Guangzhou Steel construction technique which span a large space?

Time:[2016-4-20]  Hits:4433

Guangzhou Steel construction technique which span a large space?

 

Guangzhou Steel Slide the laws generally can be divided into two types: structures by supporting sliding method. The following were introduced Guangzhou Steel construction features of the two methods.
 
Slip Method: The basic idea is to structure the whole (or partial) in the first assembly with the conditions of the site assembly forming, re-use sliding systems designed to shift the overall position of installation method. With this installation technology, assembly site and assembly machinery and equipment can be focused on a relatively fixed venues, as compared with in situ mounting method can reduce the amount of temporary support measures and operating platforms, space-saving processing and management costs. First with the structures by which key consideration in the design of the structure of direct construction difficult position, for example outside the periphery of the construction site is limited, can not meet the normal walking across the inner lifting equipment. The basic elements of this construction method is to "enhance the overall engineering," the assembly ground reaction force support, enhancing the overall replaced by "lateral movement", so essentially the same method to enhance the work.
 
At the same time, using this method should at least pay attention to several points: a support structure at the slip in favor of laying the track, slip line length, the higher the efficiency; slip unit should geometric invariant system, slip process is sufficiently rigid and stability, resistance to minimize slippage when. When using multi-point traction slip is achieved, in order to avoid twisting structure during sliding, traction synchronization must be controlled if it is difficult to ensure that, should fully assess the impact calculated by the traction unit is not synchronized to slip caused when necessary, temporary reinforcement of the slip unit. Slip unit before the final fixed structure exists in a direction orthogonal to the direction of movement of "easy slip" trend, because the conditions are different and the design of supports, designed to prevent the outside (ie, the slip plane) of the deformation, it is necessary to take prevent the "fall" of measures, such as setting a rigid rod or flexible cable from the balance on both sides of the support nearby.

In addition, the structure of sliding method further comprises two different processes: Pin slip by, the cumulative slip.
Pin slip by: the slip unit or a Pin Pin composed by a number from one end to the design position, between the sliding unit at high altitude were connected directly to form a unitary structure.
Cumulative slip: slip upcoming unit on the rail just slip some (temporarily moved to the design position) to be connected to the next unit and then slip a distance, and so forth, by Pin accumulated until each unit Pin push to the design position.
In general, large-span space steel structure and installation method, can not be set when the temporary support or the use of a crane to install the poor, that is, direct construction of buildings at the position in question, Slip engineering methods can be used as solutions one.
Supporting sliding method: sliding method is supported in the structural design of the Group erection support frame structure in place in order to provide support for installation and operation of the platform, to be part of the structure of the installation is complete, the support that is already installed sliding structure Bi out. Such is the structure of the adjacent in-situ installation created the conditions, and so on, until the completion of the structure of the overall installation. Thus, with different structures by supporting sliding method can be summarized as "structure does not slip and slide support mechanism" and Slip law is "structural support mechanism does not slip and slide." When using the support sliding method, in addition to the support structure is designed to meet the general global and regional stability, but also consider the level of dynamic load (start-up and braking effect caused by the horizontal inertia force), can be added a large brace if necessary to improve its anti lateral stiffness. To sum up, since this method to be occupied structure across the venue, so when the surrounding environment is difficult to provide a splice site structure supporting sliding method can be used as one solution. It is worth noting that, regardless of the support structure or slip slip method, the sliding track in addition to the conventional linear translation, the slip curve is also not uncommon, frequently used in engineering practice.
 
Enhancing the overall installation method: Installation method to enhance the overall structure is to be installed on the ground floor or a suitable projection assembly forming position, and then use the "lifting system" will enhance the overall upward to an installation method of shaping the design elevation structure. When large-span steel structure height is higher, not conducive to the erection of supporting tire rack, lifting steel shape rules, enhancing the overall construction methods can be employed as an option.

Large-span steel structure cantilevered unsupported installation method: the so-called large-span steel structure cantilevered unsupported installation method that is not in the erection of the support mechanism of the conditions to the stiffness of cantilevered steel body based on the use of mechanical lifting at height parts installation, use and gradually extended phase of the installation way for construction. Relatively high altitude in situ installation method, although the labor law is also in the vicinity of high-altitude Situ installation, but does not entirely because of the temporary support mechanism, measures less construction, the construction process is simple (no unloading). Suitable structural body stiffness, good stability, high height cantilevered steel. With this construction method, by the influence of its own weight, will be cantilevered section under torsion, and the resulting problems is to install the coordinates of an unknown member of the encounter when the mounting position or shape required the presence of the closure case, the bit configuration of the construction process shape control is one of the biggest technical problem, which is directly related to the construction field configuration when completed can meet the requirements, and the cantilevered section smooth closure.
 
Guangzhou Steel for large-span steel structure construction, the original high-altitude air unit installation method, slip mounting method, enhancing the overall law and large span cantilever mounting method is currently unsupported several typical and common construction methods, but its application must grasp conditions and key technical points, in engineering practice, a reasonable choice. Especially in recent years, most of the projects has a unique architectural style, bring many difficulties to the construction in particular installation. A deep understanding of the structure of the composition of these projects, to understand its load transfer path, familiar with the specific requirements of the project area where the ambient conditions and the engineering, construction and available resources and master their own proprietary technology to local conditions to design the most appropriate , get rid of the installation program, it is the pursuit of the highest level of construction technology.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 我的建筑网-中国建筑工程行业门户网站!| 微孔板恒温振荡器-超声波探伤试块-微孔板迷你离心机-南京互川电子有限公司 | 家用油烟净化机_商用餐饮油烟净化器_工业油雾废气处理设备_深圳市宝篮环保 | 长沙变频器维修,变频器维修,ABB变频器维修,西门子变频器维修,施耐德变频器维修,伺服驱动器维修,工业机器人维修,20年专业工控电气维修,长沙文铖电气设备有限公司_长沙文铖电气设备有限公司 | 青浦区摄像头安装/青浦区无线网络覆盖/青浦区网络调试公司/青浦区IT外包公司/金山区网络维护公司/金山区防火墙调试公司 | 河卵石制砂机|鹅卵石制砂机-移动制砂机-制砂设备-郑州秦星机械设备有限公司 | 面粉加工设备-面粉加工机械-面粉机组-面粉磨粉机-面粉机成套设备-河南粮院机械制造有限公司 | 收银系统_收银机_pos收款机_门店管理系统-客如云 | 南通出国劳务公司-如东海外经济技术合作有限公司-启东,海门,如皋,海安出国劳务 | 西安防静电地板_防静电地板厂家_防静电地板价格_OA网络地板_写字楼架空地板_机房墙板安装-红梅防静电地板厂家直销 | 网站建设|外贸网站建设|做网站公司-济南超越互联-推荐 | 钻床,数控钻床,摇臂钻床,立式钻床_滕州市高地机床有限公司 | 逍遥安卓模拟器_安卓模拟器电脑版_安卓手游模拟器哪个好用_逍遥手机模拟器官网 | 西安宣传片拍摄,陕西艺景网络科技有限公司资料备份,西安影视公司,视频拍摄制作,抖音视频制作,纪录片拍摄西安短视频摄影团队,西安抖音视频拍摄 | 山东万通液压股份有限公司-自卸车专用油缸,能源采掘设备油缸,机械装备用油缸,油气弹簧,工程机械油缸,液压元件 | 万通汽车学校,汽车学校,汽修学校,汽修培训学校,汽车美容学校,汽车维修学校,学汽修-武汉万通汽车学校官方网站 | 仪器仪表维修_示波器维修_进口分析仪维修_热像仪维修_上海仰光电子仪器仪表维修部 | 永康微网站建设、永康手机网站建设、永康营销型网站建设、永康外贸网站建设、永康网站托管、永康网络公司—英汇网络 - 永康市英汇网络技术有限公司 | 长春网站优化,网络推广,seo快速排名,1.8元/词/天-同信长春网络公司 | 上海物流公司_上海冷链运输_空运_电商仓储配送电话-迈泽物流 | 爬架网@建筑爬架网@冲孔建筑爬架网片@工地冲孔建筑爬架网片@工地冲孔建筑爬架网片厂家@工地冲孔建筑爬架网片生产厂家-安平县诺德金属制品有限公司 | 郑州房产律师|专业房地产纠纷律师热线_河南锦盾律师事务所 | 液压油缸生产厂家-常州辰佰液压机械有限公司 | 家用座椅电梯 斜挂升降平台 无障碍升降机 残疾人升降机的生产厂家超易达机械 | 压力变送器,差压变送器,液位变送器,温度变送器生产厂家价格-西安仕乐克仪表科技有限公司 | 连云港机械手厂家_全自动焊接机械手_刀轴焊接机_智能轴类焊接机_连云港建博自动化设备有限公司 | 活性氧化铝球-活性氧化铝干燥剂厂家价格-3A-5A分子筛-巩义市亿洋水处理材料有限公司 | 橡塑保温材料_防火保温材料_保温棉_东莞康成保温材料有限公司 | 青岛除甲醛公司|青岛甲醛治理|青岛除甲醛|甲醛检测|光触媒除甲醛|装修除味除甲醛|新房除甲醛|青岛室内环境污染检测治理|青岛闪洁环保科技有限公司官网 | 暖家乐散热器_天津市暖家乐金属制品有限公司 | 无尘车间_洁净车间_净化车间_洁净室工程一站式净化服务商-深圳市美克威尔环境科技有限公司 | 仪器校准,校验,校正,检定选值得托付的第三方法定计量检测机构! 铱金供应-上海钌合金-氯铱酸厂家-上海庞势新材料科技有限公司 | 深圳危化品经营许可证_危险化学品经营许可证办理 | 真空烘箱-高低温试验箱-防爆烘箱-防爆高低温试验箱-老化房-恒温恒湿箱-高低温试验箱-高低温冲击试验箱厂家—上海标承实验仪器有限公司 | 河间市天一密封材料有限公司-回转窑密封设备,除尘过滤袋 | 排烟风机-屋顶风机-消防高温排烟风机-山东凯亿空调 | 雨量计,翻斗雨量计,声波雨量计i,时差法流量计,时差法明渠流量计 - 徐州伟思水务科技有限公司 | 柯赛德斯-加美润滑油-专业做汽车工业润滑油品牌加盟代理 | 食品油炸机_葱酥油炸机_蒜酥油炸机-山东世联机械厂家 | 实木运动地板价格_运动木地板厂家-欧氏实木运动地板网 | 久久91精品久久91综合_国产亚洲自拍一区_国产精品第1页_亚洲高清视频一区_91成人午夜在线精品_亚洲国产精品网站在线播放_亚洲国产成人久久综合区_国产精品亚洲专区在线观看_免费视频精品一区二区三区 |