Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:2384

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久精品视屏| 男女男精品视频在线观看| 承德招聘信息最新招聘2023| 日本japanese丰满| 那些年我们正年轻免费全集观看| 2021中文字幕在线观看| 全是肉的高h短篇列车| 波多野结衣教师在线观看| 欧美男男gay1069大长吊| 8x8x国产在线| 一级国产精品一级国产精品片| 99精选视频| 91精品国产91久久久久青草| 日本女人毛茸茸| 日本天堂在线播放| 艹美女老师| 99热久久这里只精品| 日韩欧美精品一区二区三区| 日产精品一线二线三线区动漫| 一级毛片在线免费看| 日本中文字幕在线| 久久99国产综合精合精品| 欧美精品九九99久久在观看| www.av在线| 在线看成品视频入口免| 办公室小说h| 三上悠亚ssni-432在线观看| 久久机热re这里只有精品15| 伊人色视频| 爱啪导航| 父子肉文高h| 中文字幕在线天堂| 久热只有精品| 91精东果冻蜜桃星空麻豆| 高清性视频hd| 日本免费无遮挡吸乳视频在线观看| 久久99精品久久久久久久不卡| 久热996re这里有精品| 日本理论片午午伦夜理片2021| 在线a人片天堂免费观看高清| 最新日本中文字幕|