Precautions Foshan Steel Design

Time:[2016-6-15]  Hits:4745

Followed by the State to vigorously promote Prefabricated construction today, Foshan steel construction and more subject to our attention. The following are some of Foshan Steel watch point plan for us to see.
A Frame
⑴ portal frame should first determine whether there is a crane, such as plant demand resettlement process requests crane, you should note the following: ① column foot should be planned into a rigid column base; ② column should be planned into uniform section column; ③ between support columns by longitudinal horizontal crane load control programs, rather than a simple construction planning, when there are no less than 5 t crane when, should use steel support. As no crane portal frame, press columns and other practices planning a wedge, not repeat them.
Room ⑵ column support resettlement
Between the columns support the roof support pillar should be placed in the same room, so that the formation of a stable system of longitudinal frame, frame means to facilitate and increase the longitudinal stiffness. Support should be placed between the top of the second column by column from time to time, when placed in the second inter-column list when the appropriate placement of a rigid column tied, and the rigid tie rod and the wind column longitudinal orientation together, make a direct transfer wind loads. The turning point in the frame (single-span roof of the house and column capitals and some centers and multi-span pole in the house and the roof) should be set rigid Tied houses along the entire length. When larger span gantry in place between support columns should be appropriate to increase the number of rigid tie rods that support the angle is about 45 °. When the construction of functional constraint that can not be disposed between the support column, should be placed longitudinal frame. And that they've done this to make a rigid connection between the end of the column beams, studs and then cancel the support of engineering, construction make placement more flexible, with good results.
⑶ roof and wall construction
Roof and wall construction approach is to increase the stiffness of the frame, the key way to avoid the outer frame plane instability. Purlins, wall beams generally composed of cold-formed thin-walled structures formed when the column spacing less than 6 m, when designing a brace, more than 6 m, located two brace. Here should be mentioned especially the oblique bars, school diagram process, we often see a lot of steel structure manufacturers or planners provided the oblique strut bar without setting conditions. Factor is the construction concept is not very clear, because after construction mechanics, disposed between the oblique strut bar, before the formation of a stable system. In the roof, walls planned resettlement should also be noted bracing, bracing is not a luxury it is to avoid perverting the compression flange provided. Studies have shown the first portal frame damage due to pressure caused by perverting the largest flange. Oblique inner flange beams converge at the column flange and frame is the emergence of perverting vital parts, there is provided bracing is very important. In addition, the "portal frame light house steel construction technical specification" CECS102: 2002 (hereinafter referred to as CECS102: 2002) rules: oblique beams in the bottom flange of the compression zone is also set bracing, a distance not greater than the corresponding compression wing edge width of 16 (235 / fy) 0.5 times. When you press a general portal frame, purlin distance of about 1500 mm, a spacer is provided a bracing purlins above conditions can be satisfied.
⑷ shear key
"CECS102: 2002" rules: column anchor should not be used to withstand the horizontal shear column foot portion, the horizontal shear force by friction between the floor and the concrete foundation (friction coefficient desirable 0.4) or set shear joints bear. This is the time of our accounting mast, usually displayed warning: "Let Shear pedestal demand!"
Analysis of these factors, the main door is made generally lighter weight structure, column friction soles of the feet and between the concrete foundation is small enough to resist lateral wind loads and seismic effects, it should set the shear key. Usually the shear key beam with angle iron or steel, the shear bearing capacity of the cross section of the weld should be accounted for, columns and soles of the feet of open space between the surface of the foundation secondary grouting. Specifically refer to "many high-rise residential construction steel structure node configuration detail" 01SG519 diagram on page 30 to gather a large sample 1,2 practices.
Means for positioning the column anchor ⑸
This is the planners generally ignores questions and anchors positioned in engineering practice inaccuracy or rigid frame construction of the device difficult project case everywhere, we also encountered such a situation, and later had to reinforcement. Analysis of factors, notably the non-convergence between the anchors, the overall stiffness of the poor in the process of pouring concrete in the anchor inevitably shift. In response to these factors, taken before pouring concrete column anchor embedded fixation process, the specific approach shown in Figure 1. Mounting bracket and bolt to form a small lattice columns, positioned so the anchor would facilitate accurate. ⑹ wind columns and frame the current convergence of wind portal frame column planning practice there are two mistakes: one is the wind column and frame made of the same wind columns and beams or hinged frame or just then, the wind column to both wind and participate vertical load effect and the effect of the horizontal level. The planners do not usually do such a frame of longitudinal wind checking. This is done omissions load, Project Planning is a taboo. I think you are a force bent structure that clearly should not complicate it by force. This approach is defective; Another approach is to wind column and frame on one axis, but do not think that wind column vertical load effects wind between columns and beams with a steel frame after welding joints connected. This practice is still a part of the vertical load transmitted to the column of wind, and the steel sheet is small lateral stiffness, vertical load at the onset of the effect is difficult to ensure that there is barely after the land transfer the wind load. These two approaches have disadvantages. Here we recommend the following practices:
Plant selection do legal grids, Pin top frame column axis wind shifted 500 ~ 600 mm, wind through the column flange adapter plate is connected to the frame beam stiffeners and plate convergence and vertical stiffener open a long hole, use an ordinary bolt adapter bolts approach shown in Figure 2. Figure 2 wind column and frame adapter bulk sample
Plan 2 steel structure
Select ⑴ steel building systems
Common constructions of steel construction system can be divided into pure and construction - support systems into two categories. Highly selective and construction material systems, the use of closely-related features. This requires the construction engineer should work closely with the architect, when the construction of functional constraint can not be set because the support system should be used pure structure. Pure system configuration because no anti-sway support, two vertical and horizontal directions to satisfaction, "the construction of earthquake planning standards" GB50011-2001 (hereinafter referred to as "anti-regulation") Section 5.5 of the elastic layer between the displacement angle less than or equal request 1/300, beam the column in vertical and horizontal directions should just pick; because of "anti-regulation" section 8. 3.4 rule: "when the column in two mutually perpendicular directions and beam rigid connection, should use box-section" Therefore, use of pure construction system, usually planning to box column column column inside the box but the process of applying rust and proper maintenance difficult, which is steel construction planning a major problem. They are also trying to choose the column method of pouring concrete in the plan, but because the box column separator disposed stiffening node area, pouring concrete very difficult; on the other hand, the country is still in the concrete pipe during the discussion, common planning software can not be accounted for accounting theory in the Journal of the different. Based on the above factors when planning constructions of pure steel, most still use non - concrete box section column. Own labor process selected word column strong and weak axes are rigid convergence algorithm, according to the "anti-regulation" section of Article 8.3.4 of the text is selected, "should", see also the mainland large selection of drawings and Planning Institute said planning in spreadsheets method, but calculation results are not satisfactory, the elastic layer between the weak axis direction displacement angle is still unable to meet the request, "anti-regulation" of Article 8. 3.4. Because the box column in the structure of some tough, so the idea when planning a multi-layer steel cylinder-shaped house built try to use planning to construct - support system. Construction engineers and construction division to coordinate as much as possible, through resettlement in demand resettlement support bearing floor, elevator, which do not open big hole in the wall to achieve the support of stealth. The results indicate the accounting practice engineering, construction support displacement control effect is very good, so that in addition to the choice of column-shaped material saving, anti-rust, the use of easy maintenance, easy convergence weak axis direction, it is a useful method.
⑵ node Planning
Steel structure node planning is the key to planning steel structure. Hinged nodes simple, clear contact mechanics, where not too much to say, just focus on what connected node planning. Moment resistant convergence plan, "anti-regulation" 8 3.4 Recommended use Standard Figure 8. 3.4 - The node 1 in the form, in engineering practice are mostly chosen is such a node. This node has two accounts in accordance with: accurate programming and general programming. The difference between the two is that the former Reflections bending and shear webs, the latter only ponder web shear. Accurate planning law planning in practice, difficult bending webs satisfied request must be thickened to a large extent the web. The approach is very thick web of economic, so most use common project planning method, this accounting model Mechanics clear, simple accounting, but must pay attention to planning to take measures to strengthen the earthquake, such as the use of the plastic hinge relocation enhanced convergence or end of the beam away from the beam ends not far from the upper and lower flange beams weaken dog bone convergence. This is because, in the end without any reinforcing beam flange case, only ponder web convergence shear bolts bear, bear moment by the flange weld, then weld flange flexural capacity of only about 80% capacity BEAMS (that is, only beams with the section modulus of the beam flange section modulus of about 80%), then press the "steel construction planning standards" on page 3. 2.2, thinking construction site conditions weld strength reduction factor 0 is multiplied by the value of planning. 9, then the flexural capacity of the beam flexural capacity of Cohesion only 70% to 75%. This strong convergence node ratio is even lower 30% to 25%, in violation of the "earthquake not fall," the basic principles of earthquake "strong nodes, weak bars." Based on the above factors, it should be used "many high-rise residential construction steel structure node configuration detail" earthquake shown on page 19, 20 01SG519 portfolio strengthened approach.
Else
In our "anti-regulation" and "the Rules" the rules were not steel structure seismic level, just 12 minutes and 12 layers or less standard and two or more layers. I thought it was relative to our vast big difference around the fortification is characterized by inappropriate. Old "the Rules" in the multi-set size of a house built high-rise steel expansion joints no rules, only single industrial plant made some rules. These two points are the conceptual big question, "the Rules" does not emphasize these two points is appropriate.
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 消防改造安装,消防维修检测,消防工程安装,气体灭火施工安装,火灾烟感探测器清洗 | 真空清洗炉_真空煅烧炉_铸铝加热器-盐城市钰凯电器有限公司 | 蓝禹太阳能蓄电池 风能储能胶体铅酸电池-扬州东泰电源有限公司 | 中原起重-河南省中原起重机有限公司【官网】 | 洒水车|冷藏车|LED广告车|油罐车|道路救援车|垃圾车|程力专用汽车股份有限公司销售九分公司 | 麦秸映像网络技术有限公司,河南省政府采网入驻对接,新乡网站维护建设,小程序开发,APP定制开发,钉钉开发,新乡软件开发等相关网络业务 | 基坑护栏,临边护栏网,爬架网,爬架网片,铁路防护栅栏,公路护栏网,河北昊坤金属制品有限公司 | 圆锯机-滚牙机-滚丝轮-滚丝机-滚牙轮-切断机-东莞市溪远泰五金机械有限公司 | 陕西柱塞泵厂家_智能张拉设备_桥梁施工设备_千斤顶_液压分裂棒_液压分裂枪|陕西中拓矿山设备有限公司 | 气体检测仪,多功能气体检测仪,四合一检测仪,氯气检测仪,有机挥发气体检测仪,气体报警器-南京诺邦电子科技有限公司 | 全自动滤水器_射水抽气器_气液两相流疏水器-连云港神美电力辅机有限公司 | 化妆粉扑厂家【秀兰】一线品牌资格供应商_海绵粉扑批发_气垫粉扑价格_广州秀兰生物科技有限公司 化工招聘网 化工人才网|化工英才网-化工企业招聘首选网站 | 硬度计,里氏硬度计,布氏硬度计,高强螺栓检测仪,平板导热仪,专业无损检测仪器商-北京时代新天测控技术有限公司-北京时代新天测控技术有限公司 | 喷淋清洗剂,铝合金清洗剂-青岛爱大生环保科技有限公司 | 洗车机-自动汽车洗车机-全自动洗车设备-全自动电脑洗车机-北京自然绿环境科技发展有限公司 | 新房_二手房_别墅_全包装修-天美艺装饰【官网】-深圳装修公司 | 行李快递安检机-便携式X光安检仪-行李安检机-液体-爆炸物探测仪-安天下安检设备 | 江寒必恋术在线阅读_江寒必恋术免费下载 - 江寒必恋术电子书 | 文轩热能_水冷板散热器热设计热管理系统_铝型材铲齿摩擦焊热管_散热片散热板生产加工厂家 | 太阳能路灯 太阳能路灯厂家 路灯厂家-保定正联光电科技有限公司 太阳能光伏发电_太阳能热水器_空气能热水器_直饮净水器_深圳市大兴节能环保科技有限公司 | 铝合金热处理设备_天然气铝棒加热炉_QPQ热处理设备-浙江长兴天源炉业科技有限公司 | 塑胶模具定制,提供注塑加工服务,塑料模具制造厂_博腾纳公司 | 深圳办公室装修_办公室设计_写字楼装修设计_深圳市加洲建设集团有限公司 | 深圳专利申请-深圳商标注册-深圳国高认定 - 深弘知识产权 | 呼吸家官网|肺功能检测仪生产厂家|国产肺功能仪知名品牌|肺功能检测仪|肺功能测试仪|婴幼儿肺功能仪|弥散残气肺功能仪|肺功能测试系统|广州红象医疗科技有限公司|便携式肺功能仪|大肺功能仪|呼吸康复一体机|儿童肺功能仪|肺活量计|医用简易肺功能仪|呼吸康复系统|肺功能仪|弥散肺功能仪(大肺)|便携式肺功能检测仪|肺康复|呼吸肌力测定肺功能仪|肺功能测定仪|呼吸神经肌肉刺激仪|便携式肺功能 | 神魔录官网 - 收藏网址的地方,也是防骗小知识分享的地方 | 压瓦机|C型钢机|彩钢设备|C/Z互换檩条机-河北玉发压瓦机 | 山西配电柜,高低压成套柜,太原高低压柜,山西开关柜,箱变壳体_山西雷隆电柜电气设备有限公司 | 合肥年会策划-合肥开业庆典公司-合肥会务活动礼仪公司-合肥展台搭建/音响租赁公司 [七色海] | 气密仪-气密性检测仪-气密性测试仪-苏州莱和电子科技有限公司 | 河南省恒达锅炉制造有限公司| 新乡市德诚机电制造有限公司_筛分设备_振动筛机_颗粒筛选机 | 昆明护栏网厂家_隔离栅_围栏网_石笼网「13年生产经验」-云南北辛商贸 | 挥发性有机物,VOCs在线监测系统,深圳市恒富盛科技有限公司 | 徐州恒铭机械设备有限公司_装载机配件_压路机配件_起重机配件_挖掘机配件_配件_徐州恒铭机械设备有限公司 | 一体式电磁流量计_分体式电磁流量计_卫生级电磁流量计_卫生型电磁流量计_电池供电电磁流量计_卡箍式电磁流量计_废水电磁流量计_德克森仪表(淮安)有限公司官网 | 泊头市鸿海泵业有限公司--导热油泵,高温油泵,沥青保温泵,圆弧泵,齿轮油泵,高粘度泵,自吸离心油泵,罗茨油泵为主的专业生产厂家 | 饲料车_散装饲料车_畜禽运输车_散装饲料运输车_饲料车厂家_铝合金运猪车-程力专用汽车股份有限公司 | 磨刀机厂家,全自动磨刀机-山东威海富田磨具 | 山东长青石油液压机械有限公司-致力于石油机械设备的研发制造,提供定制服务 | 四川迪瑞机电设备有限公司-容积式换热器|半容积式换热器|容积式换热机组|半容积式水加热器|换热器在线除垢防垢器|迪瑞机电 |