Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4923

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 日韩美女免费线视频网址 | 婷婷综合久久中文字幕 | 风间由美日本在线观看 | 日韩免费在线观看视频 | 欧美一区精品二区三区 | 99精品久久久久久久 | 午夜a爱 | 免费观看成人久久网免费观看 | 久久国产精品亚洲va麻豆 | 91pron在线观看| 青草草在线视频 | 在线观看一二三区 | 又粗又大的机巴好爽视频视频 | 三级国产精品一区二区 | 午夜免费 | 琼明神女录小说 | 亚洲精品 欧美 | 调教美女校花 | 538这里有精品视频4 | 青青草国产精品视频 | 久久精品综合视频 | 日本强日本不卡一 | 男人j桶进女人p免费播放 | 亚洲一区二区观看 | 一个人看的www片免费中文 | 美女扒开胸露出奶乳免费 | 在线亚洲精品视频 | 奇米一区 | 亚美黑人区| 久久99久久99精品免观看不卡 | 8x成人| 欧美网站在线观看 | 婷婷综合久久中文字幕一本 | 中国日韩欧美中文日韩欧美色 | 热热九九 | 欧美日韩一区二区三区视频在线观看 | 这里只有精品视频在线观看 | 成人美女洗澡视频免费 | 男女生搞黄| 五月网婷婷| 久久亚洲国产视频 |