Home > News > Steel Construction Safety Control handle inquiry
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.huihuitaotao.cn

Steel Construction Safety Control handle inquiry

Time:[2015-9-30]  Hits:5386

Guangzhou Steel News: Steel Construction Safety Control handle inquiry

Followed by the development of society, from the steel works is increasingly being recognized economic, practical, seismic, in use, etc., followed with an increase in steel works, steel in construction, production safety questions more outstanding. Steel Construction site safety handle though complicated, but as long as we can to strengthen the control and inspection for the main part of the construction process, so fine, standardized handling, I believe we will be able to ensure the smooth construction of production, orderly and safe conduct .

First, the question of protection analysis and research limb, hole, high job

1, in order to lay the pressure plate, reducing limb, the onset of the hole pressure plate laying steps rubato, adjustment, riveted, laying order starting from the side of the starting point should be laid to the surrounding continuous, that reduce limb, The attack also eliminates the need for hole secure channel (in the main beam and pillars of the seam welding, weld appearance processing, ultrasonic testing, several processes up paint job, only in the middle of each of the axes laid together by two scaffold boards makes up the secure channel) laying process. Before laying operations should be laid beforehand hanging over the bottom layer of the pressure plate level safety net, rubato, the adjustment should wear seatbelts, Staking should promptly adjust the pressure plate riveted good good, requiring plank and riveting synchronized springboard shall not leak or riveting riveting, riveting and prevent leakage episodes apron phenomenon.

2, limb, hole protection. Of the elevator shaft on the floor or ground plane, tube wells and the surrounding floor and sides of the hole grew to 1.5m surrounding scaffolding pipe erection height of 1.2m protective railings, entrance Hangings retardant safety net level. Railing plug located retardant Fine Mesh Legislative Network. Length was longer than 1.5m hole, lift wellhead, should be changed every two Hangings retardant safety net level (ground floor flat on the ground covered with fire-retardant medium dense mesh safety net). Hole, limb protection to ensure the safety of operating personnel, within the hole to prevent the upper level of the network played a material role of junior officers hurt falling. Guangzhou Steel

3, high job protection measures: First Parachute. To prevent falling height, the operator during the height job, it is necessary to use seat belts. Since the steel construction activity when a larger range, use an ordinary seat belt is difficult to meet the construction requirements, should be used with a speed difference from the controller (also known as anti-dropping speed difference or anti-dropping device or buffer) belts. When lifting steel columns and apparatus, in order to ensure that workers removed hoisting rope used in a safe state, by hanging hook safety rope at a height determined in accordance with the site, for hanging safety belt safety catch. When people climb steel ladder, use self-locking device Dropped solve unprotected steel ladder doubt. Self-locking device use should be careful not to hold against; when people climbing, self-locking device is always with fellow construction workers. It is necessary to seat belt hanging on the hook safety catch to prevent the onset of fall accidents. Second, beams, safety rope hanging on steel columns. After more than two fixed solid steel columns, it is necessary to set up safety rope pull (or coarse coir rope) in order to fasten the seat belt hanging. Φ6mm rope hanging on steel beams, suspension height 1.2m, erected at intervals of not less than 1.2m 3m high of 70mm × 70mm × 7mm used to support the safety rope, and the choice of basket bolt tensioning the safety rope, safety rope to prevent excessive due to security failures. When workers walking on the beam, with the necessary security safety ropes hanging. Third, the steel ladder setting. Temporary lifting with ladders, choose 70mm × 70mm × 7mm do ladder support, the use of M14 bolts angle is fixed on steel columns, use 40mm × 4mm flat steel ladder handrails do, do with a 14-round stepladder, ladder width should not be less than 40cm, it is necessary to connect with the steel columns solid, stable, can not shake. Fourth, operating platforms. When the steel beams and support devices, the main girder parts hanging rope security personnel will guard the seat belt hanging rope walking. Steel columns segmenting means. Docking, when the bolt, in order to ensure safe operation of the workers, in the first paragraph of the steel columns from 1.2m at the top of the column erected platform. Site construction schedule based on the number of platforms to determine and ensure the normal turnover, does not affect the lifting operations. Setting means operating platform for welders to create a good working environment, to ensure the safe operation of the welder. The platform disassembly convenient, safe and reliable, to steel columns docking device, calibration, weld appearance processing, ultrasonic testing and other processes to provide a safe production security.

Second, the material lifting, hoisting questions Analysis and Research

1, means the use of things such as a torque wrench, crowbar, grinder, etc. should be used in safety rope to prevent falling. Readily with bolts and gaskets should be placed in bags of stuff.

2, applied to all jobs in industry, perhaps falling objects should be removed or to be fixed.

3, in the high altitude cutting gas cutting or welding, should take measures to prevent cut metal, bead or sparks falling wounding.

4, in the process of lifting and means, first check the rigging, wire rope, hook is solid, you want to choose a suitable hanging points before lifting, if found unsafe should immediately suspend construction danger to the relevant personnel.

Third, Hot Work Analysis and Research

1, according to the requirements of the two groups with flare when effective fire extinguisher, let someone see the fire, then use spark bucket underneath.

2, oil can not hand contact with oxygen bottles, to prevent the crane or other mechanical oil fell on the oxygen cylinder.

3, oxygen and acetylene bottles necessary to regulate placed above the cylinders set quarantine measures to prevent the ignition of the gas cylinder when the cross-operation. It is necessary to have anti-tempering equipment, electrical welder strictly enforce safety rules when using acetylene bottles.

4, welding operations with Cradle hang provided on the main beam wing pendant. Welding operator seat belt safety rope hung, you can rest assured welding. This hanging basket hanging demolition convenient, safe, reliable, versatile, high-strength bolts it to a final twist, weld appearance processing, ultrasonic testing and other processes to provide a safe production security.

5, then the use of spark fighting. In order to prevent accidents and fires caused by scalding attack sparks of welding and cutting, it is necessary to set up high-altitude welding sparks fight then, using rockwool fire-retardant materials inscribed spark fighting then melt beads, bead prevent splashing out again energize plate .

Fourth, the construction of steel structures means that other safety measures Analysis and Research

Strict implementation of safety devices handle steel construction systems and safety procedures, standards, norms, and do all the security measures to crack "Sambo, four" protection. Strict implementation of the provisions of the safe use of electricity. Erection of scaffolding aerial work safety, safety fence and safety nets for protection, workers necessary to wear seat belts. Steel construction lifting equipment work area should be set up alert line, as a clear sign, and let someone serve. In addition to the safety rope hanging on steel beams, steel columns outside, in limb protection in the floor when not kept pace with the limb, the hole to set the alert line of red and white, and set up warning signs in the limb at the floor (height operation it is necessary to hang up the seat belt or safety slogans, etc.). Non-construction personnel hoisting operation is prohibited into or through lifting area. Trial before the formal lifting cranes, lifting equipment inspection job situation, ropes, anchor points. After confirmation, before the official lifting. Smooth lifting action, when more than one hoist operation together, start aborted concerted action to prevent the workpiece vibration and swing. After leveling the time to find a positive place, the work can not unlock fixed before hoisting rigging. Finds it necessary to suspend the lifting process, it is necessary to take safety measures, and enhance on-site guard, troubleshooting as soon as possible, so that the workpiece can not be a long time in a suspended state. Participate steel apparatus construction hoisting personnel necessary to stick to their posts, obey the command to listen to the unified command, to not immediately clear signal should ask, non guesswork operation. Field staff positions necessary to have the necessary knowledge of lifting, and familiar with the relevant regulations and codes. The main component lifting should be done in the morning, the other lifting operations should be carried out during the day, at night to prevent the job. Night work is necessary to have adequate and reliable lighting. Wind prohibited in four and four more were lifting, rain and snow can not be carried out lifting operations. When hoisting steel apparatus construction, construction workers below the workpiece can not, force a nearby rope and other dangerous places to stay. No person shall when lifting or hoisting equipment lifting of the workpiece, along with special circumstances when it is necessary to lift, it is necessary to adopt reliable safety measures and approved by the relevant responsible person. Member hoisting should fitters, electricians and other lifting equipment as protection equipment, cut off the power to suspend operations should ensure. All steel construction means construction workers necessary to wear safety helmets, aerial work necessary to have seat belts. Do not drink and steel industry means jobs and production facilities whim, forced prohibited illegal operation. Guangzhou Steel

V. Conclusion

As the steel project has the full in the construction process, the whole process around the clock in a highly dangerous state of the hole, limb, like height operation; professional construction workers and engineering staff are at the height of the handle intensive interchange work environment ; the whole engineering components and construction equipment, materials and various safety features of the equipment and materials required special hoisting, lifting, etc., to bring it difficult to handle the construction safety. Therefore, strengthening the construction of steel safety handle is particularly important.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 智能访客系统 - 来访登记系统_微信预约系统_人员出入管理系统_访客机_人脸识别系统门禁闸机 | 圣瞳智巡_大模型工业巡检解决方案|【圣瞳科技】 | 清尼龙滤膜-清洁度检测设备-清洁度分析仪-清洁度萃取机-优昂(百科) | 赛车微信群二维码平台下载【找群网zhaoqun5.com】 | 桥梁伸缩缝_桥梁伸缩缝厂家_桥梁伸缩缝价格-衡水淞皓路桥养护工程有限公司 | 吉安仁济医院「官网」吉安男科医院-吉安仁济男科医院靠谱吗-男性专科医院 | 江苏广分检测技术有限公司、电力安全工具检测、苏州绝缘工具检测、昆山电力安全工具检测-广分检测技术(苏州)有限公司 | 津成电线电缆价格,天津津成线缆,津成线缆销售电话,天津津成线缆批发电话-天津市津成电线电缆有限公司 | 上海垃圾房,简易成品环保垃圾房,小区室外垃圾房,上海翼亭智能垃圾房厂家 | 社会百态,七仙女思春完整版免费高清电影引发的思考 | 上海礼品公司_定制商务礼品_促销礼品_福利礼品_创意礼品_上海普田商贸有限公司 | 中标通国际认证(深圳)有限公司-知识产权管理体系认证-湖北知识产权贯标 | 汽车智能防撞系统_智能刹车_77G毫米波雷达_麒云科技疲劳驾驶预警 | 商用厨具|商用厨房设备|商用电磁灶-鲁宝厨业官方网站 | 合肥年会策划-合肥开业庆典公司-合肥会务活动礼仪公司-合肥展台搭建/音响租赁公司 [七色海] | 宣城安安橡塑有限责任公司 | 秦皇岛图成玻璃_横切机,琴键落板,堆垛机械手,玻璃钢化设备,掰边机,铺纸机,水平堆垛机+超大板堆垛机,纵掰纵分,下片机,冷端优化切割 | 廊坊微信营销,廊坊小程序开发,廊坊APP开发(安卓_苹果ios开发),微信朋友圈广告,百度推广,廊坊网络公司品牌服务商-河北盛秋网络科技有限公司 | 橡胶粉碎机_轮胎粉碎机_橡胶切条机_橡胶粉碎机价格_河南鑫世昌机械制造有限公司 | 清扫器-聚氨酯清扫器-合金清扫器-四连杆自动纠偏-机械纠偏-锥辊纠偏-衡水涌泉机械科技有限公司 | 湿电电源,静电除尘电源,电捕焦电源-山东仕瑞电气科技有限公司 | 直冷式块冰机|片冰机|块冰机|制冰机厂家|深圳市冰之星制冷科技有限公司 | 转轮除湿机_工业除湿机_恒温恒湿机-铂克除湿机厂家 | 卷帘门,防火卷帘,快速门,硬质快速门,提升门,伸缩门,堆积门,车库门维修-烟台捷曼门业有限公司 | 碳化硅脱硫喷嘴,碳化硅烧嘴套,碳化硅耐磨衬套-潍坊致达特种陶瓷有限公司 | 皮带清扫器-皮带聚氨酯合金空段输送带清扫器刮刀厂家-衡水格锐特机械科技有限公司 | 激光切割加工,佛山激光切割加工,钣金加工,机加工-佛山市华锐达金属制品有限公司 | 河北瑞峰医疗-河北护理床-河北医用病床-河北养老院护理床-河北护理床厂家-河北病床厂家-河北瑞峰医疗 | 江西食用油批发_江西食用油厂家_菜籽油厂家-江西省家泰粮油科技有限公司 | 南湖人才网_南湖招聘网_求职找工作平台 | 石家庄华龙鼎电动门,石家庄电动门电话,石家庄电动门配件,石家庄电动门维修电话,石家庄电动门安装电话,石家庄华龙电动门 | 智能化解决方案 智能家居 家庭影院 灯光音箱 会议室报告厅 剧场剧院 指挥中心 大数据中心_沈阳天哲科技有限公司 | 金坛区成辉仪器厂-精密増力电动搅拌器,石英亚沸蒸馏水器- | 一体式电磁流量计_分体式电磁流量计_卫生级电磁流量计_卫生型电磁流量计_电池供电电磁流量计_卡箍式电磁流量计_废水电磁流量计_德克森仪表(淮安)有限公司官网 | 宁波华路德|交通信号灯|交通信号机|太阳能信号灯|交通警示灯|交通信号灯厂家 | 天津韬艺科技有限公司,天津网站建设公司,天津网站设计公司,品牌网站策划公司 | 金相切割机-金相磨抛机-显微/维氏/布氏/洛氏硬度计-自准直仪-金相显微镜-万能材料试验机-清洁度检测仪-淋雨试验机-上海中研精密仪器制造有限公司 | 河南新华电脑学院-郑州电脑学校-计算机培训学校-郑州新华电脑学院 | 兰舍硅藻泥 -- 深圳硅藻泥|深圳兰舍硅藻泥|深圳硅藻泥品牌|深圳硅藻泥价格|深圳硅藻泥厂家|深圳硅藻泥施工| | 潍坊亿宏重工机械有限公司,破碎机,高性能立磨机,颚式破碎机,锤式破碎机反击式破碎机,重锤式破碎机,高性能反击式破碎机,圆锥式破碎机,给料机系列,链板给料机系列,简易给料机系列,振动给料机 | 小程序开发,网站建设,APP开发,商城系统开发,社区团购系统开发,区块链溯源,互联网资质办理-软多信息技术有限公司_河南软多信息技术有限公司 |