Analysis of key construction points of steel column and frame beam of high-rise steel structure

Time:[2021-8-25]  Hits:2244

Analysis of key construction points of steel column and frame beam of high-rise steel structure

1、 Analysis on key points of steel column construction of high-rise steel structure

Steel column is a vertical component that determines the floor height and the total height of the building, and its fabrication and processing needs to meet the corresponding specifications and standards. At the same time, the shrinkage deformation of the weld and the compression deformation caused by the vertical load need to be considered in the process of turning and blanking. Therefore, the turning and blanking length of the steel column is not equal to the design length, even if it is only a few millimeters, it can not be ignored. Moreover, when the sections of the upper and lower steel columns are completely equal, they are not allowed to be interchanged. It is required that each steel column shall be numbered differently and installed in place correctly. The welding of stiffener plate in rectangular or square steel column shall adopt nozzle electroslag welding according to the requirements of current specifications, and other forms such as opening on box plate and slot plug welding are not allowed.

2、 Analysis on key construction points of high-rise steel structure frame beam

In order to ensure that the joint area at the connection between the frame beam and the steel column has good ductility, connection reliability and floor height accuracy, during factory manufacturing, a cantilever beam (short corbel) is set at the position where the frame beam is located. The connection between the upper and lower flanges of the cantilever beam and the steel column adopts cut penetration weld, and the web adopts fillet weld. The frame beam is connected with the cantilever beam (short corbel) of the steel column, the upper and lower flanges are connected by the full penetration weld of the lining plate (also the arc striking plate), and the web is connected by high-strength bolts. Since the allowable deviation of reinforced concrete construction is far greater than the accuracy requirements of steel structure, when the frame beam is connected with reinforced concrete shear wall or reinforced concrete cylinder wall, the connecting plate of web can be opened with elliptical holes, which shall meet the requirements of hole edge distance. The blanking length of frame beam is also not equal to the design length, and the welding shrinkage deformation shall be considered. The welding shrinkage deformation can be calculated by empirical formula, and then checked according to the actual processing, so as to determine the exact length of the turning and blanking. High strength bolt connection or welding connection can be adopted for the connection of the upper and lower flanges of the frame beam. At present, most of them adopt full penetration welding connection with lining plate. During construction, the lower flange shall be welded first, and then the upper flange shall be welded. One end shall be spot welded for positioning, and then the other end shall be welded. The web is connected with high-strength bolts. It is necessary to fully understand whether friction type or pressure bearing type high-strength bolts are used in the design. The friction coefficient of friction type high-strength bolt should be selected reasonably. When using high-strength bolt group connection, the accuracy of hole position is very important. At present, template drilling and multi axis NC drilling are generally used for hole making. The former has low precision and the latter has high precision, so the latter should be given priority. When the formwork is used to make holes, the accuracy of the formwork shall be ensured to ensure the accuracy requirements of the assembly holes of high-strength bolts and site installation holes. In case of local deviation of hole position, reaming with reamer is only allowed. It is strictly prohibited to use gas cutting for hole expansion. If gas cutting is used for hole expansion, it shall be handled as a major quality accident.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 人人做人人爽人人爱秋霞影视| jzjzjz老师水多在线播放| 男男浪荡h啪肉np| 女人张开大腿让男人桶| 麻豆国产精品视频| 免费靠比视频| 69av视频在线观看| 男人天堂网2021| 魅惑乙女在线观看| 尤物在线观看网站| аⅴ天堂 在线8| 一级毛片免费观看不收费| 97国内免费久久久久久久久久| 欧美日韩亚洲国产一区二区综合| 陆婷婷和三个老汉| 男人都懂的网址在线看片| 欧美18gayvideos男| 巨乳美女脱内衣露巨乳与乳沟| 欧美一区=区三区| 日本人与黑人做爰巨大和娇小| 男女黄漫全身无遮挡网站动漫| 91短视频在线看| 男人和女人擦j视频软件| 伊人第一页| 久久嫩草影院免费看夜色| 日本护士撒尿xxxx视频| 99精品一区二区免费视频| 91蜜桃传媒一二三区| 日韩卡二卡3卡4卡| 亚洲综合色婷婷六月丁香| 啊用力嗯轻一点男同小说| 久久精品成人国产午夜| 4虎2022年最新lpr| 久久国产精品永久免费网站| 免费看美女洗澡视频的软件| 日本免费网站视频| 抖音污版| 福利片在线观看免费高清视频| 免费看欧美日韩一区二区三区| 操女生逼视频| 日日摸夜夜爽色婷婷97av|