www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > What are the methods of installation for a professional steel structure?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.huihuitaotao.cn

What are the methods of installation for a professional steel structure?

Time:[2017-10-11]  Hits:5409

Steel structure is widely used because of its high strength, light weight, good seismic performance, high industrialization, energy saving and environmental protection. Moreover, the steel structure building will have extensive development space in the future. So, how are the steel structures installed? Now Foshan steel structure for everyone to explain.
1. construction methods:
The installation of steel structure engineering, basic axis and first review of concrete foundation top elevation, using the method of hoisting components, lifting all steel columns to be corrected after grouting are fixed, lifting the first layer to the five layer of steel, with hanging with the adjustment, then fixed, finally lifting the roof support and purlin system.
2. construction sequence:
The on-site lifting is divided into two construction units, each of which is operated independently.
3. preparation before installation
1. Construction of bolts: column axis positioning based civil construction check, embedment of anchor bolts.
Compile the installation plan and component supply plan, and do well construction.
3. Check the steel: steel factory should have factory certification, according to the drawing number check member before installation, the component in accordance with the installation sequence at the installation range, without affecting the installation conditions, as the components in the installation position below, to ensure the convenience of installation.
Installation procedure of standard section
Installation quality standard
4. installation construction process
1. The steel column installation. The installation wall purlin girder hoisting.
5. installation calibration
1. The steel column correction: steel column verticality correction test with theodolite or suspension hammer, when there is deviation correction by Jack, with Jack will base a little mark in elevation, and then change the plate thickness, column correction error free immediately after the fastening bolt, the steel column is correct after pouring the whole school in the column soleplate fine stone concrete fixed.
Steel beam correction: Measurement and correction of steel beam axis and verticality. Correction is done by Jack and reverse chain, and fixed immediately after correction.
6. high strength bolt construction
High strength bolts must have material certificate (quality guarantee) before construction, and must be re examined before use. The high strength bolt. The management of the special person for safekeeping, not to throw
High strength bolts should be moisture-proof and corrosion resistant.
High strength bolts should be finished after the end of the installation
To use the steel structure, then should go to the professional steel structure company, will have technical guidance. Foshan shenbon steel structure steel is a good choice, professional, brand, has a reputation, and is a collection of R & D, manufacturing, marketing, design, construction as a whole, the development of enterprises specialized construction of steel structure building
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 泰安兴润建材有限公司,泰安井盖定做,泰安警示桩定做,泰安雨水篦子定做,泰安操场篦子定做,泰安标志牌定做 | 江西挤塑板_挤塑板厂家_挤塑板价格-江合保温材料 | 上海喷涂厂|上海喷漆厂|粉末喷涂|平湖喷涂厂|平湖喷漆厂-平湖华梦金属科技有限公司 | 人工气候-智能-低温生化培养箱厂家|价格-上海予卓仪器 | 油压缓冲器-缓冲器-重庆佑旺机械有限公司[官网]西捷克重庆办事处 | 收银系统_收银机_pos收款机_门店管理系统-客如云 | 洁净室、手术室、实验室、无尘车间厂房的净化工程装修设计施工公司-福临建设 | 郑州课桌椅|学生课桌椅|升降课桌椅批发|厂家|价格-新科教育用品 郑州井盖雨水篦子厂家-建联建材 | 通讯电子连接器-工业电源连接器-板对板连接器厂家-普瑞盛源 | 易交换在线易货电商平台-互联网易物贸易,以物换物-无锡据风网络科技有限公司 | 提供专业.全面.优质的壁炉服务-莫洛尼官方网站moloney | 四氟瓶塞-塑料离心机-双联恒温水浴锅-常州天瑞仪器有限公司 | 一站式应用与数据集成平台(iPaaS) - 数环通 | 热熔胶涂布机-青岛三人行机械有限公司 | 延吉新闻网 - 未来之选·就是延吉 [YanJinews.com] | 上海舞台灯光音响租赁搭建线阵_年会演出摇头光束面光灯出租_led电子显示屏出租-上海led大屏幕租赁 | 衡水一体化污水处理设备|循环水旁滤器|加药装置|钢厂浊环净化装置|河北欧意科技集团有限公司 | 景观造雾_人造雾设备_雾森系统_冷雾降温_雾化消毒_喷雾除尘厂家-成都景程雾森 | 易众拍卖行-事故车拍卖,残值车拍卖,水淹车拍卖,全损车拍卖,修复车拍卖,碰橦车拍卖,瑕疵车拍卖,报废车拍卖,泡水车拍卖,拆车件拍卖,配件拍卖,火烧车拍卖,二手车拍卖专业线上平台 | 济宁搬家公司_曲阜搬家_济宁金顺搬家电话 | 手持电能质量测量仪-TD-1168多功能高空接线钳-上海妙定电气有限公司 | 数造云-面向3D打印的云制造平台 数控落地镗铣床_数控刨台式镗铣床_数控龙门加工中心-青岛辉腾机械设备有限公司 | 输送机_山东输送机厂家-山东中输输送机械有限公司 | 铝矾土熟料_高铝_细粉_骨料_铝酸钙粉_价格_铸造消失膜用铝矾土—嵩峰厂家 | 冷库出租_食品/医药冷库租赁_冷库改建/定制-北京亚冷 | 商业地产策划_商业地产代理_华锦亿爵商业地产顾问机构 | 郑州井盖雨水篦子厂家-建联建材 郑州建网站,郑州做网站,郑州网站建设,郑州网站制作,郑州高端定制网站,郑州APP开发 | 济宁山银煤矿机械有限公司,钻采工具,防爆电器,凿岩机械,风动工具,矿山机械,建筑机械,支护设备,通风防尘,铁路设备,仪器仪表,大型设备,矿用泵,钎具类,消防类,矿车类,配件区类 | 造型松|造型黑松|油松|泰山松-莱芜市盛世园林苗木专业合作社 | 龙淼环保-旋流-喷淋塔,高温布袋,脉冲布袋-单机-滤筒除尘器,活性炭吸附箱,催化燃烧设备,除尘器配件-沧州龙淼环保设备制造有限公司 | 重庆监控安装_监控系统工程_高清监控摄像头-重庆监控系统安装公司 | 装修工程-钢结构工程-环氧地坪漆-东莞市远鸣装饰工程有限公司 | 江苏美鑫食品科技有限公司| 手板机箱_亚克力机箱_医疗机箱_美容机箱_医疗设备外壳厂家_鸿堪医疗器械有限公司 | 曲阜市好博医疗器械有限公司_手术无影灯厂家,电动手术台出售,妇科手术台价格 | 铸铁型材_灰铁棒_球铁棒_圆铁棒生产厂家★河北起昌精密装备制造有限公司 | 热水工程|空气能热水工程|超低温采暖工程|太阳能热水工程|空气源热泵厂家|炬邦热能设备有限公司 热熔钻孔机【优质厂家】_多年热熔钻设备研发制造经验 | 烧腊培训,广东有实力的烧腊培训[免费试吃],广式烧鸭培训-烧鹅培训-学烧腊选广州嘉政 | 精品中文字幕在线观看,粉嫩av一区二区三区,最近中文字幕在线看免费视频,亚洲高清在线观看,日本一区二区视频手机免费看,国产黄色小视频,亚洲高清免费视频,国产精品一区二区欧美视频,亚洲人免费视频,亚洲视频在线观看免费,国产免费高清综合视频,中文字幕永久在线 | 河南车用尿素设备_郑州车用尿素设备_河南江宇环保车用尿素液厂家 | 粮食加工设备_玉米_大米_面粉_燕麦_豆类杂粮加工设备-华豫万通 |