久一区不卡中文字幕| 男插女阴道| 巨黄网站| 99久久国产综合精品成人影院| 伊人精品视频在线| 777黄色片| 98视频在线观看| 欧美亚洲国产人成aaa| 日本一区精品久久久久影院| 久久99精品久久久久久国产人妖| 美团外卖37分钟做0video| 一级一黄在线观看视频免费| 美国十次欧洲在线黑人| 91制服丝袜| xxxxxx国产对白| 69堂免费视频精品| 99re热在线观看| 久久只这里是精品66| 2018久久久国产精品| 欧美老幼欢| 久久这里一区二区精品| 老师扒开尿口男生摸尿口| 在线欧美视频免费观看国产| 免费香蕉依人在线视频久| 久久精品免费观看| 这里只有精品视频在线| 久久综合免费视频| 欧美亚洲国产精品| 就色干综合| 69日本xxxxxxxxx29| 曰批免费视频是看40分钟| 中文永久免费观看网站| 美女打开双腿扒开屁股男生| 欧美一区二区精品| 男人j桶进女人p| 99精选视频| 久久一卡二卡| 被黑人插| 日本一区二区不卡视频| 成人精品视频在线观看播放| 又粗又大的机巴好爽视频视频|