Common problems of Foshan steel structure column base installation

Time:[2021-4-7]  Hits:2670

Installation of column base

 

(1) Embedded parts (anchor bolt) problems: overall or layout deviation; elevation error; screw thread without protective measures. The bolt holes on the bottom plate of the steel column are directly out of alignment, resulting in insufficient thread length.

 

Measures: the steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work, before the concrete pouring and tamping. Relevant dimensions must be rechecked and fixed firmly.

 

(2) The phenomenon of anchor bolt not vertical: the horizontal degree of the base plate of frame column column foot is poor, the anchor bolt is not vertical, and the horizontal error of embedded anchor bolt is too large after foundation construction. The columns are not in a straight line after installation, which makes the appearance of the house difficult to see, brings errors to the steel column installation, and affects the structural stress, which does not meet the requirements of the construction acceptance specification.

 

Measures: the anchor bolt installation should adhere to the bottom plate leveling with the lower adjustment bolt, and then the secondary grouting of non shrinkage mortar, and the construction method abroad. Therefore, during the construction of anchor bolt, steel bar or angle steel can be used to fix anchor bolt. Welding into a cage, improving the support, or taking some other effective measures to avoid the anchor bolt moving one place when pouring the foundation concrete.

 

(3) Anchor bolt connection problems: the anchor bolt of column base is not tightened, the base plate is not welded with the bottom plate; some anchor bolts with 2-3 threads are not exposed.

 

Measures: Welding bolts and nuts shall be adopted; outside chemical anchor bolts, fire-proof coating and heat insulation treatment shall be added to prevent the anchorage performance from being affected by fire; observation data of foundation settlement shall be supplemented.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 一级片免费观看视频| 日韩精品中文字幕在线| 免费观看高清影视| 879影视动漫h免费观看| 高清性视频hd| 第一次处破女18分钟免费| 久久久久久久男人的天堂| 在线观看免费日本| 久久国产精品99精品国产987| 九九在线| 久久6热| t66y最新地址一地址二地址三| 三浦步美juy974 在线| 农村新婚处破女小说| 在线91精品亚洲网站精品成人| 欧美拍拍| 222在线看片免费| 大柠檬导航香蕉导航巨人导航| 日本护士后进式猛烈动态图片| 男人午夜天堂| 91久久香蕉国产线看观看软件| 69热在线观看| 9984四虎永久免费网站| 在线avqqav片| 热久久国产欧美一区二区精品| ji巴cao死你个sao货啊| 严选漫画免费破解版| 91极品尤物在线观看| 俄罗斯aa毛片一级| 撸久久热这里只是精品| 荡夫艳妇| 欧美日韩福利| ass大特写| 日漫污| 久久亚洲不卡一区二区| 乱欲美女| 愉拍精品视频在线观看| 久热这里有精品| 中国老太太性生活| xx小younv超嫩| 美国zuzazu|