Foshan main steel members (b)

Time:[2016-5-14]  Hits:5289

welding
(1), the general requirements
a welder required certificates.
c welding, flux before use technical specifications shall be specified baking temperature baking.
c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
(2) the welding process
a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
b raining or snowing non-open-air welding.
c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
d same position should not exceed twice the number of weld repair.
(3), H-beam welding
All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


test
(1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
(2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

Painting, NO
(1), the general requirements
a member rust and paint work should be carried out after the quality inspection qualified member.
b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
(2), the management coatings
A variety of coating materials of different specifications should meet the design requirements.
b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

Factory
Lifting member according to plan will be qualified batches packaged, transported to the site.

Admission preparation
(1), construction workers and related personnel arrived at the construction site preparation work before installation.
(2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
(3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
(4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
(5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
(6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
(7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
(8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 97夜色爽爽影院在线 | 日韩在线一区视频 | 欧美日韩国产免费一区二区三区 | 一个人看的www视频在线观看视频 | 色吧亚洲欧美另类 | 日本久久久久久久 | chinese女烈真实刑讯11 | 四虎国产精品永久在线看 | 在线看欧美日韩中文字幕 | 美女脱了内裤后打开腿视频 | 色噜噜狠狠狠狠色综合久不 | 1024香蕉国产在线视频 | 色在线网 | 日本天堂免费 | 欧美一级特黄乱妇高清视频 | 天堂资源在线最新版 | 午夜国产精品影院在线观看 | 全免费a级毛片免费看不卡 全黄一级片 | 日本一道本在线 | 天天干天天干天天天天天天爽 | 久久爰 | 亚洲 另类色区 欧美日韩 | 日本最新免费二区三区 | 免费人成网站在线播放 | 一级做a爰片性色毛片小说 一级做a爰片性色毛片思念网 | 日韩日韩日韩 | 怡红院在线观看在线视频 | 91香蕉在线观看 | 久久亚洲国产午夜精品理论片 | 青青视频免费在线 | 色丁香久久 | 伊人俺去久久涩五月综合 | 亚洲欧美日韩精品永久在线 | 愉拍自拍 | 一二三四视频中文字幕 | 婷婷5月 | 美女脱了内裤露出尿囗正面拍 | 手机看片日韩日韩韩 | 有码 在线| 久久久久久久久国产 | 日本亚洲一区二区三区 |