www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Steel Engineering strength bolted connection inspection requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.huihuitaotao.cn

Steel Engineering strength bolted connection inspection requirements

Time:[2016-3-9]  Hits:4062

Steel Engineering strength bolted connection inspection requirements

High strength bolt friction surface should be smooth, dry, iron oxide surface may not have skin, burr, burr, paint and oil, remove loose rust with a wire brush along the direction perpendicular to the force. And shall not be installed in the rain.

Use a torque wrench should be required to calibrate torque wrench set to respond before the class to be checked before using.

Guangzhou Steel in strict accordance to the surrounding extended from the middle of the order, the early implementation of twist, twist the end of the construction technology program, non-step method of direct final twist. A high-strength bolted joint on bolt group should be central to start the installation, one by one tightening, tighten it again each application are different colors of paint be marked to prevent leakage twist. High strength bolts fastening parts order from stiffness to unfettered free end be carried out from the middle to the edges, so that the adhesiveness between the plates.

Should be free to penetrate the high-strength bolts bolt hole. When reaming, iron may not fall into lamellar. Reaming shall not exceed 1/3 of one joint bolt hole, reaming diameter of not greater than 2 mm aperture together. High strength bolts were forbidden to use gas cutting reaming work.

Guangzhou Steel long-term storage of more than six months or improper care caused by rusty bolts and contaminated dirt, may alter the performance of the torque coefficient or bolts of high strength bolts, as the case should be cleaned, rust and lubrication process, and the torque coefficient or bolt pre-tension test, qualified before use.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 欧美视频一区二区三区精品| 男女性生活黄色片| 在线欧美亚洲| 日本 毛片基地-亚洲| xxxx日本护士| 最新日本中文字幕| www色中色| 欧美在线高清视频播放免费| 一个人看的免费高清www在线观看| 91成人午夜性a一级毛片| 女色网| 欧美猛男roomgay| 一级成人毛片免费观看| 久久综合九色综合欧洲色| 日本高清在线中文字幕网| 在线天天干| 被老师射在里面真爽| 高清欧美性狂猛bbbbbbxxxx| 欧美成人免费全网站大片| 成人免费视频无遮挡在线看| 一个人看的视频观看免费高清| 日本护士野外奶水hd| 99在线观看精品视频| 91麻豆果冻天美精东蜜桃传媒| 欧美卡1卡2卡三卡网站入口| 在线高清视频大全| xxxxx做受大片视频免费| 女人做爰呻吟在线看网站| 久久精品国波多野结衣| 一区二区在线观看高清| 久久综合精品不卡一区二区| chinese456老妇人gay| jul-179在线中文字幕| 亚洲综合区小说区激情区噜噜| 一级欧美在线的视频| 91一区二区三区| 91精品国产露脸在线观看| 玖玖热99这里只有精品| 97dyy在线观看手机版| gogo人体双人男女做爰69| footjobvideos欧美高清|