Guangzhou Steel teach you: Steel Construction Safety Control handle Exploration

Time:[2015-7-8]  Hits:4832

Guangzhou Steel teach you: Steel Construction Safety Control handle Exploration

With the development of society, the steel works from an economic, practical, seismic, may increasingly being recognized in the use and so on, along with the increase in steel works, steel in construction, production safety questions increasingly The more prominent. Steel Construction site safety handle though complex, but as long as we can for the main part of the construction process to strengthen the control and view, so fine, standardization handle, I believe we will be able to ensure the smooth construction of production, orderly and safe conduct . Guangzhou Steel
First, limb, hole, high work protection questions Analysis and Research
1, the pressure plate sequentially laying, reduce limb, the hole generating pressure plate laying steps rubato, adjustment, riveted, laying order starting from the side of the starting point should be laid to the surrounding continuous, that reduce limb, hole generation also eliminates the safety channel (the main beams and pillars of the seam welding, weld appearance processing, ultrasonic testing, several processes up paint work, only in the middle of each of the axes laid together by two scaffold boards makes up the secure channel) laying process. Before laying work should first lay hanging over the bottom layer of the pressure plate level safety net, rubato, adjustment should wear seatbelts, Staking should promptly adjust the pressure plate riveted good good, requiring plank and riveting synchronized springboard not leak riveting or staking, riveting prevent leakage phenomenon occurs apron.
2, limb, hole protection. Plane or on the ground floor of the elevator shaft on the periphery of tube wells and the floor and sides of the hole grew to 1.5m periphery with a height of 1.2m scaffolding erection of protective railings, entrance hanged retardant safety net level. Railing plug located retardant Fine Mesh Legislative Network. Length was longer than 1.5m hole, lift wellhead, should be changed every two hanged retardant safety net level (ground floor flat on the ground covered with flame retardant online Dense mesh safety net). Hole, limb protection to ensure the safety of staff, the hole in the flat screen acts to prevent injuries to the upper material fall lower personnel role. Guangzhou Steel
3, the height of the protective measures work: First Parachute. To prevent falls, the operator during the height of work, it is necessary to use seat belts. Since the steel construction at a large range of activities, seat belt use is generally very difficult to meet the construction requirements, should use safety belts with a speed difference from the controller (also known as anti-dropping speed difference or anti-dropping device or buffer). When lifting steel columns and apparatus, in order to ensure that workers in a safe state by removing the hoisting rope, the hook by hanging ropes at a height determined according to the site, for hanging seat belt safety catch. When people climb the steel ladder, we use self-locking device fall solve steel ladder without maintenance questions. Use self-locking device should pay attention not hold against; when people climb, self-locking device with construction workers always counterparts. It is necessary to seat belt hanging on the hook safety catch to prevent fall incidents. Second, beams, safety rope hanging on steel columns. After more than two fixed solid steel columns, it is necessary to set up safety rope pull (or coarse coir rope) in order to fasten the seat belt hanging. Φ6mm rope hanging on steel beams, suspension height 1.2m, erected at intervals of not less than 1.2m 3m high 70mm × 70mm × 7mm used to support the safety rope, and the use of baskets bolt tensioning safety rope, safety rope to prevent long cause fail-safe. When workers walking on the beam, with the necessary security safety ropes hanging. Third, the steel ladder setting. Temporary lifting with ladders, choose 70mm × 70mm × 7mm do ladder support, the use of M14 bolts angle is fixed on steel columns, use 40mm × 4mm flat steel ladder handrails do with a 14-round do stepladder, ladder width should not be less than 40cm, it is necessary to link up with steel columns solid, stable, can not shake. Fourth, operating platforms. When the steel beams and support equipment, the main steel beams hung site safety rope, they will hang in a protective belt rope walking. Steel columns segmenting means. Docking, when the bolt, in order to ensure safe operation of the workers, at a distance of 1.2m at the top section of the steel column capitals erected platform. Site construction schedule based on the number of platforms to determine and ensure the normal turnover, does not affect the lifting work. Setting means operating platform for welders build a good working environment, to ensure the safe operation of the welder. The platform disassembly convenient, safe and reliable, to steel columns docking device, proofreading, weld appearance processing, ultrasonic testing and other production processes provides a safety guarantee.
Second, the material lifting, hoisting questions Analysis and Research
1, means the use of tools such as a torque wrench, crowbar, grinder, etc. should be used to maintain security rope to prevent falling. Readily with bolts and gaskets should be placed in the tool bag.
2, the construction work of all objects that could fall, should be removed or to be fixed.
3, in the high altitude cutting gas cutting or welding, approach should be taken to prevent the cut metal, bead or sparks falling wounding.
4, in the process of lifting and devices, the first view the rigging, rope, hook is solid, you want to choose a suitable hanging points before lifting, if found unsafe condition should immediately stop the construction and to the relevant personnel.
Third, Hot Work Analysis and Research
1, according with the requirements of the two groups when the flare fire extinguisher, let someone see the fire, then use the bucket underneath spark.
2, oil can not hand contact with oxygen bottles, to prevent the crane or other mechanical oil fell on the oxygen cylinder.
3, oxygen and acetylene bottles have the necessary standards placed above the cylinders set the isolation means, to prevent cross-ignited gas cylinders working. If necessary, the use of acetylene bottle with anti-tempering device, strict implementation of electrical welder safety procedures.
4, welders role Basket hang provided on the main beam wing pendant. Welding operator seat belt safety rope hung, you can rest assured welding. This hanging basket hanging demolition convenient, safe, reliable, versatile, high-strength bolts it to a final twist, weld appearance processing, ultrasonic testing and other production processes provides a safety guarantee.
5, then the use of spark fighting. To prevent the welding sparks produced by cutting and fire incidents caused by scalding incidents, it is necessary to set up high-altitude Welding sparks fight then, using rockwool fire-retardant material inscribed spark fighting then melt beads, bead prevent splashing out again energize plate .
Fourth, the steel unit construction approach to security analysis and other research
Strict implementation of safety devices to handle system of steel construction and safety procedures, standards, criteria, and do the security approach, strict "Sambo, four" protection. Strict implementation of the provisions of the Security of electricity. Working at Height Safety erection of scaffolding, safety barriers and safety nets for protection, the staff necessary to wear a seat belt. Lifting steel unit construction work area should be located cordon, as a clear sign, and let someone responsible. In addition to the safety rope hanging on steel beams, steel columns, the limb should protect not kept pace with the limb in the floor, the hole set cordon of red and white, and set up warning signs in the limb at the floor (height work it is necessary to hang your seat belt or safety slogans, etc.). Hoisting prohibit non-construction personnel into or through the lifting area. Trial before the formal lifting crane to see the work of lifting equipment, ropes, anchor points. Recognition is correct, before the official lifting. Smooth lifting action, when more than one hoist work together, start and stop the action to be coordinated together, preventing workpiece vibration and swing. Time to find a place after being leveled, the workpiece can not unlock fixed before hoisting rigging. Finds it necessary to suspend the lifting process, it is necessary to take timely approach to security, and enhance on-site surveillance, troubleshooting as soon as possible, so that the workpiece can not be a long time in a suspended state. Participate steel construction lifting equipment necessary staff remained at their posts, obey the command to listen to the unified command, to not immediately clear signal should be asked to prohibit guesswork operation. Field staff positions necessary to have the necessary knowledge of lifting, and familiar with the relevant regulations, standards. The main component lifting should be done in the morning, the other lifting work should be carried out during the day to prevent work at night. Night work is necessary to have sufficient reliable lighting. Wind prohibited hoisting four and four above, rain and snow nor hoisting work. When hoisting steel apparatus construction, construction personnel shall not below the workpiece, the force rope with neighboring and other dangerous place to stay. No person shall when lifting or hoisting equipment lifting of the workpiece, along with special circumstances when it is necessary to lift, it is necessary to adopt reliable approach to security and the consent of the person in charge. Member hoisting should fitters, electricians responsible for the maintenance lifting machinery equipment, cut off the power to stop working should be ensured. All steel construction means construction workers it is necessary to wear helmets, high-altitude work necessary to have seat belts. Ban drink means the construction work and the production of steel whim, ban forced illegal operation.
V. Conclusion
As the steel project has the full in the construction process, the whole process around the clock in a highly dangerous state hole, limb, like high places; professional construction workers and engineering staff are at the height of the handle intensive interchange work environment ; the whole engineering components and construction equipment, materials and various safety features of the equipment and materials required special hoisting, lifting, etc., to the safety of its construction makes it difficult to handle. Therefore, strengthening the construction of steel safety handle is particularly important. Guangzhou Steel

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 聚四氟乙烯板,聚乙烯四氟板,防火布,廊坊王氏防火材料有限公司官网 | 球磨机配件_烘干机配件_回转窑配件_球磨机小齿轮_球磨机大齿轮-巩义市兴农机械制造公司 | 吉林市发布(雾凇融媒)官网| 西宁佳越信息科技发展有限公司-| 上饶市安信永辰会计师事务所有限公司| 聚四氟乙烯板,聚乙烯四氟板,防火布,廊坊王氏防火材料有限公司官网 | 太阳能路灯-高杆灯-景观灯-玉兰灯-中华灯-LED市电-庭院灯厂家-扬州汉威光电科技有限公司 | 郑州试驾场地_双超专业汽车试驾场地_郑州双超文化传播有限公司官方网站 | 潍坊沃林机械设备有限公司-牵引式风送果园打药机,悬挂式风送果园喷雾机,自走式果树喷药机,车载式风送远程喷雾机-潍坊沃林机械设备有限公司-牵引式风送果园打药机,悬挂式风送果园喷雾机,自走式果树喷药机,车载式风送远程喷雾机 潍坊网络推广,临沂360推广,东营360推广,枣庄360推广,潍坊网站建设,潍坊网络公司,潍坊360搜索,潍坊APP开发,潍坊360推广,潍坊360代理,潍坊点睛网络科技有限公司 | 山东向阳电子科技有限公司-多用户集中式电能表生产厂家,NB物联网水表,刷卡水电表生产厂家,泰安智能水电表价格 | 亚克力游泳池_透明/空中/无边泳池_别墅亚克力泳池设计生产厂家_瑞地格乐-深圳他拍档 | 小程序定制,小程序开发,北京小程序公司,网站建设,网站制作,北京网站建设,北京网站制作 | 湖南众一离心机股份有限公司_活塞推料离心机_沉降离心机_卧式刮刀离心机 | 山东汇河环保科技集团有限公司,水囊水袋,水罐,油囊,预压水袋,吊重水袋_山东汇河环保科技集团有限公司,水囊水袋,水罐,油囊,预压水袋,吊重水袋 | 木材粉碎机,木头木材破碎机,大型木材粉碎机多少钱一台-晨红木材粉碎机厂家-巩义市晨红机械厂 | 液压扳手-液压扭力扳手-电动扭矩扳手-气动扭力扳手-波霆机械(上海) | 上海宽带安装-上海宽带办理-400电话-包月电话-靓号 | 贴片磁胶电感_一体成型电感_贴片共模电感_广东精密龙电子科技有限公司 | 透明捆扎带_束带机打包带_束带机纸带_热封纸带机_上海得亿束带机包装材料有限公司 | 汽车配件加工生产模具-手板样品模型厂家-拓维模型 | 潍坊劲昊磁电科技有限公司-电磁除铁器,永磁除铁器,管道式除铁器,金属探测仪,磁滚筒,输送设备,给料设备,破碎设备 | 欧美日韩人妻精品一区二区三区_欧美成人精品欧美一级乱黄_亚洲欧美日韩高清一区二区三区_国产一级做a爰片久久毛片_日韩一级视频在线观看播放_精品一区二区三区免费毛片爱_完整观看高清秒播国内外精品资源 | 西安logo设计公司/西安包装设计公司/西安画册设计公司/西安广告公司/西安品牌设计公司/泰勒广告 雾度计-雾度仪-透光率测试仪-3nh品牌雾度仪生产厂家 | 南京货架|仓库货架|货架公司|仓储货架工厂批发定做-南京苏正科技实业公司 | 呕吐毒素快速检测仪-黄曲霉毒素测定仪-玉米赤霉烯酮快速检测卡-南京微测生物科技有限公司 | 铅板,防辐射铅板,医用铅板,保定美伦有色金属有限公司 | 江西省力速数控机械有限公司丨火花机丨龙门加工中心丨镜面火花机丨卧式加工中心 | 在线式风速仪_直读式流速仪-北京亚欧德鹏科技有限公司 | 木马交互设计研究中心 ,专注于用户体验与人机交互设计 - 首页 | 污水处理控制系统设计_plc编程控制柜_电气成套设备生产厂家_合肥鸿昇自动化 | 郑州宏大纺机有限公司 | 检重秤,液化气充装秤,滚筒电子秤,汽车衡厂家|上海越衡实业 | 新鲜水果 新鲜茶 - 甜啦啦官网| 小耳朵电源_安防监控电源|小耳朵官网|电源适配器|摄像机电源|开关电源|小耳朵监控电源 | 淮南网站制作丨淮南做网站丨淮南网络公司丨淮南哪家网络公司好丨淮南智讯网络 | 医用手摇病床,医用电动病床,康养手摇病床,康养电动病床-河北丁丁医疗器械有限公司 | 锌铝合金压铸-深圳压铸加工-铝挤压拉伸-压铸模具厂-广东誉格精密技术有限公司 | 碳减排领域专业技能人才培养工程综合服务平台 | 消防服_防化服_灭火防护服_消防装备生产厂家-泰州市华通消防装备厂有限公司 | 全自动沾锡机|端子机|剥线机|昆山市博科鑫源电子设备有限公司 | 移动CRM软件_SaaS CRM_crm管理软件系统_crm客户关系管理系统_销售管理软件-上海企能软件科技有限公司 |