raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4437

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 18成网站www在线观看| 女同调教重口女虐女| 怡红院在线视频全部观看| 热久久99影院| 日韩字幕一中文在线综合| 一本到在线观看视频不卡| 91精品欧美产品免费观看| 最新精品在线视频| 色老板免费观看在线播放| 18to19videos性欧美| 一级片一区| 成人影院免费www| 夫妻成长日记在线| 成人欧美一区二区三区黑人免费| 高清欧美性狂猛bbbbbbxxxx| 菲律宾天堂的触摸| 在线观看mv的免费网站| 欧美无极品15p| 成人网18网站| 中国成人在线视频| 日本一区二区在线看| a级黄色免费| 免费观看又黄又刺激的视频网站| 浪潮a∨1区| 欧美人善z0zo性伦交高清| caopen在线| 热久久国产欧美一区二区精品| 久久精品亚洲一区二区三区浴池| 久久综合婷婷| 波多野结衣中文视频| 2021在线永久免费视频| 看强人物免费漫画入口免费| 亚洲综合15p| 91av手机在线观看| 91www在线观看| 日韩在线视频免费看| 久久精品影院一区二区三区| 美女被男人c| 日本成人不卡视频| 91w乳液78w78w乳液| 69女poren18女|