www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > Foshan General Steel measuring program
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.huihuitaotao.cn

Foshan General Steel measuring program

Time:[2016-7-6]  Hits:3984

As the fundamental Foshan steel construction, during construction only, must be applied with a series of measurements and each process, measurement solutions throughout the entire construction process of steel Foshan, Foshan steel construction preparations key First, through high-precision measurement and calibration accuracy of the installation of the steel member to the specified location to meet the accuracy requirements, therefore, after the preparation, the measurement is the most keywords point below Katsukuni steel to introduce the next General steel measuring program

 

First, the measurement and control of all construction work Surveying work required to be responsible for the construction and installation of steel structures, Foshan, with supervision engineers test measurements and all auxiliary work conditions

Second, before the project began, the elevation and coordinate reference point and measuring point provided by the chief engineer, but if you think the information provided by contractors when there are problems, engineers need to think reflect

Third, after receiving measurement reference point provided by contractors, precision measurement of the measurement reference point to go to school, and to review the accuracy of the information and data reference point, and to be reflected in writing Engineer

Fourth, the contractors provide a reference point for the word basis, according to national mapping standards and engineering precision requirements, the control center set engineering and engineers to review

V. baseline, anchor construction, accurate control points and point of construction, after a final measure to detect and measure the positioning point accuracy meets the construction requirements

Sixth, protect the measurement is completed reference point, the reference lines,

7. After the installation is complete Foshan steel, at the same time each day to determine whether the measurement Foshan deformed steel node data, corrected if necessary

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美一区二区三区激情啪啪| 缘分五月在线影院社区| 男人捅女人免费视频| h色短篇小说在线阅读| 女友闺蜜真湿夹得我好爽小说| 玖玖热99这里只有精品| 亚洲综合视频在线| 日产免费线路一二区2022| 欧美成人h在线观看完整版| 永久影院| 老师扒开尿口男生摸尿口| 公厕ova无修版动漫在线| 怡红院在线视频全部观看| 波多野衣结在线精品二区| 236宅宅理伦免费| 日韩高清欧美精品亚洲| 日本a∨在线播放高清| 最新国产网址| 日本女人下面毛茸茸| 把女人弄得特爽黄a大片| 欧美成人精品一区二区三区| a片毛片免费观看| 久久香蕉国产线看观看精品蕉| 日韩欧美国产高清| 高清在线观看免费网站| 绝美午夜暗香视频丨vk| 日本 h无羞动漫在线观看网站| 免费a级午夜绝情美女视频| 91社| 么公的好大好硬好深好爽在线视频| 2019年中文字乱码| xxx日本免费| 日本视频网| 日本欧美中文字幕人在线| 99热这里只有精品首页| 中文字幕视频网站| 99热热久久| 99九九视频| 女友闺蜜真湿夹得我好爽小说| 全黄a一级裸片| 欧美激情高清免费不卡|