Installation details that must be paid attention to in steel structure processing

Time:[2021-9-22]  Hits:2155

Installation details that must be paid attention to in steel structure processing

In the construction of steel structure engineering, there are many details to pay attention to, especially in the installation process. We need to carefully operate and inspect the steel structure before, during and after installation.

1. Before the installation of steel structure processing members, the quality of steel members shall be checked. In case of deformation and defects, the steel members shall be measured and corrected according to the engineering characteristics within the range of allowable deviation. For the welding of thick steel plate and dissimilar steel plate and the main process of high-strength bolt installation, the process test shall be carried out before installation, and the corresponding key points of construction process shall be prepared.

2. When the expanded assembly unit is used for installation, the strength and stability of steel members that are easy to deform shall be checked, and reinforcement measures shall be taken when necessary; During the comprehensive installation of steel members, it shall be divided into several independent units. After the installation of all steel members of each unit, a spatial stiffness unit shall be formed.

3. During steel structure processing, the columns, beams, roof trusses, supports and other main components of steel members shall be corrected and fixed immediately after they are installed in place. The steel members installed on the same day form a stable space system. During the installation and correction of steel structure, corresponding adjustment measures shall be taken according to the influence of external environment such as wind force, temperature difference and sunshine and welding deformation.

4. When using the installed steel structure to hoist other components and equipment, the consent of the design unit shall be obtained, the checking calculation shall be carried out, and corresponding measures shall be taken.

5. During steel structure processing, 70% of the contact surfaces of the nodes tightened according to the design requirements shall be close to each other. Check with a 0.3mm thick feeler gauge, and the sum of the insertable areas shall not be greater than 30% of the total contact jacking area; The edge clearance shall not exceed 0.8mm.

6. When installing high-strength bolts, the bolts shall freely penetrate into the holes and shall not be used as temporary installation bolts. At the same time, the installation of high-strength bolts shall be tightened in sequence, and shall be tightened outward in the order of the center of the bolt group, and the final tightening shall be completed on the same day.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 青青爽| 日本三级3d漫画在线观看| a天堂视频在线| 亚洲自拍偷拍区| 免费看w片的网站在线看| 99久久er热在这里都是精品99| japanesebondage女警| 欧美成人极品怡红院tv| 久99久视频| 成人免费福利| 玖草视频在线观看| 男人女人靠逼| 东北农村妇女bbbxxx| jijzzizz18女学生| 日本人与黑人做爰巨大和娇小| 综合免费一区二区三区| f性欧美| 99在线精品国产不卡在线观看| 一个人免费观看在线视频www| 免费黄色在线观看视频| 给我一个可以看片的www日本| 三级做爰蜜桃成熟时33d| 日本伦理影院| 欧美猛烈性xbxbxbxb| 一级特黄aaa大片免色| 成人免费福利| 福利精品| 看全色黄大色黄大片爽一下| 年轻护士2放荡女教师年轻护士3| 综合免费一区二区三区| 美女尿急夹腿尿裤子gif图| 91麻豆网| 最新国产午夜精品视频不卡| 美女鸡鸡对鸡鸡| 日韩中文字幕在线观看视频| 欧美日韩综合高清一区二区| 动漫美女小鸡鸡| 白色蕾丝美妇旗袍成熟小说| 一本大道加勒比久久综合| 男男同志video| 欧美巨大肥奶bbw|