Housing Construction - large steel structure construction technology of installation of slip

Time:[2016-3-19]  Hits:4049

Guangzhou Steel tells you: Housing Construction - large steel structure construction technology of installation of slip

Guangzhou Steel News 1. Main content
Computer-controlled mass jacking and lifting technology is an advanced steel structure and installation of large equipment technology, which combines mechanical, hydraulic, computer control, sensor monitoring technology, and technology to solve the traditional hoisting of large crane and lifting machinery height, weight lifting, structure, surface contact, job sites and other fields insurmountable problems. With this construction technique is safe and reliable, mature technology, advanced technology, significant economic benefits. The technology uses a "flexible strand bearing, hydraulic cylinder cluster, computer-controlled synchronous lifting" principle. When lifting or jacking construction precisely controlled by computer at various points synchronization.
2. Technical Specifications
Lifting or jacking determine the program, you must also consider the load-bearing structure (permanent or temporary) and the lifting device itself or the steel strength, stiffness and stability. To make the overall force structure under construction state of stress performance checking and calculating all, to mention points with jack. For construction of foundation and support structure or the lower should be checking the bearing capacity and the overall stability, guaranteed under the most unfavorable conditions sufficient security. Sync value of each action point should be selected by calculating the reasonable construction.
Ways to enhance the principle of choice, one seeks to reduce the height of the load-bearing structure, to ensure its stability, the second is to ensure that the steel structure or equipment was promoted stability and security in place in ascension. Determine lifting points of the number and location of the basic principles are: First, to ensure that equipment is lifted steel or stability during the lift of. In ensuring the safety and quality of the premise, to minimize the lifting points. Enhance the carrying capacity of the device itself meet the design requirements. Lifting equipment selection principles are: to meet the upgrade requirements of the force, compact, durable, easy maintenance, meet the engineering needs (such as stroke, enhance the speed, security, etc.).
Main technical characteristics 3. Slip law
Sliding method has broad applicability. In addition to one-way truss, the structural rigidity for the smaller two-way truss or truss by adding support points (decrease span), increase the width of the assembly platform, while increasing the number of truss assembly on the platform, the same method can be used to install slip.
Slip propulsion device can be computer-controlled synchronized hydraulic crawler. High degree of automation equipment, flexible operation, safety, and high reliability, using a wide versatility.
4. The main technical measures slip law
1) preparation of construction plan
Preparation of construction plan to guide the construction, comprising: a sliding unit division, and slide assembly platform erection, assembly height, traction system, points slip or cumulative slip, off the shelf in place, construction monitoring, contingency plans.
2) high-altitude platform assembly and erection truss assembly.
3) Set the sliding track.
4) Install the synchronization slip system.
5) stress and strain monitoring: to ensure the construction in a controlled state.
5. Scope
(1) sports stadiums, theaters, hangars, steel bridge (gallery) and other large span roof and steel structure assembled with a ground conditions, when there are better peripheral support conditions, and can be used to enhance the overall lifting technology.
(2) enhancing the overall steel tower antenna masts, power station boilers and other ultra member.
Enhancing the overall (3) large gantry crane girder, boilers and other large equipment.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久国产精品一国产精品金尊| v天堂一卡2卡三卡4卡乱码| 18to19videos性欧美| 欧美α片无限看在线观看免费| 成年女性撤尿毛茸茸| 尤物校花闺蜜呻吟| 欧美一区二区三区美人| 欧美曰韩一区二区三区| 一级毛片野战树林老女人| 草天堂| 50老熟败火自拍| 美女和男朋友在一起差差差| 成人国产精品免费视频不卡| 日本人做真爱高清视频在线看免费| 一个人看的www视频在线观看| 欧美一级成人影院免费的| 欧洲色吧| 毛片免费观看网址| 在线亚洲欧洲国产综合777| 2020国产精品| 日本护士xxxxx高清免费| 欧美日韩免费一区二区三区| 乱人伦中文字幕在线不卡网站| 男人天堂网在线观看| 欧美精品区| 欧美在线天堂| 青草免费观看| 日本免费高清视频| 能免费看动漫情侣网站| 日韩欧美精品综合一区二区三区| 97国产超级碰碰在线视频| 美女袖珍人bbwwbbww视频| 欧美另类综合| 一个人看的视频在线www高清| 超级乱淫伦小说全集麻麻| 色老板在线永久免费视频凹凸| 女人张开大腿让男人桶| good日本网站三级| 狼狼狼色精品视频在线观看| 成人国产欧美精品一区二区| 中文字幕三级在线不卡|