Construction measures of Foshan steel structure during rainy season

Time:[2017-9-27]  Hits:4654

First, Foshan steel structure project rainproof measures
Arrange special people to know the weather forecast in time and master the weather data in advance. Arrange the inspection management of special site in rain, do not comply with the rainproof measures or measures non-standard place, must subcontract deadline ordered rectification, especially for lightning protection measures must be carefully check all.
Two, Foshan steel formwork rainproof measures
When the formwork is stacked, the lower layer must be ground with the ground to prevent the rain from soaking and damaging. At the template stacking site, effective ground drainage measures must be taken to prevent rainwater from depositing.
Three. Rainproof measures for reinforcing bars
L for the site to place a longer time to prevent rain reinforcement steel cover, prevent serious corrosion of reinforcement. The steel stacking site must have good drainage to prevent rainwater from depositing and soaking the corroded reinforcement.
2 Foshan steel structure rainproof measures
To ensure the normal construction period, ensure the quality of the project. The main process of the project and the climate sensitive process, should be based on the characteristics of the rainy season construction, the preparation of the corresponding measures.
High strength bolts shall not be installed on rainy days, and no rain water shall be allowed on friction surfaces and high-strength bolts. During rainy weather, can not meet the requirement of production and can not guarantee the safety of construction, should stop construction. At this point, attention should be paid to ensure the safety of the work surface, set up the necessary temporary reinforcement measures. Steel structure hoisting must hang net in the outside of the building facade, building stairs, building adjacent edges and can not cover the holes to set up protective railing. For the components to be lifted, the water on the surface of the component shall be cleaned first, especially the friction surface of the component, and the surface layer shall be dried
3 、 welding of Foshan steel structure
Before the construction, should be in the operating platform than at the height of 1m welding with flame retardant woven cloth is tightly wrapped around the pillar, and the platform plane caves with asbestos clothgai Yan, so that the wind and the welding slag splashing down. In principle, outdoor welding is not performed on rainy days. Welding machine, welding wire, the cylinders should be placed in a special shed. So as not to damp the welding material.
4. Installation of high strength bolts for steel structure in Foshan
The use of high-strength bolt, high strength bolt with visual inspection, there shall be no rust, damage thread phenomenon, such as repair after use. Keep the connection clean and dry.
5, Foshan steel structure scaffolding rainproof measures
Rain, rain must be checked one by one to the scaffold fastener, and must check the scaffolding foundation is firmly in the inspection process. In the inspection process, construction and inspection personnel must ensure their own safety, protective measures in place, pay attention to anti-skid, fall prevention, is strictly prohibited command.
6, Foshan steel structure rain proof measures
All kinds of electrical leakage protection device must be sensitive, all kinds of construction line check, insulation outsourcing must be in good condition without damage, prevent leakage of rainwater electric wounding; outdoor setting electric welding machine, grinding machine, threading machine and other equipment should be set up under the upper canopy, take the method of preventing the rain soaked pad. Power line is not erected, bare or plastic wire, distribution box must rain. Metal mechanical and electrical equipment must adopt zero reliable protection, leakage protection device for motor switch box should be reliable. Any mechanical operator must be certified and wear insulated rubber gloves and insulated gloves as required. In case of heavy rain to stop all electrical and mechanical operations, the electric field of steel processing field must turn off the power, after the rain should timely check the organization safety performance of machinery, electrical appliances, rain weather prohibited lifting equipment and components and manual handling of materials or equipment etc.. The cable wires and wires used in the field are strictly forbidden to be soaked in rainwater or laid on wet ground. Overhead installation or underground installation and safe and reliable protection measures should be installed. Before the construction of the rainy season, the power supply, electric box, tower crane grounding, insulation and other projects shall be measured and recorded. After the rain, all electrical equipment and electrical boxes should be checked once. The doors of each electric box must be closed and must not be opened.
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 延吉新闻网 - 未来之选·就是延吉 [YanJinews.com] | 土工布厂家,土工布价格,山东德旭达土工材料有限公司 | 线束加工_线束加工厂_线束厂-苏州缆仕特电子有限公司 | 小型环境空气质量连续监测系统-烟气排放连续监测仪(碳排放)-青岛明德环保仪器有限公司 | 深圳彩盒印刷-纸盒包装-不干胶标签印刷-深圳印刷厂家-深圳贝的印刷 | 铱金供应-上海钌合金-氯铱酸厂家-上海庞势新材料科技有限公司 | 河南桥式起重机-河南门式起重机-宇华起重设备集团(官网) | 煤泥烘干机,酒糟烘干机,药渣烘干机,酵母烘干机,烘干机厂家-瑞奥新能源 | 液压万能试验机-液压式万能试验机-万能试验机厂家-济南鸿君试验机 | 配电箱自动生产线-配电箱生产线设备-山东炜桦智能 | 雨量计,翻斗雨量计,声波雨量计i,时差法流量计,时差法明渠流量计 - 徐州伟思水务科技有限公司 | 塞伯罗斯官网|二维码门禁|景区验票主板|扫码门禁|扫码开门厂家 | 青岛色粉_色母及改性塑料供应厂家 - 青岛建轩新材料有限公司 | 雅兰床垫-会呼吸的床垫-中国高端床垫-国潮床垫品牌 | 生物除臭_废气处理_玻璃钢风机_布袋除尘_脱硫脱硝_催化燃烧_生物滤池_广东正州环保科技股份有限公司 | 鸟语林-百鸟园-不锈钢丝绳网-钢丝网-瓦片防坠网-围网-河北中重钢结构工程有限公司 | 智汇工业-智慧工业、智能制造及工业智能、工业互联门户网站,专业的工业“互联网+”传媒 | 远东齿轮泵|高粘度齿轮泵|三螺杆油泵|沥青保温泵|高粘度稠油泵-远东泵业官网 | 全国产品维权打假真伪验证系统-石家庄市海略科技有限公司官方网站 | 江苏减速机_常州减速机_摆线减速机_摆线针轮减速机 | 专题秀_汇聚网络热门专题_实时报道各类新闻专题资讯 | 山东汇河环保科技集团有限公司,水囊水袋,水罐,油囊,预压水袋,吊重水袋_山东汇河环保科技集团有限公司,水囊水袋,水罐,油囊,预压水袋,吊重水袋 | 极限软件园-绿色免费软件下载站| 小程序开发,网站建设,APP开发,商城系统开发,社区团购系统开发,区块链溯源,互联网资质办理-软多信息技术有限公司_河南软多信息技术有限公司 | 全自动烫金机-全自动移印机-全自动丝印机-全自动平面机-东莞联昌实业供应各种丝印机和移印机 | 上海森信实验仪器有限公司| 耐磨锤头|合金锤头|高铬耐磨锤头|破碎机锤头|双金属双液复合锤头_巩义东辰实业 合金耐磨锤头铸造厂 | 驾驶洗地机|手推洗地车|天津洗地机|扫地车|仓库工厂扫地机|工业吸尘器|扫雪机|耐洁思 | 廊坊金星化工有限公司-钢套钢保温管厂家,玻璃钢缠绕保温管,镀锌铁皮保温管厂家,廊坊金星化工有限公司 | 永磁耦合_重载永磁软起_能量回馈式调速器_磁力耦合器_江苏磁谷科技股份有限公司官方网站 | 无锡鑫润杰金属科技有限公司| 输送机电动滚筒_山东电动滚筒_输送机滚筒_皮带输送机-山东中输输送机械有限公司 | 武汉办公室装修公司-展厅装修_湖北今泰装饰工程有限公司官网_今泰装饰 | 上海消防器材|水雾喷头|水幕喷头|螺旋喷头|雾化喷头|泡沫喷头 - 上海舜丹消防设备有限公司 | 泊头市特种油泵阀制造有限公司 - 渣油泵,重油泵,沥青泵,高压齿轮泵,煤焦油泵,导热油泵,三螺杆泵,圆弧齿轮泵,不锈钢齿轮泵, | 中国国际精细化工展览会—官网 | 线性排水沟-成品排水沟-树脂排水沟-树脂混凝土,缝隙式排水沟-时利和 | 小型生活污水处理设备_MBR膜生物反应器_口腔医院/脱脂污水处理设备_酸洗磷化/喷涂废水处理设备-上海台江环保 | 耐磨焊条_高硬度堆焊焊条_碳化钨合金耐磨焊丝_北京耐默 | 桥梁养护|桥梁维修加固|隧道裂缝修补|支座更换|管道堵水气囊|衡水众拓路桥养护有限公司 | 河南三特炉业科技有限公司 |