www亚洲视频-www亚洲色图-www亚洲精品-www亚洲国产-青青草99热这里都是精品-青青草99热久久

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.huihuitaotao.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2769

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 在线观看一级 | 在线观看中文字幕 | 日日摸夜夜摸狠狠摸日日碰夜夜做 | 在线国产二区 | 日本免费观看网站 | 欧美影音先锋 | 青娱乐综合网 | 日本在线观看中文字幕 | 与子乱刺激对白在线播放 | 欧美精品第二页 | 羞羞答答免费人成黄页在线观看国产 | 天天色一色 | 日本不卡高清免费v | 三级黄色免费 | 日本成人xxx | 919影视| 日本在线观看 | 日本一本在线观看 | 免费在线观看一级片 | 一区二区在线免费视频 | 亚洲手机在线观看 | 男人天堂.com | 亚洲日韩中文第一精品 | 在线免费视频一区二区 | 色噜噜噜噜亚洲第一 | 女人牲交一级毛片 | 欧美日韩亚洲国产一区二区综合 | 日本www在线视频 | 一个人看的www免费高清视频 | 热99re久久精品这里都是精品免费 | 综合久久综合久久 | 中国chinese帅男gay | 老师涨奶难受快来吃 | 亚洲产在线精品第一站不卡 | 中文字幕亚洲日本岛国片 | 色综合久久夜色精品国产 | 成年王色男女免费观看 | 一本到视频 | 日本免费在线看 | 久久精品国产亚洲麻豆小说 | 欧美一级在线看 |