Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:2884

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 男女xxoo做爰猛烈动态图小说| 日韩视频免费在线播放| 一级片aaaa| 色多多视频在线观看免费大全| 99热这里都是精品| 欧美一区二区三区在线播放| 91蜜芽尤物福利在线观看| vr专区精品中文字幕| 中文国产成人精品久久水| 日韩欧美在线观看视频一区二区| 在线sese| 一二三四在线视频播放社区| 插美女阴道视频| 成人国产在线24小时播放视频| 九九热线精品视频18| 久久亚洲这里只有精品18| 又粗又大的机巴好爽爽| 日本免费观看完整视频| 欧美成人资源视频影音先锋| 1769视频在线观看| 日本一二区免费| 中文字幕一区2区| blacked欧美金发大战黑人| 996久久国产精品线观看| 边吃奶边摸下我好爽视频| kkk4444免费观看| 欧美一级片播放| 日韩视频在线观看免费| 91精品国产综合久久青草| 久久线看观看精品香蕉国产| haose16在线永久免费| 欧美高清正版在线| v天堂一卡2卡三卡4卡乱码| aaaaaaaaa在线观看| 欧美激情综合亚洲五月蜜桃| 美国xxxxxx| 每日更新在线观看av| 子攻岳受h双性| 在线视频日韩| 久久精品无码一区二区三区| 久久伊人中文字幕有码|