Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:1945

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日韩欧美亚洲综合一区二区| 日本丰满大乳欲妇三级| 高清欧美日本视频免费观看| 成人高清在线| 99久久精品免费观看国产| 成人福利在线免费观看| 在线小视频国产| 轻点好疼好大好爽视频| jj视频网站免费| 一个人看的www动漫高清免费| 成人中文在线| 青青青国产色视频在线观看| ass俄罗斯肥妇肥臀pics| footjob在线| 高清中国一级毛片免费| 白丝袜老师奖励我吃她的脚| 一区二区不卡在线| 旧版草莓视频| 男女xx00动态图120秒| 九九视频高清视频免费观看| 艳妇乳肉豪妇荡乳武则天| 全亚洲最大的免费私人影剧院| 18在线观看的| 欧美熟juliaann厨房| 颜面facesitting口舌| 欧美日韩一区二区不卡| 成年人免费在线视频观看| 日本高清免费xxx在线观看| 在线观看视频亚洲| 欧美国产综合日韩一区二区| 明星赵丽颖和外卖员的小说| 麻豆国产在线观看免费| 久久亚洲精品成人777大小说| 日本最新男男gayjapanhd| 毛片网在线| 日本无吗中文字幕免费婷婷| 99riav9 精品香蕉免费大视频| 4438亚洲| 久9青青cao精品视频在线| 欧美va亚洲va在线观看蝴蝶网| 成人免费观看国产高清|