How to effectively improve the How can the installation accuracy of steel factory building be effectively improved?

Time:[2021-7-15]  Hits:3435

In the construction industry, as the use of steel factory building becomes more and more popular, more and more attention is paid to the production, transportation and installation technology of steel factory building, and at the same time, rapid development and continuous improvement have been achieved. How to further improve the production and installation accuracy of steel factory building and reduce costs are a topic facing the steel factory building industry. From the perspective of improving the installation accuracy of steel factory building, some issues and specific control methods that must be highly valued in the main links of production, transportation, and installation are analyzed and summarized.

 

 

Steel factory building production and transportation control


The precise size of the steel structure building is the basic and prerequisite to ensure the accuracy of the overall structural size and the smooth installation. Therefore, it is necessary to accurately grasp the straightness and distortion of the steel column, The distance from the connecting holes of the column and beam to the bottom of the column, the processing accuracy of the connecting holes, the straightness of the roof beams and the processing accuracy of the column-beam connecting plates, the position size of the tie bars or support connecting plates relative to the beam and column itself and the position size of the purlin brackets and etc.

 

 

In order to avoid and reduce the columns, beams, tie bars and other fittings deformation occurred during transportation, The transportation company should be required to add more support points in the full length range when binding the components, and use wood as hard as possible between them. The peripheral binding should be firm so as to minimize the deformation of the components due to vibration or heavy pressure in the transportation process. Two-point hoisting method should be used when loading and unloading. If the components are too long, a pole can be used and the hanging points should be appropriately increased; when the components are stacked at the worksite, the number of layers should be reduced as much as possible, generally no more than 3 layers, meanwhile, the supporting points should be appropriately increased to prevent the components from deforming under pressure. Never relax the control of transportation, lifting, unloading, stacking, etc. Otherwise, even if the steel structure plant’s components are made accurately, there will be problems in the transportation and other links, which will cause major troubles in the installation of the steel structure plant.

 

 


Quality control of steel factory building installation process

 

Before the steel factory building is installed, various preliminary work must be done in earnest. For example, before hoisting, the installer should retest the components, and hoisting can only be carried out under the premise that the components are not deformed and the installation dimensions are correct. In addition, after confirming that the strength of the foundation concrete meets the requirements of the specification, the installer should also inspect the embedded bolts or cup openings of the steel column foundation. If the position of the foundation and the elevation dimension are found to be deviated, the position should be recorded so as to adjust the position of the steel column.

 


In order to improve the installation precision of the overall steel factory building, it is best to choose the part of the workshop that has inter-column supports, tie rods and roof supports to install first. After this part of the steel column is hoisted, the axis and elevation of the steel column should be re-measured. After rectifying the deviation, the steel column is temporarily stabilized with the cable wind rope, and then the column supports, roof beams and inter-beam tie rods are installed. This is the so-called Rough installation.

 


All temporary fixing bolt holes that need to be welded on-site should be designed with long shaped holes, which is convenient for installation and adjustment, and is more beneficial to ensure the overall installation accuracy. The unilateral connecting holes of the purlin and other secondary components should also be designed with long shaped holes, of course, the related gaskets should be enlarged accordingly. Special attention should be paid to the fact that since the installation of the purlins is high-altitude operations and the wall is thin, if the installation holes are deviated and sprayed at high altitudes, it will indeed cause a lot of inconvenience, danger, and affect the appearance.


Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 金诺国际拍卖集团有限公司--金诺国际拍卖集团有限公司 | 铁行火车票_铁行火车票网上订票_铁行火车票客户端【铁行官网】 | 柔性测斜仪|滑动式测斜仪-华思(广州)测控科技有限公司 | 青山套筒_直螺纹钢筋连接套筒加工_全灌浆套筒灌浆料_半灌浆套筒生产-衡水安达机械设备有限公司 | 气调包装机厂家-真空包装机价格-气调包装机-锁鲜包装机-江苏大江智能装备有限公司 | 专业无机盐,化工产品检测公司,水处理剂检测公司,第三方水质检测机构—准诺检测 | 矿用三环链|锻打/焊接三环链|矿车万能环|三环链销子-济宁卓力工矿设备有限公司 | 景德镇古窑民俗博览区-国家AAAAA级旅游景区_全国旅游标准化示范景区_国家文化产业示范基地_国家级非物质文化遗产生产性保护示范基地--官方网站 | 老照片修复,修复老照片,老旧照片翻新-老照片修复网 | 河南郑州纯净水设备_厂家_价格_河南江宇环保科技有限公司水处理设备工厂 | 天力普电力科技有限公司| 烘干机_回转窑_破碎机_制砂机_洗砂机_球磨机-瑞光金属制品 | 压痕机_自动拆标机_瑞安市晨力机械有限公司 | 河南车用尿素设备_郑州车用尿素设备_河南江宇环保车用尿素液厂家 | 山东邹平华强无纺布有限公司 | 取样冷却器-射水抽气器-锅炉炉水取样冷却器-连灵动 | 上海祝融起重机械有限公司-德国耶鲁手拉葫芦|耶鲁手拉葫芦|耶鲁手扳葫芦|耶鲁电动葫芦经销代理 | 上海须进光电科技有限公司| 全自动码垛机|码垛机器人|高位码垛机械手|拆垛机|缠绕机|山东腾阳智能装备有限公司 | 球墨井盖厂家-铸铁井盖批发-雨水篦子生产厂家-安徽含山县林头新华铸造厂 | 正规网上赚钱网站「百赚网」专注在家赚钱的网络赚钱平台 | 可燃气体报警器-有毒有害气体检测仪-气体检测分析系统-宁波市高品科技有限公司 | 联塑管代理,联塑管厂家批发,中财管总代理,康泰管代理,康泰管厂家批发-邯郸市中枢贸易有限公司 | 消防改造安装,消防维修检测,消防工程安装,气体灭火施工安装,火灾烟感探测器清洗 | 青岛大倾角输送带厂家_橡胶挡边输送带_波纹状挡边输送带_大倾角输送带型号-青岛朗森橡胶有限公司 | 太原仪诚实验室设备有限公司| 唐山搬家公司-搬家公司电话价格-四通搬家 | 苏州不锈钢_江苏不锈钢_江苏不锈钢板_苏州模具钢_苏州合金钢_苏州特种合金_苏州不锈钢板_304不锈钢棒_苏州塞硒五金制品有限公司 苏州ERP定制|苏州CRM|苏州OA|苏州BPM|进销存管理系统-苏州中尚信息科技有限公司 | 呼吸家官网|肺功能检测仪生产厂家|国产肺功能仪知名品牌|肺功能检测仪|肺功能测试仪|婴幼儿肺功能仪|弥散残气肺功能仪|肺功能测试系统|广州红象医疗科技有限公司|便携式肺功能仪|大肺功能仪|呼吸康复一体机|儿童肺功能仪|肺活量计|医用简易肺功能仪|呼吸康复系统|肺功能仪|弥散肺功能仪(大肺)|便携式肺功能检测仪|肺康复|呼吸肌力测定肺功能仪|肺功能测定仪|呼吸神经肌肉刺激仪|便携式肺功能 | 南京三维动画制作公司,企业视频制作,视频拍摄,FLASH动画设计,宣传片拍摄,广告片制作 | 厦门公司注册-提供工商登记记账代理服务和营业执照代办地址与注册流程及费用 | 太阳能路灯-高杆灯-景观灯-玉兰灯-中华灯-LED市电-庭院灯厂家-扬州汉威光电科技有限公司 | 监控工程,安防监控公司,北京监控安装,北京安装监控,安装摄像头,北京监控维保,监控施工,北京监控维修,监控弱电工程,监控器安装,监控维护保养,监控工程设计,北京监控设备维修,监控报警安装,北京北方合力科技有限公司 | 箱包定制_广州箱包厂_双肩电脑背包_双肩旅行包_拉杆箱包_商务公文包_包包批发,深圳爱自由,礼品箱包定制,电话:400-0061-690 | 清洁度检测_手动颗粒萃取设备_自动颗粒萃取设备 - 厦门迈纳光学技术有限公司 | 上海办公室租赁-写字楼出租、创意产业园区厂房招商、孵化器众创联合办公空间出租网 | 湖北大洋塑胶有限公司|AGR|PPR|RTP|HDPE|e-PSP钢塑复合压力管道生产厂家 | 西安西雷脉冲功率技术有限公司-高压调制器/加速器与脉冲功率系统的研发/生产/应用推广/高压脉冲电源的应用研究/设计/生产和销售/高功率脉冲器件/材料与仪器设备的研发/生产和销售/高电压/大电流/强磁场环境的模拟及测试服务/会议会展服务/货物及进出口的业务/脉冲功率技术领域类的技术转让 | 全球环保研究网_生态环境绿色产业咨询部_生态文明建设行业智库 ? | 葡萄糖酸钠_食用葡萄糖_精萘-安徽鹏腾实业有限公司 | 河北热风机,电热暖风机,燃油暖风机,工业暖风机厂家安装,批发-河北嘉鹏冷暖风机有限公司 |