Steel supervision next station control points

Time:[2016-1-20]  Hits:4360

Guangzhou Steel teach you: Steel supervision next station control points

(1) Before the construction supervisors to deal with the approach of materials (steel, high-strength bolts) check, approach the material must have factory quality certificate and sampling site is intended for use after passing inspection, welding rod, wire, flux should meet the requirements .
(2) Check the installation of the production staff of technical welder qualification certificate, so certificates.
Welding income margin, cutting and other allowance and column in compression load deformation value (3) the material according to process requirements, making installation reserved.
(4) member when assembled, to prevent distortions member bagging inaccurate.
(5) welding to adhere to a thickness greater than 50mm carbon structural steel and low-alloy structural steel before welding larger than 36mm preheat hot after welding performed.
(6) the quality of the weld seam inspection in addition to dimensions, surface quality inspection, but also check the internal weld defects, according to the requirements of the drawing to determine the grade of weld quality grade and defects NDT.
(7) Before installing the column, a detailed examination of the relative position of the axis of the anchor bolts and offset.
(8) a single vertical column of steel columns, with one column capitals elevation sections deviations on the wrong port value under the column connection.
(9) Guangzhou Steel steel member during product delivery, product quality must have approval and certification, in order to be sent to the installation site, after installation departments for product acceptance Engineer focused on installation and connection components in place to check on the situation and members steel members connected with the concrete peg holes reservation wear bars.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 美女扒开内| 日韩成人免费视频播放| 男人j进女人屁股免费看| 日韩伊人| md传媒视频在线观看沈芯语| 日韩美女乱淫aaa高清视频在线| xx小younv超嫩| 亚洲在线成色综合网站| 久久午夜激情| japonensisfes东北| 在线色网址| 中国老妇性xxxxhd| ass日本东热大杂交pics| 97成人免费视频| 九九热免费视频| 九九热国产精品视频| 12至16末成年毛片高清| 白丝美女被艹| 大象传媒在线观看| 稚嫩挤奶h调教h| 母狗是怎样操熟的| 久一视频在线观看| free印度性xxxxhd| 大肥女ass樱桃| 99免费在线观看视频| 女友闺蜜真湿夹得我好爽小说| 可不可以日本免费完整版| 日本搞逼视频| 游侠索罗星球大战外传高清在线观看| 久久亚洲国产最新网站| pregnant woman性孕妇| 林志玲疯狂迎合呻吟小说| haose16在线永久免费| 日韩不卡一二三区| 亚洲综合网站| 999精品影视在线观看| 久久啪久久这里有精品第10| 人妖性喷潮xxxx| 欧美在线看欧美视频免费网站| 欧美亚洲人成网站在线观看刚交| 2019夜夜|