Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4923

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 轮流发生性关系小说 | 色婷婷激婷婷深爱五月小说 | 日韩成人免费aa在线看 | 三体动漫在线观看完整版 | 高清视频一区 | 午夜999| 一级毛片在线免费视频 | 看视频免费网址 | 插的我好舒服 | 亚洲我不卡 | 香蕉福利久久福利久久香蕉 | 亚洲国产成人精品区 | 欧美综合影院 | 亚洲精品在线网址 | 一区二区不卡在线 | 亚洲人网 | 免费在线网站 | a毛片免费视频 | 日本一区二区免费高清视频 | 日日摸日日 | 日本成年一区久久综合 | 色老成人精品视频在线观看 | 婷婷激情狠狠综合五月 | 青娱乐免费在线视频 | 91精品国产91久久久久青草 | 日本高清色www | 深夜 免费 视频 | 拔插拔插最新网址 | 亚州免费一级毛片 | 男人在线天堂 | 日本二三区 | 日日干夜夜操 | 动漫女仆被吸乳羞羞网站视频 | 密爱善良的嫂子在线观看 | 人人伦| 天天射天天爱天天干 | 99国产精品自在线亚洲页码 | 51vv福利视频在线精品 | yjizz视频| 日本韩国在线播放 | 欧美视频区 |