Guangzhou Steel curtain wall construction and process all-glass structures

Time:[2016-4-9]  Hits:4458

Guangzhou Steel curtain wall construction and process all-glass structures

 

 

Installation of Guangzhou Steel full glass curtain wall is more than one joint construction trades, a very complex process, and the operation also requires very fine, requires teamwork team. But it also has a close relationship with the construction schedule of other sub-projects. To make the construction and installation of steel curtain wall smoothly, the project must be based on the actual situation, compile the individual construction organization design, and confirmed by the general contracting unit.

Project started preparatory work
Technical data collection

On-site data collection and civil design of civil structure size measurements. Because there may be some fluctuation civil construction, the actual size is not always in line with the design drawings. Full glass curtain wall on the civil structures related to the higher size requirements. So before the site must be designed to measure, obtain first-hand information and data. And then to draw the curtain separating practical view of the requirements of owners. For door entrance of the site, also must make automatic revolving door, full glass door unit with the glass curtain wall on the door and the door of a reliable shut. But also need to meet requirements for the installation and maintenance of automatic revolving door.

Design and construction plan was finalized

Design and construction plan was finalized. When glass curtain wall design partition, in addition to considering a uniform aesthetic appearance, it should also be taken to minimize the glass specification models. Because all kinds of outdoor architectural design are not the same, to have a large outdoor canopy, driving ramps and other projects, more attention should coordinate the overall construction schedule and order and prevent the construction and other outdoor facilities, the impact of walking crane and glass curtain wall installation. Before the formal construction, but also to deal with the scope of the construction site be flattened infill, good site clean-up, to ensure the smooth running crane.

Prepare materials and mechanical equipment
The main material quality inspection

(1) glass sizes are correct, with particular attention to check the glass during storage and transportation process, whether the damage found to have cracks, chipping the glass must not be installed, and shall immediately notify the reprocessing plant supplement soon as possible.

Material (2) structural metal member meets the design requirements, whether straight member, processed size, accuracy, hole location meets the design requirements. Good anti-rust paint to brush first, to all the member number clearly marked.

 

The main construction equipment inspection

(1) glass lifting and transportation machinery and equipment inspection, especially for crane operating system and electric chuck performance checks.

(2) Check the performance of a variety of power and hand tools.

(3) embedded parts location and design of the position deviation should not exceed 20mm.

Scaffolding

Due to the different needs of the construction program, construction scaffolding structures must meet different requirements.

(1) discharge line and production load-bearing steel frame, should be set up on both sides of the glass curtain wall surface, to facilitate workers, such as welding and installation work at different positions.

(2) When installing the glass curtain wall should be built on the inside of the curtain wall. To facilitate the lifting obliquely inserted into the glass does not touch the scaffolding, but also make the upper and lower parts of the standing scaffolding workers can easily hold the hand sucker can assist crane glass exact place.

(3) the glass in place after dispensing and cleaning phase, then the need to build a separate row in the outdoor scaffolding, due to the large area of ​​continuous full glass curtain wall, unable to communicate with the outdoor scaffolding then pull the main structure, so pay special attention to the scaffolding support and stable, can land anchors, rope and pull with a bracing strut connection. Construction of each operation to be laying layer height scaffold boards, have a top rail, scaffold boards use wire fixation. In the construction and dismantling of the scaffolding to be extra careful not to throw down throw and steel fasteners from a height, to prevent damage to the glass.

 

Guangzhou Steel curtain wall installation
Guangzhou Steel curtain wall installation steps roughly as follows:

1. actinomycetes positioning;

2. The upper portion of the load-bearing steel structure installation;

3. The lower portion of the side frame and installation;

4. glass in place.

5. Note sealant;

6. Surface cleaning and inspection;

Maintenance and repair
At present, all-glass curtain wall maintenance and repair of the owners have not been enough attention. Now full glass curtain wall material used has a certain validity period should be observed regularly and maintained in normal use, so after Labor Exchange acceptance, and use of best developed curtain wall maintenance and repair program, and signed a contract with the company.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 龙淼环保-旋流-喷淋塔,高温布袋,脉冲布袋-单机-滤筒除尘器,活性炭吸附箱,催化燃烧设备,除尘器配件-沧州龙淼环保设备制造有限公司 | 网站建设|营销型网站|独立站搭建|外贸网站建设|wordpress独立站|小程序开发-?无双建站? | 青州东威机械有限公司,洗沙机,脱水筛、细沙回收机,淘金设备,洗石机,砂石分离机,筛沙机,采沙船,清淤船,破碎制砂机,海沙淡化设备 | 太阳能路灯生产厂家-郑州太阳能高杆灯价格-道路照明智能路灯-河南坤德照明 | 生物质蒸发器_燃气蒸发器_燃气锅炉价格|厂家直销-山东泰锅锅炉设备有限公司 | 温湿度记录仪_温度监控_冷链监控云平台_USB/PDF温度记录仪-深圳市鸿睿物联科技发展有限公司 | 图观 - 数字孪生 应用开发引擎 | 三维可视化 | 自动_链条式_电动推杆_电动开窗器厂家_山东鑫宏玺智能科技有限公司 | 呼吸家官网|肺功能检测仪生产厂家|国产肺功能仪知名品牌|肺功能检测仪|肺功能测试仪|婴幼儿肺功能仪|弥散残气肺功能仪|肺功能测试系统|广州红象医疗科技有限公司|便携式肺功能仪|大肺功能仪|呼吸康复一体机|儿童肺功能仪|肺活量计|医用简易肺功能仪|呼吸康复系统|肺功能仪|弥散肺功能仪(大肺)|便携式肺功能检测仪|肺康复|呼吸肌力测定肺功能仪|肺功能测定仪|呼吸神经肌肉刺激仪|便携式肺功能 | 长沙物流公司|湖南货物运输公司|长沙第三方物流公司-国联物流 湖南第三方物流专家 | 威海牙科,威海种植牙,威海人工种植牙-威海经济开发区姚晓艺口腔诊所 | 质保_天津光栅尺_机床光栅尺数显表-天津方韦仪器有限公司 | 全玻璃视镜人孔-卡箍组件-常压单臂梁人孔-温州华强流体设备有限公司 | 山东腾达源金属材料官网-耐磨板nm400,nm400耐磨钢板,nm500耐磨钢板切割,耐候板批发,高强板现货【价格】 | 浙江微龙科技-微通道工艺结合设备一站式解决方案-致力于连续流技术开发与产业化应用-助力传统医药化工行业转型升级 | 太原重卡叔叔运输有限公司-山西太原大件运输、太原物流公司、太原货运物流、太原大件运输、太原货运信息、长治物流公司、长治大件运输、晋城物流公司、晋城大件运输、忻州大件运输、朔州大件运输、阳泉大件运输、大同大件运输、吕梁大件运输、临汾大件运输、运城大件运城 | 原创软文新闻稿-网站SEO文章代写-征文演讲稿代笔-写作阁 | 济宁市泓世新型建材有限公司,山东ALC墙板,GRC轻质隔墙板,预制化粪池,复合墙板加工厂家 | 九江市东鸿气体有限公司| 专注全球电机测试-电机测试系统-AIP艾普【官网】 | 煤粉喷枪_高炉喷煤枪_陶瓷喷煤枪-北京耐默公司| 自复式过欠压保护器-上海能曼电气有限公司 | 氢能-燃料电池-电堆-中国氢能与燃料电池网企业最佳宣传推广平台 轻质隔墙板厂家-加气隔墙板_grc轻质隔墙板_空心实心复合隔墙板_水泥混凝土轻质隔墙板批发价格 | 扭力扳手_扭力扳手检定仪_数显扭力扳手_扭力测试仪_测力计_推拉力计_拉力测试仪_测试台架-上海实干实业有限公司 | 兰舍硅藻泥 -- 深圳硅藻泥|深圳兰舍硅藻泥|深圳硅藻泥品牌|深圳硅藻泥价格|深圳硅藻泥厂家|深圳硅藻泥施工| | 永康微网站建设、永康手机网站建设、永康营销型网站建设、永康外贸网站建设、永康网站托管、永康网络公司—英汇网络 - 永康市英汇网络技术有限公司 | 自恢复保险丝_贴片保险丝_插件保险丝_力特保险丝_力特经销商_SMD贴片保险丝_一次性保险丝厂家—深圳市集电通实业有限公司 | 四川迪瑞机电设备有限公司-容积式换热器|半容积式换热器|容积式换热机组|半容积式水加热器|换热器在线除垢防垢器|迪瑞机电 | 苏州拆除公司_太仓拆除公司_常熟拆除公司_昆山拆除公司--苏州伊诺尔拆除工程有限公司 | 深圳社区邦家政公司-保姆_月嫂_育儿嫂 _早教育婴师_家政钟点工_家政培训_家政加盟- 社区邦优质生活服务 专业、标准化、便捷、安心,一站式家庭服务平台,服务专业有保障 ! | 移印机厂家_丝印机器设备_全自动丝网印刷机-东莞展迅机械科技 | 今日标准_走心机_数控走心机_车铣复合_厂家_深圳今日标准官方网站 | 兰州物流公司_兰州货运公司_兰州物流电话上门取货_兰州立辉物流公司 | 欧艺宝盾科技(北京)有限责任公司_北京旋转门厂家_转门维修_高端商务门控定制 - | 汽修学校|汽车维修学校收费|全国职业技校汽修-北京万通汽修学校 汽车轴承|圆锥滚子轴承|轴承生产厂家|赛襄轴承 | 江苏科星新材料有限公司 - 南通科星化工股份有限公司 - 南通星奇新材料有限公司 | 廊坊微信营销,廊坊小程序开发,廊坊APP开发(安卓_苹果ios开发),微信朋友圈广告,百度推广,廊坊网络公司品牌服务商-河北盛秋网络科技有限公司 | 气体报警器,有毒气体报警器,可燃气体探测器,乙炔气体报警器,可燃气体检漏仪,便携式气体检测仪,气体报警控制器-山东如特安防设备有限公司 | 硬度计,里氏硬度计,布氏硬度计,高强螺栓检测仪,平板导热仪,专业无损检测仪器商-北京时代新天测控技术有限公司-北京时代新天测控技术有限公司 | 天空彩票天下彩,天空彩天空彩票免费资料,天空彩票与你同行开奖,天下彩正版资料大全 | 长春市龙飞数码印务有限公司,龙飞印务,长春商务印刷,长春精品包装,长春数码快印 |