Large Steel Sliding Installation Technology of

Time:[2016-3-23]  Hits:3831

Large Steel Sliding Installation Technology of


1. Guangzhou Steel Main content
Computer-controlled mass jacking and lifting technology is an advanced steel structure and installation of large equipment technology, which combines mechanical, hydraulic, computer control, sensor monitoring technology, and technology to solve the traditional hoisting of large crane and lifting machinery height, weight lifting, structure, surface contact, job sites and other fields insurmountable problems. With this construction technique is safe and reliable, mature technology, advanced technology, significant economic benefits. The technology uses a "flexible strand bearing, hydraulic cylinder cluster, computer-controlled synchronous lifting" principle. When lifting or jacking construction precisely controlled by computer at various points synchronization.
2. Guangzhou Steel Technical Specifications
Lifting or jacking determine the program, you must also consider the load-bearing structure (permanent or temporary) and the lifting device itself or the steel strength, stiffness and stability. To make the overall force structure under construction state of stress performance checking and calculating all, to mention points with jack. For construction of foundation and support structure or the lower should be checking the bearing capacity and the overall stability, guaranteed under the most unfavorable conditions sufficient security. Sync value of each action point should be selected by calculating the reasonable construction.
Ways to enhance the principle of choice, one seeks to reduce the height of the load-bearing structure, to ensure its stability, the second is to ensure that the steel structure or equipment was promoted stability and security in place in ascension. Determine lifting points of the number and location of the basic principles are: First, to ensure that equipment is lifted steel or stability during the lift of. In ensuring the safety and quality of the premise, to minimize the lifting points. Enhance the carrying capacity of the device itself meet the design requirements. Lifting equipment selection principles are: to meet the upgrade requirements of the force, compact, durable, easy maintenance, meet the engineering needs (such as stroke, enhance the speed, security, etc.).
Main technical characteristics 3. Slip law
Sliding method has broad applicability. In addition to one-way truss, the structural rigidity for the smaller two-way truss or truss by adding support points (decrease span), increase the width of the assembly platform, while increasing the number of truss assembly on the platform, the same method can be used to install slip.
Slip propulsion device can be computer-controlled synchronized hydraulic crawler. High degree of automation equipment, flexible operation, safety, and high reliability, using a wide versatility.
4. The main technical measures slip law
1) preparation of Guangzhou Steel construction program
Preparation of construction plan to guide the construction, comprising: a sliding unit division, and slide assembly platform erection, assembly height, traction system, points slip or cumulative slip, off the shelf in place, construction monitoring, contingency plans.
2) high-altitude platform assembly and erection truss assembly.
3) Set the sliding track.
4) Install the synchronization slip system.
5) stress and strain monitoring: to ensure the construction in a controlled state.
5. Guangzhou Steel Scope
(1) sports stadiums, theaters, hangars, steel bridge (gallery) and other large span roof and steel structure assembled with a ground conditions, when there are better peripheral support conditions, and can be used to enhance the overall lifting technology.
(2) enhancing the overall steel tower antenna masts, power station boilers and other ultra member.
Enhancing the overall (3) large gantry crane girder, boilers and other large equipment.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久99国产综合精合精品| 青草社区在线观看| 99视频精品| 欧美精品久久久久久久久大尺度| 95精品视频| 一本大道香蕉大在线最新| 1717she国产精品免费视频| 高大肥臀老妇满足我小说| 俄罗斯老妇人a| 草莓视频成年人| 成人久久免费视频| freesex呦交6一12东| 在线影音先锋| 风间由美全部在线播放| 日本高清一级做a爱过程免费视频| 在线免费观看污视频| a亚洲va韩国va欧美va久久| 日本黄站| 久久99热只有频精品6不卡| 青苹果乐园完整版在线观看| 全亚洲最大的免费私人影剧院| 日韩欧美亚洲每的更新在线| 91麻豆果冻天美精东蜜桃传媒| 欧美xxxxx做受vr| 欧美巨大bbbb| poronovideos极度另类| aaa在线观看免费完整版| 久久天堂视频| 欧美一级视频精品观看| 俺来也俺去啦久久综合网| ⅹxxxx68日本老师hd| 动漫同人18av黄漫网站| 九九视频免费| 日日麻批的全部过程| 青青青视频自偷自拍视频1| 最猛91大神ben与女教师| 这里只有精品视频在线| 久久亚洲精品无码| 久久精品国产亚洲网址| 病美人折纸的小说全文免费阅读| 一本大道在线观看|